Hourly Productions

Clamshell Digging Bedrock


15
14
13
SF per HR

12
11
10
9
8
7
6
5
4
3
2
1
0
0 6 12 18 24 30 36 42 48 54 60 66 72 78 84 90 96 02 08 14 20 26 32 38 44 50 56 62 68 74 80 86 92
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Shift
Kiewit / TreviIcos RIG EFFICIENCIES
Thru 08/31/07
WTC Slurry Walls TO DATE

Digging Rig #1 (Patterson) Digging Rig #2 (Simonson)


Delay (Others) Delay (Others)
Obstructions
6% 5%
Obstructions 9%
12% Plant DT Prod Digging
Plant DT 0% 32%
2%
Rig DT Rig DT
Prod Digging 4%
3%
35%
IDLE Time Chisel Blder IDLE Time
25% 2% 19%
Chisel Bedrock Teeth/Shanks Chisel Blder
6% 0% 0%
Move/Setup
4% Joint Clean Chisel Bedrock
Teeth/Shanks Move/Setup Joint Clean
2% 24%
0% 6% 3%

HydroMill (Bartz) Combined Digging Rigs


Delay (Others) Delay (Others)
Obstructions
Obstructions 7% 4%
11%
3%
Plant DT
Plant DT
0%
4%
Rig DT
Rig DT Prod Digging 3% Prod Digging
16% 39% 38%
IDLE Time
23%

IDLE Time Chisel Rock Teeth/Shanks Chisel Blder


11% 2% 0% 1%
Teeth/Shanks Desand + JC Move/Setup Joint Clean Chisel Bedrock
5% Move Set/Up 5% 13%
7% 1%
7%

File: 593040949.xls
Date: 05/19/2022
Daily Rig Efficiency 08/31/07
Production Per Shift
Dig Rig #1 (Patterson)
SOIL, TILL, & ROCK COMBINED
750

700

650

IDLE Time; 11.00; 92%


600 Prod Digging; 1.00; 8%

550
Area (SF)

500

450

400

350 Hourly Productions


70.0

SF per HR
300
60.0
250 50.0

200 40.0

30.0
150
20.0
100
10.0

50 0.0

Shift
0
Instant Prod No Delay No Owner Delay Overall
145 147 149 151 153 155 157 159 161 163 165 167 169 171 173 175 177 179 181 183 185 187 189
Shifts Budget SF/DAY Actual SF/Day Average SF/Day
Budget

File: 593040949.xls
Date: 05/19/2022
Production Per Shift Daily Rig Efficiency 05/22/07
Dig Rig #2 (Simonson)
SOIL, TILL, & ROCK COMBINED
700

650

600

Joint Clean; 2.00; 21%


550
IDLE Time; 7.50; 79%
Area (SF)

500

450

400

350
Hourly Productions
300
70.0

SF per HR
250 60.0

50.0
200
40.0
150
30.0

100 20.0

10.0
50
0.0
0
Shift
40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 0 4
10 10 Instant Prod No Delay No Owner Delay Overall
Shifts Budget SF/DAY Actual SF/Day Average SF/Day Budget

File: 593040949.xls
Date: 05/19/2022
Production Per Shift Daily Rig Efficiency 08/22/07

Dig Rig (Night Shift) (Joe)


700
SOIL, TILL, & ROCK COMBINED
650

600

550 IDLE Time; 7.50; 100%


Area (SF)

500

450

400

350
Hourly Productions
300

SF per HR
70.0
250 60.0

50.0
200
40.0
150 30.0

100 20.0

10.0
50
0.0

0 Shift
0 2 4 6 810 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Instant Prod No Delay No Owner Delay
Shifts Budget SF/DAY Actual SF/Day Average SF/Day
Overall Budget

File: 593040949.xls
Date: 05/19/2022
Production Per Shift Daily Rig Efficiency 08/29/07

HydroMill (Bartz) Obstructions; 2.25; 16%


220
210
TILL & ROCK COMBINED Move Set/Up; 1.75; 13%

200
190 Teeth/Shanks; 1.00; 7%
Plant DT; 2.50; 18%
180
170
Area (SF)

160
150 IDLE Time; 6.25; 45%

140
130
120
110
Hourly Production
100 20.0

SF per HR
90 18.0
80 16.0
14.0
70 12.0
60 10.0
50 8.0
6.0
40
4.0
30 2.0
20 0.0

10
Shift
0 Instant Prod No Delay No Owner Delay
150 152 154 156 158 160 162 164 166 168 170 172 174 176 178 180 182 184 186 188 190
Overall Budget
Budget SF/DAY Actual SF/Day Average SF/Day Avg Mill #2
Shifts

File: 593040949.xls
Date: 05/19/2022
Production Per Shift Hydromill # 1 Efficiency to Date

HydroMill #1 (Bartz) Desand + JC; 19.00; 3%


Chisel Rock; 38.75; 6%
Move Set/Up; 23.50; 4%
220
210
TILL & ROCK COMBINED Teeth/Shanks; 42.25; 7%

200 Prod Digging; 209.75; 32%


IDLE Time; 38.75; 6%

190
180
170
160
Area (SF)

Rig DT; 153.25; 24%


150
Delay (Others); 47.00; 7%
140
Obstructions; 27.50; 4% Plant DT; 46.75; 7%
130
120
110
100 Hourly Production
20.0
90

SF per HR
18.0
80 16.0
70 14.0
12.0
60
10.0
50 8.0
40 6.0
4.0
30
2.0
20
0.0
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 Instant Prod Shift
No Delay No Owner Delay
Budget SF/DAY Actual SF/Day Average SF/Day
Shifts Overall Budget

File: 593040949.xls
Date: 05/19/2022
Daily Rig Efficiency 08/31/07
Production Per Shift
HydroMill #2 (Bartz) Rig DT; 0.50; 4%
220
210 TILL & ROCK COMBINED
IDLE Time; 3.25; 27%
200
Prod Digging; 5.25; 44%
190
180
170
160
Area (SF)

Teeth/Shanks; 0.50; 4%

150 Move Set/Up; 1.00; 8%


140 Desand + JC; 1.50; 13%

130
120
110
Hourly Production
100 20.0
90 18.0

SF per HR
16.0
80
14.0
70 12.0
60 10.0
50 8.0
6.0
40
4.0
30 2.0
20 0.0
10
Shift
0
Instant Prod No Delay No Owner Delay
150 152 154 156 158 160 162 164 166 168 170 172 174 176 178 180 182 184 186 188 190
Budget SF/DAY Actual SF/Day Average SF/Day Avg Mill #2 Overall Budget

Shifts

File: 593040949.xls
Date: 05/19/2022
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Digging Rig #1
PATTERSON

Overburden Qty Till Qty Rock Qty ACTUAL AVG BUDGET PANEL EFFICIENCY
curr cumm curr cumm curr cumm curr cumm cumm curr cumm Production NON PRODUCTIVE TOTAL Comments
Shift type date sf sf sf sf sf sf sf sf sf/day sf/day sf Prod Digging Chisel Blder Chisel Bedrock Joint Clean Move/Setup Teeth/Shanks IDLE Time Rig DT Plant DT Obstructions Delay (Others) (HOURS)

0 308
1 w 2-Jan-07 552.5 552.5 25.5 25.5 0 0 578 578 578.0 308 308 LE7 7.50 0.75 0.50 0.50 0.75 10.00 Damaged 3rd Wrap Counter
2 w 3-Jan-07 627.5 1180 0 25.5 0 0 627.5 1205.5 602.8 308 616 LE7 5.00 2.00 0.50 1.50 1.00 10.00 Waiting on Access Gate 3 & Unloading Endstops
3 w 4-Jan-07 510.0 1690 4.25 29.8 0 0.0 514.25 1719.8 573.3 308 924 LE3 6.00 1.25 0.50 2.50 10.25 Waiting on Bentonite & Setting Up Lines
4 w 5-Jan-07 229.5 1919.5 0 29.8 0 0.0 229.5 1949.3 487.3 308 1232 LE3 1.50 2.50 1.00 5.25 10.25 LE3 Concrete Pile Obstruction
5 s 6-Jan-07 85.0 2004.5 0 29.8 0 0.0 85 2034.3 406.9 308 1540 LE3 0.00 0.50 1.00 7.00 8.50 LE3 Concrete Pile Obstruction, Fix Closing Line
6 w 8-Jan-07 140.0 2144.5 0 29.8 0 0.0 140 2174.3 362.4 308 1848 LE3 2.75 3.75 0.75 3.25 10.50 LE3 Concrete Pile Obstruction, Chisel Bedrock LE3
7 w 9-Jan-07 0.0 2144.5 0 29.8 0 0.0 0 2174.3 310.6 308 2156 LE7 0.00 10.50 10.50 Assist Mill w/ Obstructions
8 w 10-Jan-07 316.0 2460.5 0 29.8 0 0.0 316 2490.3 311.3 308 2464 LE7/ LE3 4.25 1.75 0.50 0.75 3.00 0.25 2.00 12.50 LE3 Concrete Pile Obst, Waiting for Mill to Clean Panel
9 w 11-Jan-07 42.5 2503 0 29.8 0 0.0 42.5 2532.8 281.4 308 2772 LE7/ LE3 1.75 0.00 7.00 0.25 0.25 2.25 11.50 Replace Bucket, Broken Wires, Chisel Bedrock LE7
10 w 12-Jan-07 0.0 2503 0 29.8 0 0.0 0 2532.8 253.3 308 3080 LE7 0.00 9.50 9.50 Concrete Placement LE7
11 s 13-Jan-07 326.0 2829 0 29.8 0 0.0 326 2858.8 259.9 308 3388 LE3 0.00 3.00 6.00 9.00 LE3 Concrete Pile Obstruction, Boom Indicator
12 w 15-Jan-07 263.5 3092.5 0 29.8 0 0.0 263.5 3122.3 260.2 308 3696 C3 4.50 0.50 0.50 1.25 3.75 10.50 Move to C3, C3 Conc. Obstr, Replace Bucket
13 w 16-Jan-07 493 3585.5 59.5 89.3 0 0.0 552.5 3674.8 282.7 308 4004 C3 8.25 0.50 1.75 10.50 C3 Concr Obstr
14 w 17-Jan-07 484.5 4070 4.25 93.5 0 0.0 488.75 4163.5 297.4 308 4312 C3 8.50 0.50 0.50 1.00 10.50 Waiting on Bentonite
15 w 18-Jan-07 8.5 4078.5 85 178.5 0 0.0 93.5 4257.0 283.8 308 4620 C3 7.25 1.75 0.50 1.00 10.50 Repair Chisel
16 w 19-Jan-07 322.5 4401 15.25 193.8 0 0.0 337.75 4594.8 287.2 308 4928 C3 3.25 6.25 0.50 0.25 0.25 10.50 Chisel thru Boulders C3
17 w 22-Jan-07 0 4401 0 193.8 0 0.0 0 4594.8 270.3 308 5236 LE3 0.00 10.50 10.50 Service, Move from C3, Desanding
18 w 23-Jan-07 0 4401 0 193.8 0 0.0 0 4594.8 255.3 308 5544 LE3 0.00 10.00 10.00 Concrete Placement LE3
19 w 24-Jan-07 0 4401 0 193.8 0 0.0 0 4594.8 241.8 308 5852 C3 0.00 1.50 0.75 7.75 10.00 C3 Obstr, rectify Verticality
20 w 25-Jan-07 570 4971 0 193.8 0 0.0 570 5164.8 258.2 308 6160 C3/ LE1 7.00 2.00 0.50 1.00 10.50 Removed Steel Beam
21 w 26-Jan-07 328 5299 9.5 203.3 0 0.0 337.5 5502.3 262.0 308 6468 LE1 7.00 2.25 0.75 0.50 10.50 Plant froze
22 s 27-Jan-07 148 5447 0 203.3 0 0.0 148 5650.3 256.8 308 6776 C3/ LE1 4.75 1.50 1.50 0.75 8.50 chiseling rock at C3
23 w 29-Jan-07 180 5627 8 211.3 12 12.0 200 5850.3 254.4 308 7084 LE1 3.75 6.00 0.75 10.50 Chiseling Till and Rock at LE-1
24 w 30-Jan-07 0 5627 0 211.3 13.5 25.5 13.5 5863.8 244.3 308 7392 LE1 0.00 6.25 1.50 0.75 8.50 Chiselied Rock at LE1, Worked at West and East Bite
25 w 31-Jan-07 180 5807 0 211.3 21.08 46.6 201.08 6064.8 242.6 308 7700 LE1 2.75 4.50 1.50 0.75 1.00 10.50 Setup on East and Middle Bite LE1, Chiseling Rock, Crane Repair
26 w 1-Feb-07 190 5997 4.5 215.8 10.5 57.1 205 6269.8 241.1 308 8008 LE1/ C10 2.75 1.50 1.00 2.50 2.75 10.50 Setup on Center Bite LE1, Travel to C10, Waiting for Survey at C10
27 w 2-Feb-07 323 6320 19 234.8 0 57.1 342 6611.8 244.9 308 8316 C10 9.25 0.50 0.75 10.50 Digging at Overburden and Till at C10
28 w 5-Feb-07 0 6320 0 234.8 0 57.1 0 6611.8 236.1 308 8624 C3 0.00 10.00 10.00 Concrete Placement C3
29 w 6-Feb-07 163.34 6483.34 28 262.8 0 57.1 191.34 6803.2 234.6 308 8932 CL1 5.50 0.25 3.75 9.50 Unload Endstop trailer and prepare work area
30 w 7-Feb-07 0 6483.34 0 262.8 43.55 100.6 43.55 6846.7 228.2 308 9240 LE5 0.00 3.75 0.50 8.75 13.00 Service, waiting for mill to clean panel, chiseling rock
31 w 8-Feb-07 0 6483.34 0 262.8 36 136.6 36 6882.7 222.0 308 9548 C10 0.00 9.75 0.50 0.25 10.50 Chiseling rock at C10, fixing crane door
32 w 9-Feb-07 279 6762.34 0 262.8 0 136.6 279 7161.7 223.8 308 9856 CL1 4.50 0.25 3.75 8.50 Mass Safety meetg, waiting for truck to move, waiting for bentonite
33 w 12-Feb-07 243 7005.34 13.5 276.3 0 136.6 256.5 7418.2 224.8 308 10164 CL1 4.00 0.75 4.00 1.75 10.50 no bentonite, LE1 for obstn found none, broke valve shaft, holdg cable
34 w 13-Feb-07 34 7039.34 29.25 305.5 0 136.6 63.25 7481.5 220.0 308 10472 CL1/ LE6 2.00 0.50 8.00 10.50 Assist with LE1 cage pick, waiting for bentonite
35 w 14-Feb-07 510 7549.34 25.5 331.0 0 136.6 535.5 8017.0 229.1 308 10780 LE6 6.75 1.75 8.50 Standby due to frozen bentonite line
36 w 15-Feb-07 499.25 8048.59 34 365.0 0 136.6 533.25 8550.2 237.5 308 11088 LE6 6.75 1.75 0.75 2.25 11.50 Repair chisel, rectify G.W,, trying to control loss of bentonite
37 w 16-Feb-07 411 8459.59 77 442.0 0 136.6 488 9038.2 244.3 308 11396 LE6 7.00 2.50 0.50 0.50 10.50 Chiseling rock at endstops in Bites A and B
Picking up Cage C10, Clamming out spoils that were dumped to
38 w 20-Feb-07 0 8459.59 0 442.0 0 136.6 0 9038.2 237.8 308 11704 CL1 0.00 7.00 3.50 10.50 control loss of bentonite on 02/15/07
39 w 21-Feb-07 184.64 8644.23 0 442.0 5.6 142.2 190.24 9228.5 236.6 308 12012 CL1/LG1 3.75 3.75 0.50 0.50 2.00 10.50 Chiseling at CL1, Crane Servicing and pour lean mix in LG1
40 w 22-Feb-07 468 9112.23 36 478.0 0 142.2 504 9732.5 243.3 308 12320 LG1/LE6 3.75 1.00 3.5 2.25 10.50 Obstruction at LG1, Delay due to extra work in LE6 and LG1
41 w 23-Feb-07 0 9112.23 0 478.0 0 142.2 0 9732.5 237.4 308 12628 LG1 0.00 2.50 8.00 10.50 Excavating Lean mix due to pile obstruction, assist cage pick CL1
42 w 26-Feb-07 564 9676.23 27 505.0 0 142.2 591 10323.5 245.8 308 12936 LG1 6.00 1.00 3.50 10.50 Wait for Bentonite, re-excavated flowfill/ lean mix
43 w 27-Feb-07 0 9676.23 0 505.0 0 142.2 0 10323.5 240.1 308 13244 LE6 0.00 8.00 8.00 Extra work re-excavated 495 SF of Lean mix
44 w 28-Feb-07 0 9676.23 0 505.0 22 164.2 22 10345.5 235.1 308 13552 LE6/ LG1 0.00 2.50 0.75 0.25 5.00 8.50 765 SF of Extra work, Chiseling rock at CL1
45 w 1-Mar-07 0 9676.23 0 505.0 0 164.2 0 10345.5 229.9 308 13860 LG1 0.00 10.50 10.50 Assiting with LG1 pour no place for spoil on field
