All technical leaflets required for this plant such as piping and 2 Controlled operation
wiring diagrams, descriptions, maintenance instructions, trouble- Change the load controller (14) manually over to
shooting manual, etc. are enclosed in the Manual ’Operating In- automatic operation again.
structions’. 3 Operational check of flame detector
1 Start-up 3.1 Pull the flame sensing element (flame scanner) out of its
1.1 Switch on the automatic sequence control. mount.
1.2 Press the “Reset” pushbutton when the “Trouble” signal 3.2 Darken the flame scanner window (the fuel oil supply
lamp must be cut off within one second and the “Trouble”
lights up.The “Operation” signal lamp should then light signal lamp must light up.)
up, indicating that the safety interlock circuit (e.g. 4 Shut-down
pressure or temperature limit controls, water level limit 4.1 Switch off the “Control System”..
controls, etc.) is closed and all electric motors, such as 4.2 Wait until the compound regulator has reached the “Low
the burner and fan motors, are in operation. Fire”
1.3 Wait for the end of the purge period. position 1.
Attention: 4.3 Switch off the automatic sequence control.
If the furnace is not purged thoroughly and 5 Shut-down in case of trouble or danger
long enough, there is danger of explosion. 5.1 Close the manual rapid shut-off valve.
5.2 Wait until the compound regulator has reached the “Low
Fire”
1.4 Observe the ignition cycle.
position 1.
1.5 When starting a cold plant, warm it through with manual
5.3 Switch off the automatic sequence control.
control in accordance with the instructions furnished by
5.4 Trace and correct the cause of the trouble (for hints see
its manufacturer. For this purpose, the load controller (14)
the “Trouble Shooting Manual”).
is adjusted to manual operation and the burner load is set
6 Restarting after any trouble
manually.
6.1 Open the manual rapid shut-off valve.
6.2 Restart the plant as described under item 1
“Start-up”.
12 11 11 15
5
Ignition fluid
14
6
13 11 11
12
Fuel oil
8 16
Power supply
10
Technical Documentation
SAACKE GmbH & Co. KG SAACKE GmbH & Co. KG Tel. (04 21) 64 95-0
Südweststraße 13 P.O.B. 210261 Fax (04 21) 64 95 22 4
28237 Bremen 28222 Bremen E--Mail info@saacke.de
0 -- 0001 -- 4078b/02
Germany Germany Internet http://www.saacke.com
2006---06---29 Page 1/1