Task being assessed Manual handling, height work, lifting rigging, cement mixing, electrical cable laying, excavation etc.
What is the Who might be How might Existing risk Risk Rating Additional Controls New Risk Rating Action / Action /
hazard Harmed? people be control (Residual ) monitored monitored
Harmed? measures by whom? by When?
L C R L C R
1. Workin The workers If the workers 1. Tool Box 4 1. Install 2 1. Site 1. 2 Days
g at who are working are having work Talk 4 16 guardrails 2 4 engineer 2. 2 weeks
height: at height and pressure then about e.g. top-rail, 2. Project 3. 3 days
Workers the workers they may working mid-rail and manager
were working commit at height toe-board to 3. Safety
working at underneath. mistakes and safety is engineer
prevent the
6 meters
accidentally conduct fall of people
height on
they may fall ed. and material.
scaffoldin
g platform from height thus 2. Workers 2. Install safety
without physical injury were net to reduce
guardrails. will be like cuts, given the severity
fracture, head PPEs of the fall.
trauma, death. like 3. Conduct
safety working at
helmet, height safety
shoes, training for
harness the workers
etc. awareness.
2.Electri
cal:
Workers
were
using
damaged
electrical
cable
with
grinding
machine.
Risk assessment form
What is the Who might be How might Existing risk Risk Rating Additional Controls New Risk Action / Action /
hazard Harmed? people be control Rating monitored monitored
Harmed? measures (Residual ) by whom? by When?
L C R L C R
3