46 w 2-Mar-07 350 10026.23 0 505.0 0 164.2 350 10695.5 232.5 308 14168 LE2 1.00 0.50 7.00 8.50 Working on obstructions 3# pipe piles
47 w 5-Mar-07 294 10320.23 0 505.0 0 164.2 294 10989.5 233.8 308 14476 LE2 0.00 8.50 8.50 chiseling & claming concrete encased pipe piles
48 w 6-Mar-07 251.5 10571.73 0 505.0 0 164.2 251.5 11241.0 234.2 308 14784 LE2 0.00 0.50 8.00 8.50 working on obstructions 3# pipe piles in A/B/C bites simultaneously
49 w 7-Mar-07 252 10823.73 0 505.0 0 164.2 252 11493.0 234.6 308 15092 LE2 0.00 0.50 10.00 10.50 working 3# pipe piles in A/B/C bites simultaneously, CP delay
working 3# pipe piles in A/B/C bites simultaneously,3.5 CP delay,
50 w 8-Mar-07 102 10925.73 108.5 613.5 0 164.2 210.5 11703.5 234.1 308 15400 LE2 0.00 8.50 8.50 operation shutdown (clamming)
51 w 9-Mar-07 0 10925.73 10 623.5 20 184.2 30 11733.5 230.1 308 15708 LE2 0.00 3.00 0.50 5.00 8.50 Chiseling rock, 5 hrs obstn, 1.75 hrs of CP Delay
52 w 12-Mar-07 0 10925.73 0 623.5 0 184.2 0 11733.5 225.6 308 16016 LE2 0.00 2.75 7.00 0.75 10.50 Chiseling rock, assisted in C5 cage pick and pour
53 w 13-Mar-07 378 11303.73 0 623.5 0 184.2 378 12111.5 228.5 308 16324 C7 4.50 4.50 0.50 9.50 Moved rig to C7, dug soil
54 w 14-Mar-07 99 11402.73 76.5 700.0 0 184.2 175.5 12287.0 227.5 308 16632 C7 10.00 0.50 10.50 Digging soil and till
55 w 15-Mar-07 486 11888.73 22.5 722.5 0 184.2 508.5 12795.5 232.6 308 16940 C7 8.25 1.75 0.50 10.50 Digging soil and till
56 w 16-Mar-07 0 11888.73 94.5 817.0 0 184.2 94.5 12890.0 230.2 308 17248 C7 6.50 1.50 0.50 8.50 Mass Safety Mtg, review work plans, lost pin on bridal in bucket
57 s 17-Mar-07 0 11888.73 40.5 857.5 0 184.2 40.5 12930.5 226.9 308 17556 C7 6.00 0.75 0.50 1.75 9.00 Repair pin in clamshell, broke right lay cable & lost chisel in panel
58 w 19-Mar-07 0 11888.73 0 857.5 4.5 188.7 4.5 12935.0 223.0 308 17864 C7 0.00 7.00 0.50 3.00 10.50 Replace right lay cable on rig, Chiseling rock
59 w 20-Mar-07 0 11888.73 0 857.5 22.5 211.2 22.5 12957.5 219.6 308 18172 C7 0.00 10.0 0.50 10.50 Clam and chisel rock
60 w 21-Mar-07 230.7 12119.43 56.1 913.6 24.65 235.9 311.45 13268.9 221.1 308 18480 C7 4.75 4.25 0.50 1.00 10.50 Replece cable on chisel and cut 8' off right lay cable on crane
Repair Chisel, Chisel in C7 & LE6, Joint Clean on endstop LE6,
61 w 22-Mar-07 0 12119.43 0 913.6 8.62 244.5 8.62 13277.5 217.7 308 18788 C7/ LE6 0.00 4.50 1.00 0.75 7.5 0.75 14.50 Standby with mill at LE6 waiting to chisel rock
62 w 23-Mar-07 0 12119.43 0 913.6 3.75 248.3 3.75 13281.3 214.2 308 19096 LE6 0.00 2.50 0.50 7.50 10.50 Unloaded 3 trailers with new hydromill parts, broke chisel
setup for tremie at LE6, prepare area at LE4 to dig, chisel conc
63 w 26-Mar-07 0 12119.43 0 913.6 0 248.3 0 13281.3 210.8 308 19404 LE6 0.00 0.75 0.50 8.5 9.75 overpour at LE6
64 w 27-Mar-07 408 12527.43 0 913.6 0 248.3 408 13689.3 213.9 308 19712 LE4 4.50 0.50 5.50 10.50 Setting up for LE6 pour and cleaning area at LE4
65 w 28-Mar-07 289 12816.43 59.5 973.1 0 248.3 348.5 14037.8 216.0 308 20020 LE4 9.25 0.75 0.50 10.50 at 16' found some old granite foundation blocks, broke 1 tooth
66 w 29-Mar-07 119 12935.43 0 973.1 0 248.3 119 14156.8 214.5 308 20328 LE4 0.00 0.50 10.00 10.50 Working on pile obstns from 18' to 32' (16" dia steel encased piles)
67 w 30-Mar-07 76.5 13011.93 0 973.1 0 248.3 76.5 14233.3 212.4 308 20636 LE4 0.00 0.50 8.00 8.50 Excavating pile obstructions in east bite
68 w 2-Apr-07 110.5 13122.43 0 973.1 0 248.3 110.5 14343.8 210.9 308 20944 LE4 0.00 0.50 10.00 10.50 Chisel/Clam 2 pile obstns, lost verticality, cracked both jaw joints
69 w 3-Apr-07 210 13332.43 8.5 981.6 0 248.3 218.5 14562.3 211.0 308 21252 LE4 1.00 0.75 2.25 6.50 10.50 Working on Obstns, Service to setup Tremie at CL4
70 w 4-Apr-07 0 13332.43 51 1032.6 0 248.3 51 14613.3 208.8 308 21560 LE4 0.00 0.50 2.00 6.00 8.50 Digging 2 pile obstns in east bite, change wire rope on crane
71 w 5-Apr-07 360 13692.43 0 1032.6 0 248.3 360 14973.3 210.9 308 21868 CL2/ LE4 4.00 2.25 2.50 0.50 1.25 10.50 Concrete Obstn at north edge of CL2, Chiseling rock to assist mill
72 w 6-Apr-07 117 13809.43 0 1032.6 0 248.3 117 15090.3 209.6 308 22176 CL2/ LE4 2.00 2.25 0.50 2.75 7.50 Chisel,clean endstop & setup tremie pour LE4, mass safety meetg
73 w 9-Apr-07 355 14164.43 18 1050.6 0 248.3 373 15463.3 211.8 308 22484 CL2 6.00 0.50 3.00 1.00 10.50 Change cable on crane, removed pieces of H-beam, wood & conc.
74 w 10-Apr-07 289 14453.43 51 1101.6 0 248.3 340 15803.3 213.6 308 22792 CL2 7.25 3.25 10.50 service & setup fo LE4 concrete pour
75 w 11-Apr-07 0 14453.43 27 1128.6 0 248.3 27 15830.3 211.1 308 23100 C4/ CL2 1.50 8.00 0.50 0.50 10.50 Assisting hydromill chisel boulders in C4 south bite
76 w 12-Apr-07 0 14453.43 8.5 1137.1 0 248.3 8.5 15838.8 208.4 308 23408 C4/ CL2 3.50 5.00 0.50 1.50 10.50 Assist hydromill chisel rock, waiting for mill to clean out
77 w 13-Apr-07 72 14525.43 0 1137.1 0 248.3 72 15910.8 206.6 308 23716 C1 0.50 1.50 8.50 10.50 Standby and assist hydromill by chiseling rock in C4
78 w 16-Apr-07 161.5 14686.93 0 1137.1 0 248.3 161.5 16072.3 206.1 308 24024 C4/ C1 2.00 7.00 1.50 10.50 Assist hydromill chisel rock, concrete slab obstn
79 w 17-Apr-07 374 15060.93 0 1137.1 0 248.3 374 16446.3 208.2 308 24332 C4/ C1 4.25 2.00 0.75 3.50 10.50 Assist hydromill chisel rock, Clean Endstops
80 w 18-Apr-07 0 15060.93 0 1137.1 0 248.3 0 16446.3 205.6 308 24640 C4 0.00 10.50 10.50 Service C4 Cage pick and concrete pour
81 w 19-Apr-07 83.25 15144.18 38.25 1175.4 38.25 286.5 159.75 16606.0 205.0 308 24948 LE8/ C9 2.50 5.00 4.50 12.00 Moved Setup from LE8 to C9
82 w 20-Apr-07 0 15144.18 0 1175.4 0 286.5 0 16606.0 202.5 308 25256 C9 0.00 10.50 10.50 Move to C9 and Assist with Pour Setup and Service Pour
83 w 23-Apr-07 374 15518.18 0 1175.4 0 286.5 374 16980.0 204.6 308 25564 C6 6.75 0.50 3.25 10.50 Change holding line on crane
84 w 24-Apr-07 394 15912.18 0 1175.4 0 286.5 394 17374.0 206.8 308 25872 C6 6.25 0.25 0.50 3.50 10.50 Chisel steel beam obstn,
85 w 25-Apr-07 182.5 16094.68 102 1277.4 0 286.5 284.5 17658.5 207.7 308 26180 C6 9.00 0.50 1.00 10.50 Using 2-sided chisel to pass thru steel beam obstruction
86 w 26-Apr-07 637.5 16732.18 51 1328.4 0 286.5 688.5 18347.0 213.3 308 26488 LE8 8.00 2.00 1.00 0.50 11.50 Move to LE8, Clean Endstops

