Professional Documents
Culture Documents
00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
Date :
Settings
(input for current task)
Materials and standards
Concrete structures : ACI 318-11
Wall analysis
Active earth pressure calculation : Mazindrani (Rankine)
Passive earth pressure calculation : Mazindrani (Rankine)
Earthquake analysis : Mononobe-Okabe
Shape of earth wedge : Consider always vertical
Base key : The base key is considered as inclined footing bottom
Allowable eccentricity : 0.167
Verification methodology : Safety factors (ASD)
Safety factors
Permanent design situation
Safety factor for overturning : SFo = 2.00 [–]
Safety factor for sliding resistance : SFs = 2.00 [–]
Safety factor for bearing capacity : SFb = 1.00 [–]
Material of structure
Unit weight = 23.00 kN/m 3
Analysis of concrete structures carried out according to the standard ACI 318-11.
1
MURO DE CONTENCION H=3.00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
0.25
2.60 17.00:1
3.00 3.00
0.75 1.05
0.40
2.20
Foundation
Type of foundation : input parameters of contact base-soil
Parameters
Angle of friction base-soil = 29.00 °
Cohesion base-soil a = 8.83 kPa
2
MURO DE CONTENCION H=3.00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
Terrain profile
Terrain behind construction has the slope 1: 5.67 (slope angle is 10.00 °).
Water influence
Ground water table is located below the structure.
Resistance on front face of the structure
Resistance on front face of the structure: 1/3 pass., 2/3 at rest
Soil on front face of the structure - SUELO CONTENIDO
Soil thickness in front of structure h = 0.50 m
Terrain in front of structure is flat.
Name : FF resistance Stage - analysis : 1 - 0
3.00 3.00
0.50
2.20
3
MURO DE CONTENCION H=3.00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
47.70
3.00 3.00
39.79
37.44
2.54
+x
2.20
+z
Eccentricity verification
Max. eccentricity of normal force e = 0.029
Maximum allowable eccentricity ealw = 0.167
Eccentricity of the normal force is SATISFACTORY
4
MURO DE CONTENCION H=3.00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
3.00 3.00
2.20
2.20
35.22
50.12
Dimensioning No. 1
Wall stem check - front reinf.
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -1.20 19.51 0.24 1.000
FF resistance -0.10 -0.03 0.00 0.00 1.000
Pressure at rest 34.88 -0.87 0.00 0.40 1.000
Wall stem check - front reinf.
Front reinforcement is not required.
Wall stem check - back reinf.
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -1.20 19.51 0.24 1.000
FF resistance -0.10 -0.03 0.00 0.00 1.000
Pressure at rest 34.88 -0.87 0.00 0.40 1.000
5
MURO DE CONTENCION H=3.00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
Wall jump check
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -0.89 39.79 1.05 1.000
FF resistance -2.54 -0.17 0.00 0.63 1.000
Weight - earth wedge 0.00 -1.75 47.70 1.68 1.000
Active pressure 36.88 -1.06 6.50 2.20 1.000
Wall jump check
Reinforcement and dimensions of the cross-section
5 prof. No. 4, cover 75.0 mm
Inputted reinforcement area = 633.4 mm 2
Required reinforcement area = 133.7 mm 2
Cross-section width = 1.00 m
Cross-section height = 0.40 m
Reinforcement ratio = 0.20 % > 0.04 % = min
Position of neutral axis c = 0.02 m < 0.14 m = cmax
Ultimate shear force Vn = 180.09 kN > 28.79 kN = Vu
Ultimate moment Mn = 73.07 kNm > 11.83 kNm = Mu
Cross-section is SATISFACTORY.
Wall heel check
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -0.20 9.66 1.68 1.000
Weight - earth wedge 0.00 -1.75 47.70 1.68 1.000
Active pressure 36.88 -1.06 6.50 2.20 1.000
Contact stress 0.00 0.00 -40.71 1.66 1.000
Wall heel check
Reinforcement and dimensions of the cross-section
5 prof. No. 4, cover 75.0 mm
Inputted reinforcement area = 633.4 mm 2
Required reinforcement area = 200.4 mm 2
6
MURO DE CONTENCION H=3.00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
Name : Dimensioning Stage - analysis : 1 - 1
47.70
37.44
2.20
+z
40.71
Name : Dimensioning Stage - analysis : 1 - 1
47.70
37.44
2.20
+z
40.71
7
MURO DE CONTENCION H=3.00M
VIA PRINCIPAL N° 04 - LADO IZQUIERDO- PROG. 0+000 - 0+010
47.70
37.44
+x
5 prof. No. 4, cover. 75.0mm
2.20
+z
40.71
Name : Dimensioning Stage - analysis : 1 - 1
47.70
37.44
+x
5 prof. No. 4, cover. 75.0mm
2.20
+z
40.71