• Pump Outputs
• Strokes & Time
• Annular Velocity
• Tripping Pipe
Introduction to Well Control
6.5” 6.52
x 3 = .123 bbls/stroke
1029.4
1313
= 17 minutes to circulate surface to bit
80
10117 = 127 minutes to circulate bottoms up
80
Annular Velocity
80 spm
Pump Output bbls/min = Pump Output bbls/stk x Pump Speed stks/min
.117 x 80 = 9.36 bbls/min
Annular Velocity = Pump Output bbls/min
.117 bbls/stk Annular Capacity bbls/ft
9.36 . = 72 ft/min
.1303 bbls ft .1303
.1215 bbls ft
9.36 . = 77 ft/min
.1215
.00764 x 90
PIPE
CAPACITY = .6876 bbls
of metal removed
per 90 ft stand
1 Foot 90’
Stand
Pipe Capacity
= .01776 bbls/ft
Introduction to Well Control
.0254 x 90
PIPE
= 2.286 bbls
CAPACITY
of fluid & metal removed
per 90 ft stand
1 Foot 90’
Stand
5 bbls
10
5 15 START
VOLUME
BBLS
10 x 90 ft stands
pulled = 900 ft of pipe.
Introduction to Well Control
10 x 90 ft stands
pulled = 900 ft of pipe.
Introduction to Well Control
10 x 90 ‘ of pipe is pulled
PRESSURE DROP PULLING PIPE DRY
from the hole with no fill-up.
FORMULA
Pipe Metal Displacement (Mud Wt x .052) x Pipe Metal Displacement x Length of pipe pulled
= .00764 bbls/ft Casing Capacity - Pipe Metal Displacement
= 62 psi
Introduction to Well Control
Casing Capacity
= .0758 bbls/ft
.624 x .0254 x 900
453 ft .0758 - .0254
.01584 x 900
.0504
Mud Weight = 12 ppg
= 12 x .052 x 453
= 282 psi
Introduction to Well Control
Data
NO REDUCTION IN BHP