You are on page 1of 6

PROJECT: Ammonia Plants & Urea Plants of 2200 MTPD & 3850 MTPD

OWNER: Hindustan Urvarak and Rasayan Limited

PMC: Projects & Development India Limited


Hindustan Urvarak And Rasayan Limited
Barauni & Sindri
CONTRACTOR: Consortium of TECHNIP France and TECHNIP India limited, India (Collectively “TECHNIP),
and LARSEN & TOUBRO Hydrocarbon Engineering Limited

QCF
QUALITY CONTROL FORM W 13 PROJ. No.: 077625
REV.
0 SH. 1 OF 1

PIPING PRESSURE TEST REPORT SUBCONTRACTOR: W 13 N° ____

PRESSURE TEST LINES LIST

ATM. HYDRAULIC TEST


LINE / ISO N° SHEET NO REV. AREA P&ID
VISUAL TEST

PNEUMATI TESTR B2002R-LSS-B201297-01 1 TO 2 2 UREA

TEST MEDIUM: B2002R-LSS-B201295-01 1 1 UREA

NORMAL WATER B2002R-LSS-B202181-01 1 TO 2 2 UREA

SPECIAL WATER (Cl __ ppm max) B2002R-LSS-B201298-01 1 0 UREA

OTHER ____________ B2002R-LSS-B202184-01 1 TO 2 X2 UREA

INHIBITOR: YES NO B2001A-LSS-B201298-01 1 0 UREA

FILTRATION: YES NO B2001A-LSS-B201300-01 1 0 UREA

TEST CIRCUIT NO -- B20-LSS-01-U-93 B2001A-LSS-B201299-01 1 0 UREA

SYSTEM N° -- SUP02-LSS-01 B2002R-LSS-B201251-01 1 0 UREA

TEST PRESSURE -- 9.0 Kg-cm² bar B2003R-LSS-B201251-01 1 0 UREA

TEST TEMPERATURE -- AMBIENT °c B2002R-LSS-B201087-01 1 TO 6 2 UREA


1 TO 2
TEST PRESS. START -- 03:00 pm B2002A-LSS-B201037-01 X1 UREA

TEST PRESS. FINISH -- 03:30 pm B2002A-LSS-B201146-01 1 X1 UREA

TEST PRESS. DURATION -- 30 min B2002A-LSS-B201034-01 1 X1 UREA

PRESSURE GAUGE (IDENTIF.) ______ B2002A-LSS-B201036-01 1 X1 UREA

FT-9540/KKS/21 B2002A-LSS-B201119-01 1 X1 UREA

FT-9539/KKS/21 B2002A-LSS-B201042-01 1 TO 2 X1 UREA

………………………………………………. B2002A-LSS-B201044-01 1 TO 3 X1 UREA

VALIDITY -- B2002A-LSS-B201019-01 1 X1 UREA

10.03.2022

TEST AUTHORIZATION YES NO


CONTRACTOR DATE & SIGNATURE
TEST RESULT: ACCEPTED REMARKS: (1) SAME TEST CIRCUIT NUMBER

INSPECTORS SUBCONTRACTOR CONTRACTOR PMC /OWNER IBR AUTHORITY

NAME

SIGNATURE

DATE
PROJECT: Ammonia Plants & Urea Plants of 2200 MTPD & 3850 MTPD

OWNER: Hindustan Urvarak and Rasayan Limited

PMC: Projects & Development India Limited


Hindustan Urvarak And Rasayan Limited
Barauni & Sindri
CONTRACTOR: Consortium of TECHNIP France and TECHNIP India limited, India (Collectively “TECHNIP),
and LARSEN & TOUBRO Hydrocarbon Engineering Limited

