Work Order N°: WO17683 WAFA Desert

Maintenance Type: CO DEPARTMENT Static


PRIORITY NORMAL SCHD START SCHD FINISH

WO17683
LOCATION Fuel Station 11-Dec-21
DESCRIPTION: Fuel station tank

TAG OF EQUIPMENT : N/A REQUESTER SP Failure Code:

EQUIPMENT
DESCRIPTION Fuel Tank EXECUTER Static DESCRIPTION

WORK ORDER REQUEST:


To transfer the fuel tank from JTS to fuel station & check the holes & blinding
of the tank

MAINTENANCE SPT PLANNING SPV

DATE: 11-Dec-21 DATE: 11-Dec-21 DATE: 11-Dec-21

PREPARED BY :

DATE &
NAME: POSITION PLANNING SIGN: 11-Dec-21

Equipment Running Hours


Date:
(for Rotating Machines) Tasks Performed:

Section N° Spec. Task Seq. Performed Task Description Spent Man Hours

10 INFORM PRODUCTION SPV OF BEGINNING THE WORK


20 OBTAIN WORK PERMIT
30 TAKE ALL SAFETY PRECAUTION IN TO CONSIDERATION

40 To transfer the fuel tank from JTS to fuel station & check the holes & blinding of the tank
50 INFORM PLANNING SPV OF ENDING THE WORK
60 CLOSE AND RETURN THE WORK PERMIT
DATA FROM THE EQUIPMENT

MANUFACTURER

MODEL NUMBER

SERIAL NUMBER
MISC. INFO (SET
POINT, RANGE,
OPERATING
PARAMETERS,
ETC.)

USED MATERIALS

Material/Tool Utilized Code Material/Tool Description

Material/Tool Utilized Code Material/Tool Description

Material/Tool Utilized Code Material/Tool Description

Material/Tool Utilized Code Material/Tool Description

Failure Description

Failure Code:

Failure Causes Description

Failure Cause Code:


Executor Recommendations & Remarks System- Equipment -Component Status

Good Medium Bad

Production Supervisor Work Acceptance Signature & Date : Executor Signature & Date: