You are on page 1of 1

GMR No GMR 015

BUMI ARMADA BERHAD Vessel Armada Installer


Transportation and Installation Business Unit Date 03.02.2022
Grayfer Material Requisition
Revision AFU

Wet buckle contingency & FCG pigs

R.O.S
Req. Spare Total Estimated Estimated Reason For
Item No Description UoM (Date/Final Remarks
Qty Qty Qty Unit Price Total Cost Request
Destination)

Pig 1 - Bi-directional pig with brush and magnet suitable for pipeline with OD For Flooding, Cleaning 24/5/2022
1 1 0 1 Ea Purchase
406.4mm x 19.1mm wall thickness & Gauging SVAP Warehouse
Pig 2 - Bi-directional pig with brush and gauging plate suitable for pipeline with OD
406.4mm x 19.1mm wall thickness. For Flooding, Cleaning 24/5/2022
2 1 0 1 Ea Purchase
The size of the gauging plate shall be 95% of the nominal internal diameter of the & Gauging SVAP Warehouse
pipeline.
Pig 3 - Bi-directional pig with gauging plate and has space for locating the position
detector (pinger) suitable for pipeline with OD 406.4mm x 19.1mm wall thickness. For Flooding, Cleaning 24/5/2022
3 1 0 1 Ea Purchase
The size of the gauging plate shall be 95% of the nominal internal diameter of the & Gauging SVAP Warehouse
pipeline.
For Flooding, Cleaning 24/5/2022
4 Pinger to be located at Pig 3 1 0 1 Ea Rental / Purchase
& Gauging SVAP Warehouse
For Flooding, Cleaning 24/5/2022
5 Pinger detector 1 0 1 Ea Rental / Purchase
& Gauging SVAP Warehouse
For dewatering during 24/5/2022
6 Foam pig for Filanovsky suitable for OD 406.4mm x 19.1mm wall thickness pipe 1 0 1 Ea Purchase
wet buckle SVAP Warehouse
For dewatering during 24/5/2022
7 Foam pig for Grayfer suitable for OD 406.4mm x 19.1mm wall thickness pipe 1 0 1 Ea Purchase
wet buckle SVAP Warehouse

NOTE:
1. Procurement department to consult with PE Aizzat (+6010 - 400 8659), prior to issuance of PO/SO
2. All items to be supplied with valid certificate and datasheet
3. All material shall be packed properly marked with project name and their description, i.e. V. Grayfer Field Development Project

Requested by: Project Manager Approval By:


Checked By:

Name: Mohd Aizzat Omar Name: Shawn Wong


Name: Md Nazarudin
Designation: Project Engineer Designation: Project Manager
Designation: Construction Manager
Signature: Signature:
Signature :
Date: 03/02/2022 Date: 03/02/2022
Date: 03/02/2022

Page 1 of 1