QCF
QUALITY CONTROL FORM W 13 PROJ. No.: 077625
REV.
0 SH. 1 OF 1

PIPING PRESSURE TEST REPORT SUBCONTRACTOR: W 13 N° ____

PRESSURE TEST LINES LIST

ATM. HYDRAULIC TEST


LINE / ISO N° SHEET NO REV. AREA P&ID
VISUAL TEST

PNEUMATI TESTR B2002A-LSS-B201035-01 1 X2 UREA

TEST MEDIUM: B2002A-LSS-B201036-02 1 X1 UREA

NORMAL WATER B2002A-LSS-B201037-02 1 X1 UREA

SPECIAL WATER (Cl __ ppm max) B2002A-LSS-B201038-02 1 X1 UREA

OTHER ____________ B2002A-LSS-B201039-02 1 X1 UREA

INHIBITOR: YES NO B2002A-LSS-B201040-02 1 X1 UREA

FILTRATION: YES NO B2002A-LSS-B201041-02 1 X1 UREA

TEST CIRCUIT NO -- B20-LSS-01-U-93 B2002A-LSS-B201042-02 1 X1 UREA

SYSTEM N° -- SUP02-LSS-01 B2002A-LSS-B201044-02 1 X1 UREA

TEST PRESSURE -- 9.0 Kg-cm² bar B2002A-LSS-B201051-02 1 X1 UREA

TEST TEMPERATURE -- AMBIENT °c B2002A-LSS-B201054-02 1 X1 UREA

TEST PRESS. START -- 03:00 pm B2002A-LSS-B201055-02 1 TO 2 X1 UREA

TEST PRESS. FINISH -- 03:30 pm B2001A-LSS-B201139-01 1 X1 UREA

TEST PRESS. DURATION -- 30 min B2001A-LSS-B201076-02 1 X1 UREA

PRESSURE GAUGE (IDENTIF.) ______ B2002A-LSS-B201100-01 1 TO 3 X1 UREA

FT-9540/KKS/21 B2002A-LSS-B201106-02 1 TO 2 X1 UREA

FT-9539/KKS/21 B2002A-LSS-B201117-02 1 X1 UREA

………………………………………………. B2002A-LSS-B201146-02 1 X2 UREA

VALIDITY -- B2002A-LSS-B201151-01 1 0 UREA

10.03.2022

TEST AUTHORIZATION YES NO


CONTRACTOR DATE & SIGNATURE
TEST RESULT: ACCEPTED REMARKS: (1) SAME TEST CIRCUIT NUMBER

INSPECTORS SUBCONTRACTOR CONTRACTOR PMC /OWNER IBR AUTHORITY

NAME

SIGNATURE

DATE
PROJECT: Ammonia Plants & Urea Plants of 2200 MTPD & 3850 MTPD

OWNER: Hindustan Urvarak and Rasayan Limited

PMC: Projects & Development India Limited


Hindustan Urvarak And Rasayan Limited
Barauni & Sindri
CONTRACTOR: Consortium of TECHNIP France and TECHNIP India limited, India (Collectively “TECHNIP),
and LARSEN & TOUBRO Hydrocarbon Engineering Limited