File: 593040949.xls Date: 05/19/2022


Page 9 of 35
Tab: Digging Rig #1 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

87 w 27-Apr-07 314.5 17046.68 51 1379.4 0 286.5 365.5 18712.5 215.1 308 26796 LE8 5.75 4.75 10.50 Service setup for C1 concrete pour
88 s 28-Apr-07 0 17046.68 63.75 1443.1 17 303.5 80.75 18793.3 213.6 308 27104 LE8 6.50 1.50 0.50 8.50 Digging Till and Rock
89 w 30-Apr-07 342.2 17388.88 0 1443.1 25.5 329.0 367.7 19161.0 215.3 308 27412 LE8/ CL3 2.50 3.00 1.00 2.00 2.00 10.50 Waiting for Bentonite, removed 2 H beam obstructions
90 w 1-May-07 140.25 17529.13 76.5 1519.6 0 329.0 216.75 19377.7 215.3 308 27720 CL3 8.00 0.50 8.50 Digging Soil and Till
91 w 2-May-07 323 17852.13 42.5 1562.1 0 329.0 365.5 19743.2 217.0 308 28028 CL3 6.25 0.50 3.75 10.50 Change closing line on Clamshell
92 w 3-May-07 221.8 18073.93 12.75 1574.9 0 329.0 234.55 19977.8 217.1 308 28336 CL3/ LE8 3.50 3.00 2.00 8.50 Clean endstops and Service job
93 w 4-May-07 0 18073.93 0 1574.9 0 329.0 0 19977.8 214.8 308 28644 LE8 10.50 10.50 Service and Setup LE8 pour
94 s 5-May-07 333 18406.93 0 1574.9 0 329.0 333 20310.8 216.1 308 28952 CL3/ LG3 4.75 1.25 2.00 0.50 8.50 Chisel at CL3 move setup tp LG3
95 w 7-May-07 197.25 18604.18 0 1574.9 0 329.0 197.25 20508.0 215.9 308 29260 CL3/ LG3 6.50 1.50 0.50 8.50 Clean Endstops at CL3
96 w 8-May-07 0 18604.18 0 1574.9 0 329.0 0 20508.0 213.6 308 29568 CL3 0.00 10.50 10.50 Serving CL3 concrete pour
97 w 9-May-07 0 18604.18 0 1574.9 0 329.0 0 20508.0 211.4 308 29876 0.00 8.50 8.50 Begin disassembling rig for night shift to mobe to north side
98 w 10-May-07 243 18847.18 0 1574.9 0 329.0 243 20751.0 211.7 308 30184 VE3 3.50 1.50 5.50 10.50 Setup counter weights on Rig and Setup to dig at VE3
99 w 11-May-07 306 19153.18 0 1574.9 0 329.0 306 21057.0 212.7 308 30492 VE3 5.00 3.50 8.50 Standby operator shift to Rig @ for guidewall pour
100 w 14-May-07 513 19666.18 18 1592.9 0 329.0 531 21588.0 215.9 308 30800 VE3 8.00 2.00 0.50 10.50 Digging soil and till, Bartz Operator on rig for a day
101 w 15-May-07 474.6 20140.78 36 1628.9 0 329.0 510.6 22098.6 218.8 308 31108 VE3/ VE9 6.25 0.75 2.00 9.00 Preparing area at VE9, fill excavation
102 w 16-May-07 351 20491.78 45 1673.9 0 329.0 396 22494.6 220.5 308 31416 VE9 5.75 1.75 3.00 10.50 Grease rig, wait for bentonite lines, spoil load out, change cable
103 w 17-May-07 567 21058.78 63 1736.9 0 329.0 630 23124.6 224.5 308 31724 VE9 9.00 1.00 0.50 10.50 Digging Soil and Till
104 w 18-May-07 202.67 21261.45 0 1736.9 0 329.0 202.67 23327.3 224.3 308 32032 VE9 1.00 9.50 10.50 Standby Cleaning area at VE13
105 w 21-May-07 468 21729.45 0 1736.9 0 329.0 468 23795.3 226.6 308 32340 VE13 7.00 3.00 0.50 10.50 Setup spoil pit and move Equip
106 w 22-May-07 459 22188.45 36 1772.9 0 329.0 495 24290.3 229.2 308 32648 VE13 7.00 1.00 0.50 8.50 Digging soil and Till
Covering steel manhole w/ steel plate, unloading VE3 endstop trailer,
107 w 23-May-07 99 22287.45 0 1772.9 0 329.0 99 24389.3 227.9 308 32956 VE13 1.50 3.25 3.75 8.50 bentonite leaving thru hole in N.W corner @ 14.5'
108 w 24-May-07 0 22287.45 0 1772.9 0 329.0 0 24389.3 225.8 308 33264 - 0.25 1.25 6.00 4.00 11.50 Bentonite loss, backfill with sand and servive pour at VE3
109 w 25-May-07 0 22287.45 0 1772.9 0 329.0 0 24389.3 223.8 308 33572 VE13 0.00 0.50 5.00 5.50 RE-excavate flowfill filled due to bentonite loss
110 w 29-May-07 535.67 22823.12 13.5 1786.4 0 329.0 549.17 24938.5 226.7 308 33880 VE13/ VE6 5.50 3.00 2.00 10.50 safety mtg, wait for trucks move in/out and trailers
111 w 30-May-07 432 23255.12 0 1786.4 0 329.0 432 25370.5 228.6 308 34188 VE6 5.00 1.75 3.75 10.50 Concrete slab obstruction, assist with VE9 pour setup
112 w 31-May-07 180 23435.12 45 1831.4 0 329.0 225 25595.5 228.5 308 34496 VE6 4.50 0.50 5.50 10.50 Chisel conc/rebar slab obstruction, damage to closing line
113 w 1-Jun-07 629 24064.12 45 1876.4 0 329.0 674 26269.5 232.5 308 34804 VE6 7.50 0.50 1.50 9.50 concrete slab obstruction
114 s 2-Jun-07 430 24494.12 0 1876.4 0 329.0 430 26699.5 234.2 308 35112 VE10 5.50 2.50 0.50 8.50 started digging at VE10
115 w 4-Jun-07 135 24629.12 72 1948.4 0 329.0 207 26906.5 234.0 308 35420 VE10 4.50 6.00 10.50 Service pour VE13
116 w 5-Jun-07 737.33 25366.45 51 1999.4 0 329.0 788.33 27694.8 238.7 308 35728 VE10 9.25 0.25 0.50 10.00 Diging soil + Till
117 w 6-Jun-07 423 25789.45 0 1999.4 0 329.0 423 28117.8 240.3 308 36036 VE14 4.00 1.00 4.50 1.00 10.50 setup for muck pit w/ loader, hook up bentonite lines, lost bent.
118 w 7-Jun-07 605.5 26394.95 36 2035.4 0 329.0 641.5 28759.3 243.7 308 36344 VE14/ VE10 7.00 1.50 0.50 0.50 0.50 1.00 11.00 srvice machine, loss of bentonite, clean endstop
repair right lay wedge socket, standby move rigs around, steel &
119 w 8-Jun-07 556.83 26951.78 21.25 2056.6 0 329.0 578.08 29337.4 246.5 308 36652 VE14/VE4 6.00 3.5 0.75 1.75 12.00 concrete obstns
