INTRODUCTION
1
CHAPTER 2
• PLACE: Thirukanurpatti
• AREA: 900 Sq.ft
SPECIFICATION:
Cash counter
Staff room
Toilet
2
CHAPTER 3
SYNOPSIS
• The engineering profession must have a clear idea about PLANNING,
DESIGNING AND ESTIMATING cost analysis of civil engineering
structure.
• Have the above in mind we have taken the planning, designing and
analysis of SUB POST OFFICE BUILDING AT KADAVARAYAN
PATTI as our project.
3
CHAPTER 4
PROVISIONS
THE SUB POST OFFICE BUILDING AT KADAVARAYAN PATTI
CONSIST OF THE FOLLOWING PROVISIONS
4
CHAPTER 5
SITE SELECTION
PLACE: KADAVARAYAN PATTI
• CLIMATE CONDITION:
The intensity of the rainfall and sub soil water level should be low as to
avoid dampness in the building.
• SUB-SOIL CONDITION:
5
• SURROUNDING:
The situation and surrounding of the site must as to suit the purpose for
which the building it to be constructed.
6
CHAPTER 6
MATERIAL USED IN CONSTRUCTION
Following are the materials used for the construction of a Building
• Bricks
• Sand
• Cement
• Stone
• Coarse Aggregate
• Fine Aggregate
• Timber
• Metal
• Floor Tiles
• Roof Tiles
• Reinforcement
• Plastic Material
• Doors& Windows
• Coloring Material
• White Cement
• Paints & Varnishes
• Brick Ballast
• Sanitary Materials
• Water
• Finishing Tiles. Etc…
7
CHAPTER 7
DESIGN OF SLAB
DESIGN OF SLAB FOR HALL
(TWO WAY SLAB)
• OBSERVED DATA:
Dimensions = 6.00 x 3.00 (lx =6m& ly =3m)
Width of support = 200mm
weathering course = 1KN/m²
M20 & Fe415
• SIDE RATIO OF SLAB:
ly/lx = 3/6
= 0.5<2 (It is a two way slab)
• DEPTH REQUIRED:
dx = Span /BV X MF (BV=28, MF=2.14)
= 6000/28 X 2.14
= 100mm
dy = dx -10
= 100-10
= 90mm
D = dx + d‘
= 100+10
= 110mm
8
• EFFECTIVE SPAN:
SHORTER SPAN (lx):
left = b/2 + 1x + b/2
= 200/2 + 6000 + 200/2
= 6200mm
left = lx + dx
= 6000 + 100
= 6100mm
LOAD CALCULATION:
9
BENDING MOMENT:
x y a b
ἀx : 0.40 0.50 0.062 0.072
ἀy: 0.55 0.45 0.082 0.092
ἀx = a + (a – b/y – x)(x’-x)
= 0.062 + (0.062-0.072/0.50-0.40)(0.5-0.4)
= 0.062 + 0.10
= 0.162
ἀy = a-(a-b)/(y-x)(x’-x)
= 0.062 – (0.092-0.082/0.55-0.45)(0.5-0.4)
= 0.062- 0.05
= 0.012
Mux = ἀx x Wu x leftx²
= 0.162 x 10.13 x 6.1²
= 61.06 KNm
= 61.06x10^6Nmm
Muy = ἀy x Wu x leftx²
= 0.012 x 10.13 x 6.1²
= 4.52KNm
= 4.52x10^6Nmm
CHECK FOR DEPTH:
Mux = Qu bd²
d = 61.06x10^6 / Qu x b
= 61.06x10^6 / 6.76 x 1000
10
= 95.03mm ( d required < d provided )
NAGATIVE MOVEMENT AT CONTINUOUS EDGE
Mux = 0.87 ƒ y Astx dx (1-fyAst / bd x fck)
27.83 x10^6 = 0.87x415x Ast x 400(1-415 Ast/20x200x400)
27.83 x10^6 = 144.42 x 10³ Ast (1-2.59x10^-4Ast)
27.83 x10^6 = 144.42 x 10³ Ast -37.46Ast²
37.46Ast ²- 144.42 x 10³ Ast + 27.83 x10^6 = 0
Ast = 293.20 mm²
EDGE STRIP:
Fe415:
Ast min = 0.12% x b x D
= 0.12/100 x 200 x 350
= 84 mm²
• AREA:
ast = (3.14/4) x d²
= (3.14/4) x 18²
= 254.47 mm²
RODS REQUIRED:
No. of rods = Ast / ast
= 293.20/254.47
= 1.19rods say 2rods
Provided 18mm Ø@ 2 No’s of rods
• AREA
ast = (3.14/4) x d²
= (3.14/4) x 25²
= 490.87 mm²
No.of rods = Ast / ast
= 203.20/490.87
= 0.59 rods say 1 rods
Provided 25mm Ø@ 1 Nos of rods
11
CHAPTER 8
12
= 0.71 KNm
= 0.71 x 10^6 Nmm
• CHECK FOR DEPTH:
Mu = Qu b d²
d = 0.71 x 10^6 / Qu x b
= 0.71 x 10^6 / 2.75 x 1000
= 16.04 mm (d required< d provided)
• REINFORCEMENT DETAILS:
•
Mux = 0.87 ƒ y Ast d (1-fyAst / bd fck)
13
• CHECK FOR SHEAR:
Vu = Wu x left
= 3.94 x 0.6
= 2.36 x 10³ N
£v = Vu / bd
= 2.36 x 10³ x 1000 x 50
= 0.05 N/mm²
• CHECK FOR STIFFNESS
%Ast = Ast x 100 / b x d
= 40x 100/1000x50
= 0.08
• OBSERVED DATA:
DOOR OPENNING = 1.2M(Width)
Height(h) = 2.1m
Wall thickness = 200mm
Bearing thickness = 200mm
M20 & Fe415
ASSUME:
width of lintel equal to width of wall = 200mm
Thickness of lintel equal to width of wall = 150mm
EFFECTIVE DEPTH:
Effective depth of lintel (d) = D-d’
= 150-25
= 125mm
CHECK FOR LINTEL HEIGHT:
0.886 X 1 = 0.886 X 1.325
= 1.174 M
Height(h) = 2.1m
14
TRIANGULAR SECTION:
Triangular section(W1) = Volume x Density (L=1m)
= ½ x 0.2 x 2.1 x 1.325 x 19
= 5.29KN/m²
RECTANGULAR SECTION:
Rectangular section(W2) = L x b x D x Density
= 1.325x0.2x0.15x25
= 0.99KN/m²
BENDING MOMENT:
15
CHAPTER 9
STRUCTURAL DRAWING
Fig.1
16
Fig.2
17
18
CHAPTER 10
PLAN
Fig 10.1
19
ELEVATION
Fig 10.2
20
SECTION
Fig 10.3
21
CHAPTER 11
DETAILED DESCRIPTION
work will be carried out to a depth of 1.5 m below the ground level. The
foundation concrete 1:5:10 mix using 40mm hard granite broken stone jelly will
be provided to a depth of 600mm , 300mm to a width of 1200mm,
750mm,600mm, respectively.
22
o Foundation should be of 1st class brick work in lime or cement
morter over a bed of lime or cement concrete.
BRICK WORK
23
reinforcement.
CONCLUSION
24