TASK RISK ASSESSMENT

TRA NUMBER: ( )

JOB DESCRIPTON: HLP #60 CNV work at shutdown

HAZARD
# Job Steps
Hazard Description and effect Population at risk

1- Rotating equipment (Bodily


Injury).
2-lifting and handling
heavy weights (Strains & Injuries).
3- Overlap work at high floor (Risk of
Dismantle all equipments(mechanical falling objects ) The workers who
1 and electrical and the movable pieces 4- Hot work(cutting and are involved at
of conveyer belt). welding)( risk of fire , Fumes this task
emissions ). 5-
Conflict work with other teams
(Injuries , equipment damage).
6-Slip & Trip due to poor
housekeeping.

1-lifting and handling heavy weights


(risk of strains & injuries)
2- overlap work at high floor (Risk of
falling objects )
3-removing belt base structure, that The workers who
Dismantle the conveyer belt steel
2 will left behind it big hole and are involved at
structure.
weakness at main floor structure risk this task
of falling 4- Hot
work(cutting and welding). risk of fire
and fume emissions
5- conflict work with other teams .
1-lifting at blind area (risk of load fall
, damages for equipment) 2-hot
The workers who
work (cut and welding) risk of fire ,
3 Replace and repair CFGs chutes are involved at
fume emissions , electrical shock.
this task
3-manual handling -
risk of strains & injuries.

1-lifting and handling heavy weights


(risk of strains & injuries , load falling)
2- overlap work at high floor (risk of
falling objects )
3-removing belt base structure, that
will left behind it big hole and
Installation of new conveyer belt with weakness at main floor structure risk The workers who
4 all parts of falling 4- Hot are involved at
work(cutting and welding). risk of fire this task
and fume emissions
5- conflict work with other teams .
3-manual handling (risk
of strains & injury).

Supervisor's Signature: Khairy Bedaer Maintenance Director Comme


Superintendent's Signature:
Date: 3/2/2021
Arab Potash Co.

Maintenance Directorate

CONTROLS
Frequency Impact Initial Risk
Frequency Impact VaTotal Ratin List all controlee Required

1- Isolate equipment electrically -


Electrical isolation form (LOTO).
2- use the correct lifting tools with
carefully processing
3-isolate the floor under work by
warning tape and fire blanket.
4-comply to wear the
required PPE,s
Unlikely medium 2 3 6 minor
5- Hot work permit to be implemented
correctly.
6-remove all conveyer belt rubber before
dismantle. 7-close
supervision(TBT)
8-avoid conflict work with other teams by
good plan.
9- Keep good housekeeping.

1- isolate equipment electrically -


Electrical isolation form and be
sure(LOTO).
2- use the correct lifting tools with
carefully processing
3-isolate the floor under work by
warning tape and fire blanket.
4-comply to wear the
required PPE,s 5- hot work
possible medium 3 3 9 High
permit. 6-
rehabitation and resupporting conveyer
belt steel structure before dismantle it.
7-remove all
conveyer belt rubber before dismantle.
8-close
supervesion(TBT). 9-avoid
conflict work with with other teams by
good plan.
• Isolate equipment electrically -
Electrical isolation form and be sure
(LOTO).
• use the correct lifting tools with carefully
processing
• Isolate the floor under work by warning
tape and fire blanket.
• commitment with PPE,s
unlikely medium 2 3 6 minor • hot work permit
• close supervision (TBT)
• Check the grating of BELT #60 floor
before work
• Lifting Permit In case needs of Mobile
Crane

• Isolate equipment electrically -


Electrical isolation form and be sure
(LOTO).
• Use the correct lifting tools with
carefully processing
• Isolate the floor under work by
possible medium 3 3 9 high
warning tape and fire blanket.
• Wear the required PPE,s
• Hot work permit.
• Close supervision(TBT)
• Avoid conflict work with other teams
by good plan.
• Lifting Permit In case needs of Mobile
Crane

enance Director Comments / Approval


Frequency Impact Residual Risk
Frequency Impact VaTotal Ratin

rare minor 1 2 2 low

unlikely minor 2 2 4 low


rare minor 1 2 2 low

unlikely minor 2 2 4 low