120 s 9-Jun-07 464 27415.78 27 2083.6 0 329.0 491 29828.4 248.6 308 36960 VE4 6.00 0.50 0.50 1.50 8.50 generator broke down at plant, no bent to fill hole cannot dig
121 w 11-Jun-07 319.17 27734.95 59.5 2143.1 8.5 337.5 387.17 30215.6 249.7 308 37268 VE4 4.75 1.00 1.00 0.50 0.50 1.25 9.00 Clean endstop, wait while setting up small generator at plant
122 w 12-Jun-07 580.5 28315.45 0 2143.1 0 337.5 580.5 30796.1 252.4 308 37576 VE4/ VE11 5.50 1.75 3.00 0.25 10.50 Service machine, standby wait for VE11 area to be cleared
123 w 13-Jun-07 712 29027.45 18 2161.1 0 337.5 730 31526.1 256.3 308 37884 VE11/ VE4 8.25 1.3 0.50 0.50 10.50 clean endstop at VE4
124 w 14-Jun-07 379 29406.45 0 2161.1 0 337.5 379 31905.1 257.3 308 38192 VE7 0.50 5.50 4.50 10.50 Service & Move equip for VE4 pour, extra work re-excavate lean mix
125 w 15-Jun-07 399.5 29805.95 8.5 2169.6 0 337.5 408 32313.1 258.5 308 38500 VE7 4.50 0.50 4.00 9.00 Concrete + Rebar slab Obstns
126 w 18-Jun-07 585 30390.95 0 2169.6 0 337.5 585 32898.1 261.1 308 38808 VE15 7.50 0.50 0.50 0.50 1.50 10.50 clean out west endstop, replace both lines on crane
127 w 19-Jun-07 753.33 31144.28 0 2169.6 0 337.5 753.33 33651.4 265.0 308 39116 VE15/ VE7 5.75 1.8 0.75 1.25 9.50 wait for bentonite, clean west endstop
128 w 20-Jun-07 127.5 31271.78 0 2169.6 0 337.5 127.5 33778.9 263.9 308 39424 VE7/VE5 2.00 3.50 2.00 1.00 8.50 Assisting hydromill chisel VE7 middle bite, conc slab obstn
129 w 21-Jun-07 566.33 31838.11 0 2169.6 0 337.5 566.33 34345.2 266.2 308 39732 VE5 5.00 1.00 0.25 0.75 3.50 10.50 Finish chiseling and cleaning out from slab obstn, wait for bentonite
130 w 22-Jun-07 518.5 32356.61 0 2169.6 0 337.5 518.5 34863.7 268.2 308 40040 VE12 5.00 1.25 4.25 10.50 srvice set equip for VE15 pour, wait service rig setting cage
131 s 23-Jun-07 671.5 33028.11 8.5 2178.1 0 337.5 680 35543.7 271.3 308 40348 VE12/ VE5 6.25 0.25 1.50 0.50 8.50 add barriers and pull spoil back, closing line broke, removed large pieces of
132 w 25-Jun-07 161.5 33189.61 17 2195.1 0 337.5 178.5 35722.2 270.6 308 40656 VE5/ VE16 3.50 0.50 0.50 3.50 0.50 8.50 broke closing line on conc overpour, wait due VE17 GW pour
133 w 26-Jun-07 524 33713.61 0 2195.1 0 337.5 524 36246.2 272.5 308 40964 VE16 5.25 0.75 3.50 9.50 wait for VE16 area to be ready
134 w 27-Jun-07 467.5 34181.11 0 2195.1 0 337.5 467.5 36713.7 274.0 308 41272 VE16/ VE12 6.25 1.50 0.25 1.50 9.50 wait for chisel, chisel conc overpour from VE15, clean VE12 endstop
135 w 28-Jun-07 0 34181.11 0 2195.1 0 337.5 0 36713.7 272.0 308 41580 - 0.00 8.00 8.00 Safety Stay Down by Phoenix
136 w 29-Jun-07 93.5 34274.61 0 2195.1 0 337.5 93.5 36807.2 270.6 308 41888 VE8 0.75 1.00 11.75 13.50 Setup tremie at VE12 and Service pour
137 w 2-Jul-07 884 35158.61 0 2195.1 0 337.5 884 37691.2 275.1 308 42196 VE8/ VE16 7.75 3.00 1.50 1.25 13.50 wait for hydromill to finish west bite
Wait for hydromill to finish cleaning out panel, move off VE16, hit
138 w 3-Jul-07 288 35446.61 0 2195.1 0 337.5 288 37979.2 275.2 308 42504 VE15/C39 3.25 1.00 1.25 3.00 8.50 concrete foundation
139 w 5-Jul-07 612 36058.61 45 2240.1 0 337.5 657 38636.2 278.0 308 42812 C39S/C39N 7.50 1.00 8.50 Wait for chisel, chisel concrete foundation at 12'
140 w 6-Jul-07 514 36572.61 18 2258.1 0 337.5 532 39168.2 279.8 308 43120 C39/VE8 5.00 3.00 1.25 1.75 11.00 Assist with VE16 pour, clean/chisel endstops in VE8, walk to C39
141 w 9-Jul-07 549 37121.61 0 2258.1 0 337.5 549 39717.2 281.7 308 43428 VE2 4.50 1.50 3.50 1.00 10.50 Assist with VE8 pour, concrete/steel pile obstruction
142 w 10-Jul-07 608.42 37730.03 18 2276.1 0 337.5 626.42 40343.6 284.1 308 43736 VE2 6.00 1.50 1.00 8.50 Chisel pilot holes to maintain verticality
143 w 11-Jul-07 0 37730.03 0 2276.1 0 337.5 0 40343.6 282.1 308 44044 - 0.00 3.50 6.00 9.50 Service build tremie pipes for C39 Pour
144 w 12-Jul-07 0 37730.03 0 2276.1 0 337.5 0 40343.6 280.2 308 44352 VE2 0.00 2.75 1.00 7.25 11.00 prepare area VC1, assist hydromill to chisel overpour at endstop
Wait for Testa to chip concrete at east edge of bite, chisel concrete
145 w 13-Jul-07 558 38288.03 0 2276.1 0 337.5 558 40901.6 282.1 308 44660 VC1 5.00 1.00 1.00 3.50 10.50 and stone wall obstruction at 15.5'
146 w 14-Jul-07 360 38648.03 0 2276.1 0 337.5 360 41261.6 282.6 308 44968 VC1 4.25 2.75 0.75 2.25 10.00 Move rig #2 down to plant, clean endstop at VE3
147 w 16-Jul-07 0 38648.03 0 2276.1 0 337.5 0 41261.6 280.7 308 45276 VE2 0.00 6.00 6.00 12.00 Chisel boulders at Joint, wait for Hydromill
148 w 17-Jul-07 756 39404.03 18 2294.1 0 337.5 774 42035.6 284.0 308 45584 C36S 6.75 1.75 0.50 9.00 Removed pieces of pipe pile from 17'-27'
149 w 18-Jul-07 375 39779.03 18 2312.1 0 337.5 393 42428.6 284.8 308 45892 C36S/VC1 4.00 3.50 0.50 0.50 8.50 Chisel Rock level for hydromill
