You are on page 1of 2

Full Name: Joevith M.

Falabi RN, OHN


Training Course:

WORKSHOP – HIRARC
1. Hazard Identification 2. Risk Analysis/Evaluation 3. Risk Control
Work
Possible Existing Risk Proposed Due Date /
No. Activity Hazard Probability Severity Risk
Effect Control (if any) Control Measure Status
Ware House Safety 1. 1. May 1. 1. N/A 1. 1. High 1. 1. High 4. Majo4. 1. Putting of 8/18/2021
Activity Hazard caused 2. 2. N/A 2. 2. High 2. 2. High r warning
1. 1.fluid spill slipped 3. 3. N/A 3. 3. High 3. 3. High dias signages
on the floor accidents abilit5. 2. Proper
2. (trauma, y disposal of sharp
3. 2.Scattered bruises, head with objects or any
broken glass injuries) perm object that may
on the floor 2. anen cause potential
4. 3. 2. May cause t or incidents or
5. 3.Lifting of open wound temp accidents
unsecured injury orar6. 3. Proper
heavy 4. y application or
objects with 5. 3.May cause effec practice of
a machine falling of t correct and safe
heavy object 5. operation of
to other co 3 heavy
worker that . machineries
may cause H
injury i
g
h

You might also like