JAP CONSTRUCTION & DEVELOPMENT CORPORATION

JAPCON Luzon Ofc : 3rd Floor Citi-Prime Properties Building, corner Monark Subdivision,
Alabang – Zapote Road, Pamplona, Las Pinas City
Telefax : 799-7300; 874-0125

July 24, 2020


YMAZ BUILDERS
129 Congressional Avenue,
Barangay Bahay Toro, Quezon City

Project : Gonzalo Puyat


Location : Quiapo Manila
Subject : Computation for number of Blows required per mm of Pile Penetration

USING HYDRAULIC HAMMER HH 5


HILEY’S FORMULA

100 eh EH
P= x Wr+n ² ℘ 1
1 x
S+ (C 1+ C 2+C 3) Wr+ ℘ FS
2
Where :

P = Required Bearing Capacity of Pile, (KN)


S = Required Amount of Point Penetration per Blow, (m,mm)
eh = Efficiency of Hammer, (85%)
EH = Maximum Rated Energy Output per Blow, (KN. m)
n² = Coefficient of Restitution, (0.50 cm)
FS = Factor of Safety 2.0 – Temporary Loading
4.0 – Permanent Loading

C1 = Elastic Compression of Pile Head and Pile Cap


0.20-0.25 (for medium driving)
0.30-0.40 (for hard driving)
0.41-0.50 (for very hard driving)
C2 = Elastic Compression of Pile
0.40 - 0.60 (for medium driving)
0.61- 0.85 (for hard driving)
0.86 - 0.95 (for very hard driving)

100 eh EH
P= x Wr+n ² ℘ 1
1 x
S+ (C 1+ C 2+C 3) Wr+ ℘ FS
2

Fabrication Shop / Yard : Website Address :


Malawak Street, PintongBato, http://www.japconstruction.com
Barangay Guyong Sta. Maria Email Address :
Bulacan info@japconstruction.com

ISO 9001 : 2008


JAP CONSTRUCTION & DEVELOPMENT CORPORATION
JAPCON Luzon Ofc : 3rd Floor Citi-Prime Properties Building, corner Monark Subdivision,
Alabang – Zapote Road, Pamplona, Las Pinas City
Telefax : 799-7300; 874-0125

USING HILEY’S FORMULA

Wr+n ² ℘ 1 C 1+C 2+C 3


S=¿ x )-
Wr+ ℘ FS 2

Where:

100 mm 1 1
S = =2 mm N = = =0.5 blows / mm
50 S 2

2500 kg x 9.81 m' s ²


Wr = Given value = =24.525 KN
1000

7938(9.81)
Wp = 0.35 x 0.35 x 27 x 2400 = = 77.87 KN
1000

6150 X m
EH = x =6988.64 kg . m=7000 kg .m x 9.81 2 =68.56 KN . m
22 25 s
eh = 85%

FS = 4
C1= 0.20 (for medium driving)
C2 = 0.40 (for medium driving)
C3 = 0.25 (for all types of driving)
Size of Pile = 0.35m x 0.35m
Length of Pile = 27m
P = Required Bearing Capacity of Pile, KN

100 eh EH
P= x Wr+n ² ℘ 1
1 x
S+ (C 1+ C 2+C 3) Wr+ ℘ FS
2

100(0.85)(68.56) 24.525+ 0.5²(77.87) 1


= x X
2+ 0.5(0.2+0.40+ 0.25) 24.525+ 77.87 4

Fabrication Shop / Yard : Website Address :


Malawak Street, PintongBato, http://www.japconstruction.com
Barangay Guyong Sta. Maria Email Address :
Bulacan info@japconstruction.com

ISO 9001 : 2008


JAP CONSTRUCTION & DEVELOPMENT CORPORATION
JAPCON Luzon Ofc : 3rd Floor Citi-Prime Properties Building, corner Monark Subdivision,
Alabang – Zapote Road, Pamplona, Las Pinas City
Telefax : 799-7300; 874-0125

P = 258.12 KN (Considering FS = 4)

P = 1032.471 KN (Not Considering FS = 4)