150 w 19-Jul-07 549 40328.03 0 2312.1 0 337.5 549 42977.6 286.5 308 46200 VC1/VE1 5.00 2.50 2.00 1.00 10.50 Move tremie rack for pour, assist hydromill chiseling rock
151 w 20-Jul-07 53 40381.03 36 2348.1 0 337.5 89 43066.6 285.2 308 46508 VE1 3.00 7.50 10.50 Chisel concrete overpour from VE2, assist with VC1 with cage pick
152 s 21-Jul-07 187 40568.03 0 2348.1 0 337.5 187 43253.6 284.6 308 46816 VE1 5.50 0.50 2.50 8.50 Steel pile obstruction 25'-35'
153 w 23-Jul-07 38.5 40606.53 0 2348.1 0 337.5 38.5 43292.1 283.0 308 47124 VE1 0.50 0.50 7.50 8.50 Broke holding line cable on clam, replace cable
154 w 24-Jul-07 153 40759.53 0 2348.1 0 337.5 153 43445.1 282.1 308 47432 C41 2.00 2.50 6.00 10.50 Move equipment for C36S pour, service pour until picker shows
155 w 25-Jul-07 742.5 41502.03 0 2348.1 0 337.5 742.5 44187.6 285.1 308 47740 C41 9.00 0.50 1.00 10.50 No bentonite from plant
156 w 26-Jul-07 136 41638.03 0 2348.1 0 337.5 136 44323.6 284.1 308 48048 VE1/C41 1.50 7.50 0.25 3.25 12.50 chisel boulder at VE1, wait for hydromill
157 w 27-Jul-07 263.5 41901.53 0 2348.1 0 337.5 263.5 44587.1 284.0 308 48356 C41/C36N 4.50 0.50 0.75 2.75 8.50 Move to VE1, build tremie pipes
158 s 28-Jul-07 391 42292.53 0 2348.1 0 337.5 391 44978.1 284.7 308 48664 C36N 7.50 1.00 8.50 Switch clamshells
159 w 30-Jul-07 315 42607.53 18 2366.1 0 337.5 333 45311.1 285.0 308 48972 C36N 3.75 3.75 0.50 0.50 8.50 Chisel boulder at C41
160 w 31-Jul-07 0 42607.53 0 2366.1 0 337.5 0 45311.1 283.2 308 49280 - 0.00 2.50 8.00 10.50 Delay due to lack of available work area (C34-38), assist C41 pour
161 w 1-Aug-07 853.5 43461.03 18 2384.1 0 337.5 871.5 46182.6 286.8 308 49588 VE17 7.50 0.50 1.00 0.50 1.00 10.50 Chisel concrete and brick wall on east edge of bite, cut closing line
162 w 2-Aug-07 442 43903.03 25.5 2409.6 0 337.5 467.5 46650.1 288.0 308 49896 VE17 5.25 1.75 0.50 0.75 2.25 10.50 Chisel rock for hydromill, wait for mill to clean bite
163 w 3-Aug-07 0 43903.03 0 2409.6 0 337.5 0 46650.1 286.2 308 50204 - 0.00 6.00 8.00 14.00 Delay due to lack of available work area (C34-38), assist C36N pour
164 s 4-Aug-07 531 44434.03 13.5 2423.1 0 337.5 544.5 47194.6 287.8 308 50512 C38 5.25 0.75 0.50 2.00 8.50 Stopped by P.A. due to water line break on Vesey Street
165 w 6-Aug-07 331.5 44765.53 0 2423.1 0 337.5 331.5 47526.1 288.0 308 50820 C38/VE17 4.50 1.25 1.50 1.50 2.00 0.75 11.50 Chisel rock for hydromill, wait for mill to clean bite,repair chisel cable
166 w 7-Aug-07 68 44833.53 0 2423.1 0 337.5 68 47594.1 286.7 308 51128 C38 3.50 3.00 5.00 11.50 Delay due to lack of availabe work area (C34-38), assist VE17 pour
167 w 8-Aug-07 204 45037.53 0 2423.1 0 337.5 204 47798.1 286.2 308 51436 C40 3.00 1.00 4.50 8.50 Fill panel with bentonite, operator had to leave
168 w 9-Aug-07 833 45870.53 17 2440.1 0 337.5 850 48648.1 289.6 308 51744 C40 8.00 3.00 0.50 11.50 Chisel endstop overpour and clean beam
169 w 10-Aug-07 110.5 45981.03 0 2440.1 0 337.5 110.5 48758.6 288.5 308 52052 C40 1.00 3.50 7.00 11.50 Delay due to PA borings, service C38 pour
170 s 11-Aug-07 283.5 46264.53 0 2440.1 0 337.5 283.5 49042.1 288.5 308 52360 C35 3.50 1.00 0.50 3.50 8.50 Concrete slab at 29 feet, lost 6700 gallons of bentonite
171 w 13-Aug-07 279 46543.53 0 2440.1 0 337.5 279 49321.1 288.4 308 52668 C35 2.00 4.00 0.50 1.00 4.00 11.50 Chisel concrete obstruction
172 w 14-Aug-07 51 46594.53 0 2440.1 0 337.5 51 49372.1 287.0 308 52976 C35 0.00 1.00 0.50 7.00 8.50 Chisel and clam concrete invert obstruction
173 w 15-Aug-07 0 46594.53 0 2440.1 0 337.5 0 49372.1 285.4 308 53284 C35 0.00 0.50 8.00 8.50 Concrete invert obstruction
174 w 16-Aug-07 0 46594.53 0 2440.1 0 337.5 0 49372.1 283.7 308 53592 C35 0.00 0.50 8.00 8.50 Mechanical problem waiting for cooling fan
175 w 17-Aug-07 0 46594.53 0 2440.1 0 337.5 0 49372.1 282.1 308 53900 - 0.00 0.50 8.00 8.50 Mechanical problem waiting for cooling fan
176 s 18-Aug-07 0 46594.53 0 2440.1 0 337.5 0 49372.1 280.5 308 54208 - 0.00 0.50 8.00 8.50 Mechanical problem waiting for cooling fan
177 w 20-Aug-07 0 46594.53 0 2440.1 0 337.5 0 49372.1 278.9 308 54516 C37 0.00 1.50 1.00 0.50 5.50 8.50 wait and install colling fan, chisel south endstop
178 w 21-Aug-07 0 46594.53 0 2440.1 0 337.5 0 49372.1 277.4 308 54824 C35/ C37 0.00 2.50 0.50 0.50 5.00 8.50 chisel concrete invert obstn, clean endstop
179 w 22-Aug-07 59.5 46654.03 0 2440.1 0 337.5 59.5 49431.6 276.2 308 55132 C35 0.00 0.50 3.00 5.00 8.50 remove h beam, delayed due to out of sequence work
180 w 23-Aug-07 0 46654.03 0 2440.1 0 337.5 0 49431.6 274.6 308 55440 - 0.00 0.50 8.00 8.50 delay unable to start C34 due to out of sequence work
181 w 24-Aug-07 0 46654.03 0 2440.1 0 337.5 0 49431.6 273.1 308 55748 - 0.00 0.50 8.00 8.50 delay unable to start C34 due to out of sequence work
182 s 25-Aug-07 0 46654.03 0 2440.1 0 337.5 0 49431.6 271.6 308 56056 - 0.00 11.00 11.00 place endstop and service pour C35