QCF
QUALITY CONTROL FORM W 13 PROJ. No.: 077625
REV.
0 SH. 1 OF 1

PIPING PRESSURE TEST REPORT SUBCONTRACTOR: W 13 N° ____

PRESSURE TEST LINES LIST

ATM. HYDRAULIC TEST


LINE / ISO N° SHEET NO REV. AREA P&ID
VISUAL TEST

PNEUMATI TESTR B2001R-LSS-B201087-01 1 TO 3 X2 UREA

TEST MEDIUM: B2001A-LSS-B202183-01 1 TO 2 0 UREA

NORMAL WATER B2001A-LSS-B202177-01 1 0 UREA

SPECIAL WATER (Cl __ ppm max) B2001R-LSS-B201266-01 1 TO 2 0 UREA

OTHER ____________ B2001A-LSS-B201281-01 1 0 UREA

INHIBITOR: YES NO B2001A-LSS-B201279-01 1 TO 3 X2 UREA

FILTRATION: YES NO B2002R-LSS-B201087-02 1 X2 UREA

TEST CIRCUIT NO -- B20-LSS-01-U-93 B2003R-LSS-B201097-01 1 TO 2 X2 UREA

SYSTEM N° -- SUP02-LSS-01 B2002R-LSS-B200001-01 1 TO 2 0 UREA

TEST PRESSURE -- 9.0 Kg-cm² bar B2001A-LSS-B201134-01 1 X1 UREA

TEST TEMPERATURE -- AMBIENT °c B2001A-LSS-B201137-01 1 TO 2 X1 UREA

TEST PRESS. START -- 03:00 pm B2001A-LSS-B201275-01 1 TO 2 1 UREA

TEST PRESS. FINISH -- 03:30 pm B2001A-LSS-B202186-01 1 0 UREA

TEST PRESS. DURATION -- 30 min B2001A-LSS-B201056-01 1 TO 2 X1 UREA

PRESSURE GAUGE (IDENTIF.) ______ B2001A-LSS-B201048-01 1 TO 3 X3 UREA

FT-9540/KKS/21 B2001A-LSS-B201255-01 1 TO 4 X2 UREA

FT-9539/KKS/21 B2001A-LSS-B201252-01 1 2 UREA

………………………………………………. B2001A-LSS-B202189-01 1 0 UREA

VALIDITY -- B2002A-LSS-B201087-03 1 X3 UREA

10.03.2022

TEST AUTHORIZATION YES NO


CONTRACTOR DATE & SIGNATURE
TEST RESULT: ACCEPTED REMARKS: (1) SAME TEST CIRCUIT NUMBER

INSPECTORS SUBCONTRACTOR CONTRACTOR PMC /OWNER IBR AUTHORITY

NAME

SIGNATURE

DATE
PROJECT: Ammonia Plants & Urea Plants of 2200 MTPD & 3850 MTPD

OWNER: Hindustan Urvarak and Rasayan Limited

PMC: Projects & Development India Limited


Hindustan Urvarak And Rasayan Limited
Barauni & Sindri
CONTRACTOR: Consortium of TECHNIP France and TECHNIP India limited, India (Collectively “TECHNIP),
and LARSEN & TOUBRO Hydrocarbon Engineering Limited

QCF
QUALITY CONTROL FORM W 13 PROJ. No.: 077625
REV.
0 SH. 1 OF 1

PIPING PRESSURE TEST REPORT SUBCONTRACTOR: W 13 N° ____

PRESSURE TEST LINES LIST

ATM. HYDRAULIC TEST


LINE / ISO N° SHEET NO REV. AREA P&ID
VISUAL TEST

PNEUMATI TESTR B2002A-LSS-B201056-02 1 X1 UREA

TEST MEDIUM: B2002A-LSS-B201285-01 1 0 UREA

NORMAL WATER B2002A-LSS-B202002-01 1 TO 07 X3 UREA

SPECIAL WATER (Cl __ ppm max) B2003A-LSS-B200001-01 1 TO 08 2X UREA

OTHER ____________ B2003A-LSS-B202186-01 1 TO 04 X1 UREA

INHIBITOR: YES NO B2003A-LSS-B201302-02 1 0 UREA

FILTRATION: YES NO B2003A-LSS-B201302-01 1 1 UREA

TEST CIRCUIT NO -- B20-LSS-01-U-93 B2003A-LSS-B202188-01 1 0 UREA

SYSTEM N° -- SUP02-LSS-01 B2003A-LSS-B201295-01 1 TO 2 3 UREA

TEST PRESSURE -- 9.0 Kg-cm² bar B2003A-LSS-B201301-01 1 X1 UREA

TEST TEMPERATURE -- AMBIENT °c B2003A-LSS-B200001-02 1 X1 UREA

TEST PRESS. START -- 03:00 pm B2003A-LSS-B200001-03 1 X1 UREA

TEST PRESS. FINISH -- 03:30 pm B2003A-LSS-B202187-01 1 0 UREA

TEST PRESS. DURATION -- 30 min B2002R-LSS-B200003-01 1 0 UREA

PRESSURE GAUGE (IDENTIF.) ______ B2002A-LSS-B201087-01 1 TO 4 02 UREA

FT-9540/KKS/21 B2001A-LSS-B201015-01 1 TO 2 X1 UREA

FT-9539/KKS/21 B2001A-LSS-B201013-01 1 TO 2 X1 UREA

………………………………………………. B2001A-LSS-B201014-01 1 X1 UREA

VALIDITY -- B2001R-LSS-B201273-01 0 0 UREA

10.03.2022

TEST AUTHORIZATION YES NO


CONTRACTOR DATE & SIGNATURE
TEST RESULT: ACCEPTED REMARKS: (1) SAME TEST CIRCUIT NUMBER

INSPECTORS SUBCONTRACTOR CONTRACTOR PMC /OWNER IBR AUTHORITY

NAME

SIGNATURE

DATE
PROJECT: Ammonia Plants & Urea Plants of 2200 MTPD & 3850 MTPD

OWNER: Hindustan Urvarak and Rasayan Limited

PMC: Projects & Development India Limited


Hindustan Urvarak And Rasayan Limited
Barauni & Sindri
CONTRACTOR: Consortium of TECHNIP France and TECHNIP India limited, India (Collectively “TECHNIP),
and LARSEN & TOUBRO Hydrocarbon Engineering Limited

