AL JOOD TRADING & CONTRACTION COMPANY LLC

TENDER NO 96-2013, EPC FOR CONSTRUCTION OF KHASAB NEW POWER STATION

Risk Ratings
Activity : Civil Works- Concrete, Block work, Painting, Concerned Department: RAEC Project Department 6-9 High Risk
Steel work 3-4 Medium Risk
1-2 Low Risk

Risk Rating Score Residual Risk

Risk Rating (R=SxL)

Risk Rating (R=SxL)


Likelihood (L)

Likelihood (L)
Severity (S)

Severity (S)
Hazards Effects/
Sl Hazards/ Threats Control Measure Action Status
Consequences

1. Follow safe work procedure


2. Use adequate PPE. Safety Shoes,
Hand Gloves, Coverall, Glass
breathing apparatus (mask) etc.
3. MSDS shall be made available at
site and it shall be communicated
4. Crew working with cement or Training shall
Exposure to Chemical- nearby shall must wear the nose be provided
Human injury, burn, irritation mask
1 Cement, paint and and SOP shall
1

1
Lungs and heart disease 5. In case of exposure to chemical
Epoxy be
follow the MSDS and clean the implemented
exposed area by clean running
water
6. Don’t use the contaminated
clothing
7. Every day prior to start the work
TBT shall be conducted

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-005 Page 1 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFFollow
KHASAB NEW
the safe workPOWER STATION
2. Don’t try to carry the heavy
materials.
3. Use the proper lifting and carrying
technique
4. Keep the load as reasonable as
possible closer to the body Training shall
5. Wear safety shoes with toe be provided
2 Slip and trip Human injury protection and adequate type of and SOP shall

1
hand gloves. be
6. Manual handling training shall be implemented
given to all
7. Maintain high quality of
housekeeping all the time
8. Keep the access and agrees clear
9. Don’t keep the work tools speeded
hear and there

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-005 Page 2 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFFollow
KHASAB NEW
safe work POWER STATION
procedure
2. Use correct type of scaffolding and
erect it properly
3. Platform for the scaffolding shall be
erected properly and there shall be
a maximum 1 cm gap between two
palate
4. Toe board and mid rail shall be
erected
5. Safety harness shall be used and
double hook lanyard shall be
attached with stable anchorage
point. Training shall
6. Toolbox talk shall be conducted by be provided
Human Injury competent person
3 Work on height and SOP shall

1
Equipment Damage, fatality 7. Periodic inspection by competent be
person shall be carried out implemented
8. Scaffolding tag such as – safe for
use, unsafe for use or maintenance
shall be attached at the access of
scaffolding
9. Proper and secured access shall be
provided.
10. Only required equipment or
materials shall be stored at the
platform
11. Scaffolding shall be erected in ¼
ration of height and breadth

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-005 Page 3 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION OF KHASAB NEW POWER STATION
1. Follow safe working procedure Training shall
Falling of materials or 2. Don’t keep the materials or tools at be provided
Human injury, material edge of the platform
4 equipment from the and SOP shall

1
damage 3. All the working crew shall must
scaffolding be
wear the hard hat with chin strap implemented

1. Follow safe working procedure


2. All the materials and equipment
shall be racked properly
3. Only allowed heights of racking
shall be used
4. Blocks shall be kept adequately and
at a maximum height of two bundle Training shall
Fall or un-stablemen of be provided
Human Injury, materials of block.
5 materials or and SOP shall

1
damage 5. Adequate access and agrees shall
equipment be
be maintained while storing the implemented
materials
6. Use adequate PPE- Hard Hat, Safety
Shoes with toe protection and steel
plate, use hand gloves and other
required PPE

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-005 Page 4 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION OF KHASAB NEW POWER STATION
1. Follow safe work procedure
2. Use good condition tools and check
it before use
3. Do not alter the wheel guard
always use the cutter and grinder
with guard.
4. Use industrial type power socket
with adequate rating 13 amp Training shall
5. Only competent person shall be be provided
Human Injury, Electrical
7 Grinding and cutting allowed for cutting and grinding and SOP shall

1
Shock, Fire
work be
6. Use fire proof canopy to protect the implemented
spark and flash
7. Supervisor shall conduct tool box
talk every day morning
8. Keep fire extinguisher such as CO2
and DCP within three meter of
work areas.
9. Don’t use the half or broken wheels

Assessed by: Mohammed Imteyaz Khan Reviewed & Approved by: Ajesh Chandran

Position: Head of HSE Position: Project Manager

Signature: Signature:

Date: Date:

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-005 Page 5 of 5