File: 593040949.xls Date: 05/19/2022


Page 10 of 35
Tab: Digging Rig #1 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

183 w 27-Aug-07 289 46943.03 0 2440.1 0 337.5 289 49720.6 271.7 308 56364 C34 2.75 0.50 2.00 5.25 10.50 wait for area to be cleaned, bentonite loss
184 w 28-Aug-07 90 47033.03 0 2440.1 0 337.5 90 49810.6 270.7 308 56672 C34 0.50 0.75 0.50 4.25 2.50 8.50 dig lean mix, chisel concrete obstruction
185 w 29-Aug-07 405 47438.03 0 2440.1 0 337.5 405 50215.6 271.4 308 56980 C34 1.50 1.25 1.25 4.50 8.50 concrete slab obstruction
186 w 30-Aug-07 0 47438.03 27 2467.1 0 337.5 27 50242.6 270.1 308 57288 C34 1.75 0.50 6.25 8.50 standy to assist mill
187 w 31-Aug-07 0 47438.03 0 2467.1 0 337.5 0 50242.6 268.7 308 57596 C34 1.00 11.00 12.00 support mill and service pour
188 308 57904
189 308 58212
190 308 58520
191 308 58828
192 308 59136
193 308 59444
194 308 59752
195 308 60060
196 308 60368
197 308 60676
insert rows above here to add data
658.25 34.75 119.00 48.75 106.25 2.75 461.50 51.00 37.25 231.50 108.75 1859.75
w =workday 172 35.4% 1.9% 6.4% 2.6% 5.7% 0.1% 24.8% 2.7% 2.0% 12.4% 5.8%
s =saturday/ sunday 15
r =rain outs 0
Total scheduled shifts 187

File: 593040949.xls Date: 05/19/2022


Page 11 of 35
Tab: Digging Rig #1 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Digging Rig #1
PATTERSON
MANHOUR FACTORS
Production w/ no DT Production w/ KT DT Production overall BUDGET Chiseling Bedrock OVERBURDEN TILL COMBINED
Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive Productive cumm Prod Prod Ave Prod mh/sf mh/sf mh/sf
Shift type date rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours rig hours sf/hr sf/hr budget curr to date budget curr to date budget curr to date

0
1 w 2-Jan-07 7.50 7.50 77.1 77.1 10.00 10.00 57.8 57.8 10.00 10.00 57.8 57.8 30.80 0.00 0.00 0.082 0.05 0.05 0.126 0.16 0.16 0.087 0.06 0.06
2 w 3-Jan-07 5.00 12.50 125.5 96.4 9.00 19.00 69.7 63.4 10.00 20.00 62.8 60.3 30.80 0.00 0.00 0.082 0.06 0.06 0.126 0.00 0.16 0.082 0.06 0.06
3 w 4-Jan-07 6.00 18.50 85.7 93.0 10.25 29.25 50.2 58.8 10.25 30.25 50.2 56.9 30.80 0.00 0.00 0.082 0.04 0.05 0.126 0.47 0.20 0.087 0.04 0.05
4 w 5-Jan-07 1.50 20.00 153.0 97.5 5.00 34.25 45.9 56.9 10.25 40.50 22.4 48.1 30.80 0.00 0.00 0.082 0.07 0.05 0.126 0.00 0.20 0.082 0.07 0.06
5 s 6-Jan-07 0.00 20.00 #DIV/0! 101.7 1.50 35.75 56.7 56.9 8.50 49.00 10.0 41.5 30.80 0.00 0.00 0.082 0.05 0.05 0.126 0.00 0.20 0.082 0.05 0.06
6 w 8-Jan-07 6.50 26.50 21.5 82.0 7.25 43.00 19.3 50.6 10.50 59.50 13.3 36.5 30.80 3.75 3.75 0.0 0.00 0.082 0.05 0.05 0.126 0.00 0.20 0.082 0.05 0.06
7 w 9-Jan-07 0.00 26.50 0.0 82.0 0.00 43.00 0.0 50.6 10.50 70.00 0.0 31.1 30.80 0.00 3.75 0.082 0.00 0.05 0.126 0.00 0.20 0.082 0.00 0.06
8 w 10-Jan-07 6.00 32.50 52.7 76.6 10.50 53.50 30.1 46.5 12.50 82.50 25.3 30.2 30.80 0.00 3.75 0.082 0.05 0.05 0.126 0.00 0.20 0.082 0.05 0.05
9 w 11-Jan-07 8.75 41.25 4.9 61.4 11.50 65.00 3.7 39.0 11.50 94.00 3.7 26.9 30.80 7.00 10.75 0.0 0.00 0.082 0.07 0.05 0.126 0.00 0.20 0.082 0.07 0.05
10 w 12-Jan-07 0.00 41.25 0.0 61.4 9.50 74.50 0.0 34.0 9.50 103.50 0.0 24.5 30.80 0.00 10.75 0.082 0.00 0.05 0.126 0.00 0.20 0.082 0.00 0.05
11 s 13-Jan-07 0.00 41.25 #DIV/0! 69.3 3.00 77.50 108.7 36.9 9.00 112.50 36.2 25.4 30.80 0.00 10.75 0.082 0.02 0.05 0.126 0.00 0.20 0.082 0.02 0.05
12 w 15-Jan-07 4.50 45.75 58.6 68.2 6.75 84.25 39.0 37.1 10.50 123.00 25.1 25.4 30.80 0.00 10.75 0.082 0.07 0.05 0.126 0.00 0.20 0.082 0.07 0.05
13 w 16-Jan-07 8.25 54.00 67.0 68.1 8.75 93.00 63.1 39.5 10.50 133.50 52.6 27.5 30.80 0.00 10.75 0.082 0.02 0.05 0.126 0.33 0.29 0.087 0.06 0.05
14 w 17-Jan-07 8.50 62.50 57.5 66.6 10.50 103.50 46.5 40.2 10.50 144.00 46.5 28.9 30.80 0.00 10.75 0.082 0.05 0.05 0.126 0.94 0.32 0.087 0.06 0.05
15 w 18-Jan-07 7.25 69.75 12.9 61.0 10.50 114.00 8.9 37.3 10.50 154.50 8.9 27.6 30.80 0.00 10.75 0.082 0.24 0.05 0.126 0.33 0.32 0.087 0.32 0.06
16 w 19-Jan-07 9.50 79.25 35.6 58.0 10.25 124.25 33.0 37.0 10.50 165.00 32.2 27.8 30.80 0.00 10.75 0.082 0.00 0.04 0.126 0.00 0.30 0.087 0.00 0.06
17 w 22-Jan-07 0.00 79.25 0.0 58.0 10.50 134.75 0.0 34.1 10.50 175.50 0.0 26.2 30.80 0.00 10.75 0.082 0.00 0.04 0.126 0.00 0.30 0.087 0.00 0.06
18 w 23-Jan-07 0.00 79.25 0.0 58.0 10.00 144.75 0.0 31.7 10.00 185.50 0.0 24.8 30.80 0.00 10.75 0.082 0.00 0.04 0.126 0.00 0.30 0.087 0.00 0.06
19 w 24-Jan-07 0.00 79.25 0.0 58.0 2.25 147.00 0.0 31.3 10.00 195.50 0.0 23.5 30.80 0.00 10.75 0.082 0.00 0.04 0.126 0.00 0.30 0.087 0.00 0.06
20 w 25-Jan-07 7.00 86.25 81.4 59.9 9.50 156.50 60.0 33.0 10.50 206.00 54.3 25.1 30.80 0.00 10.75 0.082 0.00 0.04 0.126 0.00 0.30 0.087 0.00 0.05
21 w 26-Jan-07 7.00 93.25 48.2 59.0 10.50 167.00 32.1 32.9 10.50 216.50 32.1 25.4 30.80 0.00 10.75 0.082 0.00 0.04 0.126 0.00 0.28 0.087 0.00 0.05
22 s 27-Jan-07 6.25 99.50 23.7 56.8 8.50 175.50 17.4 32.2 8.50 225.00 17.4 25.1 30.80 1.50 12.25 0.0 0.00 0.082 0.00 0.04 0.126 0.00 0.28 0.087 0.00 0.04
23 w 29-Jan-07 9.75 109.25 20.5 53.5 10.50 186.00 19.0 31.5 10.50 235.50 19.0 24.8 30.80 6.00 18.25 2.0 0.66 0.082 0.00 0.03 0.126 0.00 0.27 0.087 0.00 0.04
24 w 30-Jan-07 6.25 115.50 2.2 50.8 8.50 194.50 1.6 30.1 8.50 244.00 1.6 24.0 30.80 6.25 24.50 2.2 1.04 0.082 0.00 0.03 0.126 0.00 0.27 0.087 0.00 0.04
25 w 31-Jan-07 7.25 122.75 27.7 49.4 10.50 205.00 19.2 29.6 10.50 254.50 19.2 23.8 30.80 4.50 29.00 4.7 1.61 0.082 0.00 0.03 0.126 0.00 0.27 0.087 0.00 0.04
26 w 1-Feb-07 4.25 127.00 48.2 49.4 7.75 212.75 26.5 29.5 10.50 265.00 19.5 23.7 30.80 1.50 30.50 7.0 1.87 0.082 0.00 0.00 0.126 0.00 0.00 0.087 0.00 0.00
27 w 2-Feb-07 9.25 136.25 37.0 48.5 10.50 223.25 32.6 29.6 10.50 275.50 32.6 24.0 30.80 0.00 30.50 0.082 0.00 0.00 0.126 0.00 0.00 0.087 0.00 0.00
28 w 5-Feb-07 0.00 136.25 0.0 48.5 10.00 233.25 0.0 28.3 10.00 285.50 0.0 23.2 30.80 0.00 30.50 0.082 0.00 0.00 0.126 0.00 0.00 0.087 0.00 0.00
29 w 6-Feb-07 5.50 141.75 34.8 48.0 9.50 242.75 20.1 28.0 9.50 295.00 20.1 23.1 30.80 0.00 30.50 0.082 0.00 0.00 0.126 0.00 0.00 0.087 0.00 0.00
30 w 7-Feb-07 3.75 145.50 11.6 47.1 13.00 255.75 3.4 26.8 13.00 308.00 3.4 22.2 30.80 3.75 34.25 11.6 2.94 0.082 0.00 0.00 0.126 0.00 0.00 0.087 0.00 0.00
31 w 8-Feb-07 9.75 155.25 3.7 44.3 10.50 266.25 3.4 25.9 10.50 318.50 3.4 21.6 30.80 9.75 44.00 3.7 3.11 0.082 0.00 0.00 0.126 0.00 0.00 0.087 0.00 0.00
32 w 9-Feb-07 4.50 159.75 62.0 44.8 8.50 274.75 32.8 26.1 8.50 327.00 32.8 21.9 30.80 0.00 44.00 0.082 0.00 0.126
33 w 12-Feb-07 4.00 163.75 64.1 45.3 10.50 285.25 24.4 26.0 10.50 337.50 24.4 22.0 30.80 0.00 44.00 0.082 0.00 0.126
34 w 13-Feb-07 2.00 165.75 31.6 45.1 10.50 295.75 6.0 25.3 10.50 348.00 6.0 21.5 30.80 0.00 44.00 0.00
35 w 14-Feb-07 6.75 172.50 79.3 46.5 8.50 304.25 63.0 26.3 8.50 356.50 63.0 22.5 30.80 0.00 44.00 0.00
36 w 15-Feb-07 6.75 179.25 79.0 47.7 9.25 313.50 57.6 27.3 11.50 368.00 46.4 23.2 30.80 0.00 44.00 0.00
37 w 16-Feb-07 9.50 188.75 51.4 47.9 10.50 324.00 46.5 27.9 10.50 378.50 46.5 23.9 30.80 2.50 46.50 0.0 2.94 0.00

