FLOOR FINISH=1𝐾𝑁/𝑚2
LIVE LOAD=2 𝐾𝑁/𝑚2
𝑙𝑥 = 4000𝑚𝑚, 4𝑚
𝑙𝑦 = 4000𝑚𝑚, 4𝑚
𝑙𝑥 4
𝑙𝑦
=4=1<2
∴This is two way slab
𝐸𝑓𝑓.𝑠𝑝𝑎𝑛
𝐸𝑓𝑓.𝑑𝑒𝑝𝑡ℎ
=20 × modification factor
Fs= 0.58 fy
=0.58 × 415
=240 N/𝑚𝑚2
𝐴𝑠𝑠𝑢𝑚𝑒𝑑𝑝𝑡. =0.4%
∴modification factor=1.3
𝐸𝑓𝑓.𝑠𝑝𝑎𝑛
Effective Depth=
20× 𝑚𝑜𝑑𝑖𝑓𝑖𝑐𝑎𝑡𝑖𝑜𝑛 𝑓𝑎𝑐𝑡𝑜𝑟
4000
=
20× 1.3
=153.85≈160mm
DL of slab=0.19×1×2.5
=4.75 KN/m
𝑙𝑦
𝑙𝑥
=44=1
𝛼𝑥=0.062
𝛼𝑦 =0.062
Mx=× 𝑥 × 𝑤 × 𝑙 × 𝑥2
=0.062×13.125×42
=13.02×106Nmm
Annex G, Cl 4.1.1(c)
𝑀𝑢𝑙𝑖𝑚 =0.138×fck×𝑏𝑑2
=0.138×25×1000×1602
=88.32×106Nmm
∴𝑀𝑢𝑙𝑖𝑚 >𝑀𝑥
Also 𝑀𝑢𝑙𝑖𝑚 >𝑀𝑦
Annex 4 Cl 1.1(b)
𝐴𝑠𝑡×𝑓𝑦
𝑀𝑢𝑥 =0.81×fy×Ast×d×{1 − 𝑓𝑐𝑘×𝑏×𝑑}
𝐴𝑠𝑡×415
13.02×106=0.87×415×Ast×160×{1 − 25×1000×160}
Ast=230.92𝑚𝑚2
SPACING
Providing 8mm Φ bars @210mm c/c spacing along both the spans.
𝑆𝑚𝑎𝑥 = 3×d
=3×160
=480mm
𝑆𝑚𝑎𝑥 =300mm
Hence spacing OK.
STEP 6:- Check for Shear
Overall depth=165mm
1.3−1.25
K=1.25+150−175×(165×150)
=1.27
𝐾𝜏𝑣 =1.27×0.29
=0.368
∴𝐾𝜏𝑣 >𝜏𝑣
𝑀
Ld≤ 𝑉 1 +𝑙𝑜
𝑢
RHS,
M1=13.02×106 Nmm
𝑉𝑢 =26.25×103
250
𝑙𝑜 = 2
-20
=105mm
13.02×106
= + 105
26.25×103
=749.8mm
LHS:
𝛷𝜎𝑠
Ld=
4×𝜏×𝑏×𝑑
8×(0.87×415)
=
4×1.4×1.6
=322.366mm
LFS<RHS
Hence the design is safe in anchorage.
Bent up bars 8mmФ @210mm c/c
STEPS PROCEDURE IN BEAM DESIGN:-