2. Build-up rate
These points are variables, based on the previously mentioned design considerations.
Having decided upon a kick off point and buiid-up rate we can find the following
information:
1
Fig 6.1
2
3
4
From Fig 6.2
5
Fig 6.2
6
7
8
Fig 6.3
9
10
6 .2 Planning of horizontal drilling