Professional Documents
Culture Documents
to the Minutes of 102nd EAB held on September 21, 2021 at PEC HQ, Islamabad.
Zone-I (Punjab)
Name of University/Program
S# Decision of 102nd EAB
Profile
1. University College of Agriculture, Multan (Bahauddin Zakariya University,
Multan)
Program B.Sc. Agricultural Based on deficiencies and major weaknesses
Engineering in most of the criteria and partial
Current Status From Intake of implementation of OBE, re-accreditation is
Batch 2004 to granted for one year i.e., Intake Batch 2017
2016 under Level-I, First Schedule of PEC Act.
Visit Type Re-accreditation
Date of Visit July 03-04, 2021 Further, next SAR for Intake Batch 2018 will
only be considered subject to submission of
satisfactory compliance report alongwith
tangible evidences on all deficiencies and
weaknesses mentioned in visit report.
i
Name of University/Program
S# Decision of 102nd EAB
Profile
addressed as a part of its CQI process before
applying for re-accreditation visit under OBA.
ii
Name of University/Program
S# Decision of 102nd EAB
Profile
d) Formal Training on OBE of all faculty.
e) Proper mechanism should be adapted for
Complex Engineering Problems (CEPs),
Open Ended Labs and Problem based
learning for relevant courses.
iii
Name of University/Program
S# Decision of 102nd EAB
Profile
iv
Name of University/Program
S# Decision of 102nd EAB
Profile
The Institution; however, is advised to
address all the deficiencies/ weak areas/
concerns, particularly in Criteria 2, 3, 4,5, 6, 7,
8 & 9. Furthermore, all other observations as
mentioned in the detailed report be addressed
as a part of its CQI process before applying
for re-accreditation visit under OBA.
v
Name of University/Program
S# Decision of 102nd EAB
Profile
vi
Name of University/Program
S# Decision of 102nd EAB
Profile
vii
Name of University/Program
S# Decision of 102nd EAB
Profile
tangible evidences on procurement of
equipment/ workstations to accommodate 3-4
students in all labs within Six (06) months.
viii
Name of University/Program
S# Decision of 102nd EAB
Profile
The Institution; however, is advised to
address the weak areas/ concerns,
particularly in Criteria 1, 2, 3 & 8. Furthermore,
all other observations as mentioned in the
detailed report be addressed as a part of its
CQI process before applying for re-
accreditation visit under OBA.
ix
Name of University/Program
S# Decision of 102nd EAB
Profile
The Institution; however, is advised to
address all the deficiencies/ weak areas/
concerns, particularly in Criteria 1, 2, 3, 4, 5,
6, 7, 8 & 9. Furthermore, all other observations
as mentioned in the detailed report be
addressed as a part of its CQI process before
applying for re-accreditation visit under OBA.
x
Name of University/Program
S# Decision of 102nd EAB
Profile
Current Status From Intake of implementation of OBE, re-accreditation is
Batch 2004 to granted for one year i.e., Intake Batch 2017
2016 under Level-I, First Schedule of PEC Act.
Visit Type Re-accreditation
Date of Visit June 25-26, 2021 The Institution; however, is advised to
address all the deficiencies/ weak areas/
concerns, particularly in Criteria 2, 3, 4, 5, 6,
8 & 9. Furthermore, all other observations as
mentioned in the detailed report be addressed
as a part of its CQI process before applying
for re-accreditation visit under OBA.
xi
S# Name of University/Program Profile Decision of 102nd EAB
as a part of its CQI process before applying for
re-accreditation visit under OBA.
xii
S# Name of University/Program Profile Decision of 102nd EAB
Date of Visit June 24-25, 2021 2016 & 2017 under Level-I, First Schedule of
PEC Act.
xiii
S# Name of University/Program Profile Decision of 102nd EAB
Date of Visit June 24-25, 2021 2016 & 2017 under Level-I, First Schedule of
PEC Act.
xv
S# Name of University/Program Profile Decision of 102nd EAB
g. Program B.E. Chemical Based on the satisfactory level of compliance
Current Status Till Intake of Batch F- against accreditation criteria/ quality standards
2016 and implementation of the Outcome Based
Visit Type Re-accreditation Assessment procedures & CQI, re-
Date of Visit July 05-06, 2021 accreditation is granted for three (03) years
i.e., Intake Batches 2017, 2018 & 2019 under
Level-II, First Schedule of PEC Act.