QCF
QUALITY CONTROL FORM W 13 PROJ. No.: 077625
REV.
0 SH. 1 OF 1

PIPING PRESSURE TEST REPORT SUBCONTRACTOR: W 13 N° ____

PRESSURE TEST LINES LIST

ATM. HYDRAULIC TEST


LINE / ISO N° SHEET NO REV. AREA P&ID
VISUAL TEST

PNEUMATI TESTR B2002A-LSS-B201017-02 1 X1 UREA

TEST MEDIUM: B2002A-LSS-B201038-01 1 TO 2 X1 UREA

NORMAL WATER B2002A-LSS-B201039-01 1 TO 06 X1 UREA

SPECIAL WATER (Cl __ ppm max) B2002A-LSS-B201108-01 1 X1 UREA

OTHER ____________ B2002A-LSS-B201040-01 1 X1 UREA

INHIBITOR: YES NO B2002A-LSS-B201041-01 1 TO 3 X2 UREA

FILTRATION: YES NO B2002A-LSS-B201054-01 1 X1 UREA

TEST CIRCUIT NO -- B20-LSS-01-U-93 B2002A-LSS-B201051-01 1 TO 2 X1 UREA

SYSTEM N° -- SUP02-LSS-01 B2002A-LSS-B201055-01 1 TO 2 1 UREA

TEST PRESSURE -- 9.0 Kg-cm² bar B2001A-LSS-B201012-02 1 X1 UREA

TEST TEMPERATURE -- AMBIENT °c B2002A-LSS-B201027-02 1 X1 UREA

TEST PRESS. START -- 03:00 pm B2001A-LSS-B201014-02 1 X1 UREA

TEST PRESS. FINISH -- 03:30 pm B2001A-LSS-B201122-01 1 X2 UREA

TEST PRESS. DURATION -- 30 min B2001A-LSS-B201136-01 1 X1 UREA

PRESSURE GAUGE (IDENTIF.) ______ B2001A-LSS-B201253-01 1 TO 2 0 UREA

FT-9540/KKS/21 B2002A-LSS-B201017-02 1 X2 UREA

FT-9539/KKS/21 B2002A-LSS-B201019-02 1 X1 UREA

………………………………………………. B2002A-LSS-B201031-02 1 X2 UREA

VALIDITY -- B2002A-LSS-B201034-02 1 X1 UREA

10.03.2022

TEST AUTHORIZATION YES NO


CONTRACTOR DATE & SIGNATURE
TEST RESULT: ACCEPTED REMARKS: (1) SAME TEST CIRCUIT NUMBER

INSPECTORS SUBCONTRACTOR CONTRACTOR PMC /OWNER IBR AUTHORITY

NAME

SIGNATURE

DATE
PROJECT: Ammonia Plants & Urea Plants of 2200 MTPD & 3850 MTPD

OWNER: Hindustan Urvarak and Rasayan Limited

PMC: Projects & Development India Limited


Hindustan Urvarak And Rasayan Limited
Barauni & Sindri
CONTRACTOR: Consortium of TECHNIP France and TECHNIP India limited, India (Collectively “TECHNIP),
and LARSEN & TOUBRO Hydrocarbon Engineering Limited

QCF
QUALITY CONTROL FORM W 13 PROJ. No.: 077625
REV.
0 SH. 1 OF 1

PIPING PRESSURE TEST REPORT SUBCONTRACTOR: W 13 N° ____

PRESSURE TEST LINES LIST

ATM. HYDRAULIC TEST


LINE / ISO N° SHEET NO REV. AREA P&ID
VISUAL TEST

PNEUMATI TESTR B2002A-LSS-B201153-01 1 X1 UREA

TEST MEDIUM: B2002A-LSS-B201155-01 1 X1 UREA

NORMAL WATER B2002A-LSS-B202075-01 1 X2 UREA

SPECIAL WATER (Cl __ ppm max) B2002R-LSS-B200003-01 1 0 UREA

OTHER ____________ B2003R-LSS-B201097-02 1 X1 UREA

INHIBITOR: YES NO B2004R-LSS-B200003-01 1 TO 2 0 UREA

FILTRATION: YES NO B2004R-LSS-B200003-02 1 X1 UREA

TEST CIRCUIT NO -- B20-LSS-01-U-93

SYSTEM N° -- SUP02-LSS-01

TEST PRESSURE -- 9.0 Kg-cm² bar

TEST TEMPERATURE -- AMBIENT °c

TEST PRESS. START -- 03:00 pm

TEST PRESS. FINISH -- 03:30 pm

TEST PRESS. DURATION -- 30 min

PRESSURE GAUGE (IDENTIF.) ______

FT-9540/KKS/21

FT-9539/KKS/21

……………………………………………….

VALIDITY --

10.03.2022

TEST AUTHORIZATION YES NO


CONTRACTOR DATE & SIGNATURE
TEST RESULT: ACCEPTED REMARKS: (1) SAME TEST CIRCUIT NUMBER

INSPECTORS SUBCONTRACTOR CONTRACTOR PMC /OWNER IBR AUTHORITY

NAME

SIGNATURE

DATE