PILE DRIVING RECORD

CUSTOMER: ________________________________ DATE: ______________


PROJECT: ________________________________
LOCATION: ________________________________ FILE NUMBER: ________
PILE LOCATION HAMMER TYPE
SIZE OF PILE WEIGHT OF RAM
LENGTH OF PILE
REQ’D BLOWS/m FREE FALL HEIGHT
DATE DRIVEN ENERGY OUTPUT
DATE CASTED
TIME STARTED
TIME FINISHED

Meter/ Blows Meter/s,m Blows Meter/sm Blows Meter/s,m Blows Meter/ Blows
s,m s,m
0.1 2.1 4.1 6.1 8.1
0.2 2.2 4.2 6.2 8.2
0.3 2.3 4.3 6.3 8.3
0.4 2.4 4.4 6.4 8.4
0.5 2.5 4.5 6.5 8.5
0.6 2.6 4.6 6.6 8.6
0.7 2.7 4.7 6.7 8.7
0.8 2.8 4.8 6.8 8.8
0.9 2.9 4.9 6.9 8.9
1.0 3.0 5.0 7.0 9.0
1.1 3.1 5.1 7.1 9.1
1.2 3.2 5.2 7.2 9.2
1.3 3.3 5.3 7.3 9.3
1.4 3.4 5.4 7.4 9.4
1.5 3.5 5.5 7.5 9.5
1.6 3.6 5.6 7.6 9.6
1.7 3.7 5.7 7.7 9.7
1.8 3.8 5.8 7.8 9.8
1.9 3.9 5.9 7.9 9.9
2.0 4.0 6.0 8.0 10.0

RECORDED BY: PILE DRIVING INSPECTOR:

Fabrication Shop / Yard : Website Address :


Malawak Street, PintongBato, http://www.japconstruction.com
Barangay Guyong Sta. Maria Email Address :
Bulacan info@japconstruction.com

ISO 9001 : 2008


JAP CONSTRUCTION & DEVELOPMENT CORPORATION
JAPCON Luzon Ofc : 3rd Floor Citi-Prime Properties Building, corner Monark Subdivision,
Alabang – Zapote Road, Pamplona, Las Pinas City
Telefax : 799-7300; 874-0125

CERTIFIED CORRECT: BY: CONCURRED BY:


PROJECT ENGINEER PROJECT ENGINEER

Computation of Pile Bearing Capacity as per DPWH:

Pall= ( 167S+2.54 )( Wr +℘ )
eh Ehu Wr +01.6 ℘

Where:

Pall = Allowable Pile Bearing Capacity (KN)


eh = Hammer Efficiency
EH = Hammer Energy Rating (KN.m)
Wr = Weight of Ram (KN)
Wp = Weight of Pile and other driven Weight (KN)
S = Average Penetration per Blow the Last 150mm of Driving (mm)

Given:

100 mm 1 1
S = =2 mm N = = =0.5 blows /mm
50 S 2
2500 kg x 9.81 m' s ²
Wr = Given values = =24.525 KN
1000
7938(9.81)
Wp = 0.35 x 0.35 x 27 x 2400 = = 77.87 KN
1000
6150 X m
EH = x =6988.64 kg . m=7000 kg .m x 9.81 2 =68.56 KN . m
22 25 s
eh = 85%

Pall = ( 167 x0.5+


0.85 x 68.67
2.54 ) X(
24.525+0.16 ( 77.87 )
24.525+77.87
)

Pall = 1158.154 KN

Fabrication Shop / Yard : Website Address :


Malawak Street, PintongBato, http://www.japconstruction.com
Barangay Guyong Sta. Maria Email Address :
Bulacan info@japconstruction.com

ISO 9001 : 2008


JAP CONSTRUCTION & DEVELOPMENT CORPORATION
JAPCON Luzon Ofc : 3rd Floor Citi-Prime Properties Building, corner Monark Subdivision,
Alabang – Zapote Road, Pamplona, Las Pinas City
Telefax : 799-7300; 874-0125

Fabrication Shop / Yard : Website Address :


Malawak Street, PintongBato, http://www.japconstruction.com
Barangay Guyong Sta. Maria Email Address :
Bulacan info@japconstruction.com

ISO 9001 : 2008

You might also like