Professional Documents
Culture Documents
vem
p a
e
r et ion
nc ans
STRUT BEAM
CHB-
DETAILS:
DRAINAGE
1. VERTICAL BARS: 12MM Ø
EVERY 600MM O.C. STRUT BEAM
DETAILS:
2. HORIZONTAL BARS: 12MMØ 1.
2.
STIRRUPS: 10MM Ø
MAIN BARS: 10MMØ
EVERY 2ND LAYER 3. SPACING EVERY 2 METERS
3. CHB 6"
4. LEAN CONCRETE, 50 MM
5. GRAVEL BED, 50MM
o
c xp 1.2m LEVEL
EXISTING HOUSE 2
e
CULVERT
2.0m X 2.0m
R.U.D
CUL
VER
M2 T
M1
COOLING PADS
VENTILATING FAN
M2
M1 0.50m H ZOCALO WALL
M2
M1
M2
M1
EL. -1.50m
PROPOSED
EXI
0.50m H ZOCALO WALL
CULVERT
COOLING PADS
CONTROL ROOM
FOOT BATH
ANTE ROOM
FEEDS WEIGHER
SILO
SILO
ST
FEED HOUSE
I N G
E
MAIN GAT
B
CATC
H BA CR W/ SHOWER
SIN
MED ROOM
STAFF HOUSE
A
MARI SEPTIC GUARD HOUSE
TANK
R
M
AIN
LOG
GA
6003.3464
TE
AN G
PROPOSED PROJECT ARCHITECT / CIVIL ENGINEER ENGINEER OWNER SHEET CONTENT SHEET NUMBER
A
ENGR. ADONIS C. BIBAT ENGR. ADONIS C. BIBAT 01 6
Y
PEE PME ECE SANITARY ENGINEER
FOOTING DESIGN
PRC REG. NUMBER PTR. NUMBER PRC REG. NUMBER PTR. NUMBER A-1
BRGY. LOCATION: STO NINO, BINUGAO TORIL,. DAVAO CITY BRGY. LOCATION:
DATE TIN NUMBER DATE TIN NUMBER
R O A