You are on page 1of 2

GURU GOBIND SINGH REFINERY LIMITED, BATHINDA

165 MW Captive Power Plant


Training Session Evaluation Sheet
Training Code : Training Subject : Date:

Faculty Emp Code :_______ Faculty : Dept.: Total Marks : 10


Participant’s Emp. Marks
Participant : Desg. :
Code :___________
Obtained :____

1. How many zone in GT fire protection system?

a. 4 c. 5
b. 3 d. 1

2. When zone 4 fire alarm acted turbine trip this statement

a. true c. none of these


b. False d. trip after 60 sec

3. In zone 1 Two loops energized

a. Turbine trip and releases CO2 after 60 sec c. Gives indication through Strobe and horn at
local
b. all a,c and d d. Trip the ventilation fans and close ventilation
openings

4. The gas turbine unit has been divided


a. Zone–1, Zone–2, Zone–4 c Zone–I, Zone–II, Zone–III, Zone–IV.
b. Zone–I, Zone–II

5. Zone 1 divided into how many parts?

a. 3 c. 2.
b. 4 d. 1

6. What is full form of FCM ?

a. Intelligent Addressable Control Module c. Intelligent Addressable Relay Module


b. Control Module Barrier d. isolator

7. What is temperature set-point of fire sensor in Turbine compartment?


a. 400 degC c. 600F
b. 320 degC D 330 degC

8. If all isolation valve close and fire alarm acted then CO2 released this statement?
a. true C none of this
b. false

9. What is communication loop voltage of GT fire protection system.?

a 14 VDC c. suction pressure


b. 14 VAC d. Visual inspection

10. If anyone press EPB then?


a. Turbine trip and releases CO2 without any c. Gives indication through Strobe and horn at
delay local

b. all a,c and d d. Trip the ventilation fans and close ventilation

Technical Cell-Steag Page 1 of 2


GURU GOBIND SINGH REFINERY LIMITED, BATHINDA
165 MW Captive Power Plant
Training Session Evaluation Sheet
Training Code : Training Subject : Date:

Faculty Emp Code :_______ Faculty : Dept.: Total Marks : 10


Participant’s Emp. Marks
Participant : Desg. :
Code :___________
Obtained :____

openings

Technical Cell-Steag Page 2 of 2

You might also like