xvi
S# Name of University/Program Profile Decision of 102nd EAB
Intake Batches 2017 & 2018 under Level-II,
First Schedule of PEC Act.
xvii
S# Name of University/Program Profile Decision of 102nd EAB
i. Appointment of HoD having PEC
registration in relevant discipline and
possessing PhD in Biomedical Engineering
as per the policy in vogue.
ii. Implement FYDP SoPs with the help of
QEC
iii. Ensure FYDP SoPs are implemented on
Intake Batch 2018
iv. Ensure fair assessment and avoid conflict of
interest between supervisor and
examination committee
v. CEPs/CEAs should be inculcated in FYDPs
vi. Standardization and proof reading of Project
Reports for quality assurance
vii. Grading of FYDP in line with International
accepted best practices
xviii
S# Name of University/Program Profile Decision of 102nd EAB
Visit Type Re-accreditation visit, the already granted provisional
Date of Visit June 21-22, 2021 accreditation to intake batch 2016-17 under
Level-II is validated.
xxi
S# Name of University/Program Profile Decision of 102nd EAB
j. Program B.E. Textile Based on verification of satisfactory level of
Current Status From Intake of Batch compliance against accreditation criteria/
1995-96 to 2016-17 quality standards during physical accreditation
Visit Type Re-accreditation visit, the already granted provisional
Date of Visit June 21-22, 2021 accreditation to intake batch 2016-17 under
Level-II is validated.
xxii
S# Name of University/Program Profile Decision of 102nd EAB
accreditation to intake batch 2016-17 under
Level-II is validated.
xxiv
S# Name of University/Program Profile Decision of 102nd EAB
v. Standardization and proof reading of
Project Reports for quality assurance
vi. Grading of FYDP in line with International
accepted best practices
xxv
S# Name of University/Program Profile Decision of 102nd EAB
Visit Type Re-accreditation accreditation to intake batch 2016-17 under
Date of Visit July 01-02, 2021 Level-II is validated.
xxvii
S# Name of University/Program Profile Decision of 102nd EAB
iv. Addressal of all the observations/
weaknesses as mentioned in the
detailed report as a part of CQI process.
xxix
S# Name of University/Program Profile Decision of 102nd EAB
of CQI process before applying for re-
accreditation visit under OBA.
xxx
03. Hamdard Institute of Engineering and Technology, Islamabad Campus (Hamdard
University, Karachi)
xxxi
05. National University of Sciences and Technology, Islamabad - Institute of Civil
Engineering, Islamabad
a. Program BE Civil Based on the satisfactory level of compliance
Current Status against accreditation criteria / quality
Visit Type Re-accreditation standards and implementation of the Outcome
Date of Visit July 1-2, 2021 Based Assessment procedures & CQI, re-
accreditation is granted for four (04) years i.e.,
for intake batches 2017, 2018, 2019 and 2020
under Level-II.
xxxii
Date of Visit July 1-2, 2021 Based Assessment procedures & CQI, re-
accreditation is granted for two (02) years i.e.,
intake batches 2017 and 2018 under Level-II.
xxxiii
The Institution, however, is required to
address all deficiencies, weak areas and
concerns, particularly in Criteria 3 & 8.
Furthermore, all other observations as
mentioned in the detailed report be addressed
as a part of its CQI process before applying for
re-accreditation visit under OBA.
xxxiv
particularly in Criteria-8. Furthermore, all other
observations as mentioned in the detailed
report be addressed as a part of its CQI
process before applying for re-accreditation
visit under OBA.
xxxvi
observations/ deficiency, weaknesses &
concerns, particularly in Criteria 1, 2, 3, 5 & 8
through a confirmatory visit.
xxxvii
CQI process before applying for re-
accreditation visit under OBA.
xxxviii
The Institution, however, is required to
address all deficiencies, weak areas and
concerns, particularly in Criteria 2, 3, 5, 6, 7 &
8. Furthermore, all other observations as
mentioned in the detailed report be addressed
as a part of its CQI process before applying for
re-accreditation visit under OBA.
xxxix
of student intake inline with available PhD
faculty members.
xli
accreditation to intake batch 2016 under
Level-I is validated.
xlii
b. Program B.Sc. Computer Based on the satisfactory implementation of
Software Engineering OBA and reasonable attainment of PLOs at
Current Status student and cohort level, the already granted
Visit Type Re-accreditation provisional accreditation to intake Batch –
Date of Visit July 16-17, 2021 2016 under Level-I is validated and up-graded
to Level-II.
****************
xliii