WORK DESCRIPTION

Excavate sand, marl (.250mx.250x1.2l) using handtools , 2man using handtools

Messhall: 50percent of occupants is the area

Common toilet: 100 man =12 toilets & shower, every 10 person add 1 toilet

Air conditioner: 16sqm. Min - 24msqm max. per 1 AC

Floor space sleeping room: 1man = 4.6sqm

Tack coat for foundation & asphalt 1ltr/ sqm.

Polyethylene sht. 1roll = 3mx25m

Spacing of footing bedbars, maximum of .18m

Solid Excavation using handtools/ team

Fine Excavation using handtools/ team

Backfill 1 team:1skill, 2laborer

Water proofing membrane: 1pale = 10sqm to 12sqm.

Fabrication of 10"Ø pipe sch40: 2welder, 2fabricator, 6labor

Fabrication of 1 1/2"Ø pipe sch40: 2welder, 2fabricator, 6labor

Painting: 1painter, 2helper

Form works:1carpenter, 2helper

Rebar works: 1steel bender, 2laborer

Steel fabrication: 1foreman, 1welder, 1fabricator, 2helper (team)


Scaffolding accessories: column, horizontal, xbracing, horizontal, rail, coupler, single clamp, fixed clamp, swivel
clamp, screw jack, planks, ladder, beam clamp

Filing of hollow blocks:3mason, 8laborer

Finishing of wall: 1mason, 2laborer

Installation of 150x150 tiles:1tile sitter, 3laborer

Installation of explosion door:1foreman, 1skilled, 3laborer

Installation of thermocouples: 1skill, 1welder, 2laborer

Application of ceramic fiber module: 1skill, 2welder, 5laboer

Application of fire brick for radiant: (50x70x230 ) 1skill, 2laboerer (6pcs./3minutes)

Filing of 200mm thk chb to wall fence: 1skill, 2 labor

Mortar with masonry cement: .125foreman, 1bricklayer, 2laborer, 1mixer 0.28 cu.m.

Tile setting: 400X400/1Tile settir,2Labor (Premium fix white 400x400 10pcs./20kg

Getting quantity of tiles, area1/area2 x1.14safety factor

Finish kalas 200mm thick chb: 2mason,2labor,1loader

Plastering of wall 3.8mx25m:

Mixing of chb 200mm thick: 1bags of 40kg cement = 10bags of sand

1cement 40kg bags = 85pcs. 100mmthick chb.

Installation of perimeter fence post: 3labor, 1safety, 1foreman, 1permit receiver.

Installation of cyclone & tighting : 3labor, 1safety, 1foreman, 1permit receiver.


Compacting: 60% marl, 40% sand (10% compaction / 2layers compaction of marl)

MORTAR MIXING CLS A; 100PCS CHB 200MM THICK; 18/12BAGS_50KG CMNT; SAND 1CUM;

PLASTERING MIXING CLS A; 20MM THICK ; CEMENT .36 xAREA BAGS; SAND .020 x AREA CUM. (note two sides)

24Mx12Mx5M HEIGHT FABRICATION SHOP / 8WELDER;1FOREMAN; 6 LABORERS; 2CARPENTER

Coal tar Epoxy paint: 72m²=2pale

12mm thick finishing: class A; 1cement & 2 sand

1bags=1cubic foot / .028 cubic meter


HOURS OUTPUT UNIT REMARKS

8 1 cu.m.

SABIC Standard

SABIC Standard

SABIC Standard

SABIC Standard

8 4 cu.m.

8 5 cu.m.

8 8 cu.m.

10 1 joint

10 6 joint

10 100 sqm

10 18 sqm /HR 1.80 14.4

10 60 kg

10 400 kg 762.5 29.326923


10 360 pcs

10 12 sqm

10 6 sqm

30 1 set

10 15 pcs

10 12.6 sqm

10 0.483 cu.m.

5 60 pcs.

10 4.8 cu.m.

9days 200 pcs. jubail camp

1 250 day

4days 95 sqm

8 20 set

8 50 mtr.
EXCLUDING
2.5 mnths ELECTRICAL
5.8653846
ITEM WORK DESCRIPTION HOURS OUTPUT

1 Fabrivcation of 10"Ø pipe sch40: 2welder, 2fabricator, 6labor 10 1

2 Fabrivcation of 1 1/2"Ø pipe sch40: 2welder, 2fabricator, 6labor 10 6

3 Insulation of 2"Ø pipe: 1skill, 3laborer 10 0.3

10

11

12

13

14

15

16

17

18
19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37
38

39
UNIT REMARKS

joint

joint

sqm
ITEM WORK DESCRIPTION HOURS OUTPUT UNIT
1 Installation of outlet and panel box, 1skilled,
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
REMARKS
ITEM WORK DESCRIPTION HOURS OUTPUT

1 Air conditioner: 16sqm. Min - 24msqm max. per 1 AC

10

11

12

13

14

15

16

17

18
19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37
38

39
UNIT REMARKS

SABIC Standard
ITEM WORK DESCRIPTION HOURS OUTPUT UNIT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
REMARKS
ITEM WORK DESCRIPTION HOURS OUTPUT UNIT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
REMARKS
ITEM WORK DESCRIPTION HOURS OUTPUT UNIT
1 ASPHALT CUTTER 19" 1 3.5M
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
REMARKS

You might also like