38 w 20-Feb-07 0.00 188.75 0.0 47.9 7.00 331.00 0.0 27.3 10.50 389.00 0.0 23.2 30.80 0.00 46.50 0.00
39 w 21-Feb-07 7.50 196.25 25.4 47.0 8.50 339.50 22.4 27.2 10.50 399.50 18.1 23.1 30.80 3.75 50.25 1.5 2.83 0.00
40 w 22-Feb-07 3.75 200.00 134.4 48.7 4.75 344.25 106.1 28.3 10.50 410.00 48.0 23.7 30.80 0.00 50.25 0.00
41 w 23-Feb-07 0.00 200.00 0.0 48.7 2.50 346.75 0.0 28.1 10.50 420.50 0.0 23.1 30.80 0.00 50.25 0.00
42 w 26-Feb-07 6.00 206.00 98.5 50.1 7.00 353.75 84.4 29.2 10.50 431.00 56.3 24.0 30.80 0.00 50.25 0.00
43 w 27-Feb-07 0.00 206.00 0.0 50.1 0.00 353.75 0.0 29.2 8.00 439.00 0.0 23.5 30.80 0.00 50.25
44 w 28-Feb-07 2.50 208.50 8.8 49.6 3.50 357.25 6.3 29.0 8.50 447.50 2.6 23.1 30.80 2.50 52.75 8.8 3.11
45 w 1-Mar-07 0.00 208.50 0.0 49.6 10.50 367.75 0.0 28.1 10.50 458.00 0.0 22.6 30.80 0.00 52.75
46 w 2-Mar-07 1.00 209.50 350.0 51.1 1.50 369.25 233.3 29.0 8.50 466.50 41.2 22.9 30.80 0.00 52.75
47 w 5-Mar-07 0.00 209.50 #DIV/0! 52.5 0.00 369.25 #DIV/0! 29.8 8.50 475.00 34.6 23.1 30.80 0.00 52.75
48 w 6-Mar-07 0.00 209.50 #DIV/0! 53.7 0.50 369.75 503.0 30.4 8.50 483.50 29.6 23.2 30.80 0.00 52.75
49 w 7-Mar-07 0.00 209.50 #DIV/0! 54.9 0.50 370.25 504.0 31.0 10.50 494.00 24.0 23.3 30.80 0.00 52.75

50 w 8-Mar-07 0.00 209.50 #DIV/0! 55.9 0.00 370.25 #DIV/0! 31.6 8.50 502.50 24.8 23.3 30.80 0.00 52.75
51 w 9-Mar-07 3.00 212.50 10.0 55.2 3.50 373.75 8.6 31.4 8.50 511.00 3.5 23.0 30.80 3.00 55.75 6.7 3.30
52 w 12-Mar-07 2.75 215.25 0.0 54.5 10.50 384.25 0.0 30.5 10.50 521.50 0.0 22.5 30.80 2.75 58.50 0.0 3.15
53 w 13-Mar-07 4.50 219.75 84.0 55.1 9.50 393.75 39.8 30.8 9.50 531.00 39.8 22.8 30.80 0.00 58.50
54 w 14-Mar-07 10.00 229.75 17.6 53.5 10.50 404.25 16.7 30.4 10.50 541.50 16.7 22.7 30.80 0.00 58.50
55 w 15-Mar-07 8.25 238.00 61.6 53.8 10.50 414.75 48.4 30.9 10.50 552.00 48.4 23.2 30.80 0.00 58.50
56 w 16-Mar-07 6.50 244.50 14.5 52.7 8.50 423.25 11.1 30.5 8.50 560.50 11.1 23.0 30.80 0.00 58.50
57 s 17-Mar-07 6.75 251.25 6.0 51.5 9.00 432.25 4.5 29.9 9.00 569.50 4.5 22.7 30.80 0.75 59.25 0.0 3.11
58 w 19-Mar-07 7.00 258.25 0.6 50.1 10.50 442.75 0.4 29.2 10.50 580.00 0.4 22.3 30.80 7.00 66.25 0.6 2.85
59 w 20-Mar-07 10.00 268.25 2.3 48.3 10.50 453.25 2.1 28.6 10.50 590.50 2.1 21.9 30.80 10.00 76.25 2.3 2.77
60 w 21-Mar-07 9.00 277.25 34.6 47.9 10.50 463.75 29.7 28.6 10.50 601.00 29.7 22.1 30.80 4.25 80.50 5.8 2.93

61 w 22-Mar-07 4.50 281.75 1.9 47.1 14.50 478.25 0.6 27.8 14.50 615.50 0.6 21.6 30.80 4.50 85.00 1.9 2.88
62 w 23-Mar-07 2.50 284.25 1.5 46.7 10.50 488.75 0.4 27.2 10.50 626.00 0.4 21.2 30.80 2.50 87.50 1.5 2.84

63 w 26-Mar-07 0.00 284.25 0.0 46.7 9.75 498.50 0.0 26.6 9.75 635.75 0.0 20.9 30.80 0.00 87.50
64 w 27-Mar-07 4.50 288.75 90.7 47.4 10.50 509.00 38.9 26.9 10.50 646.25 38.9 21.2 30.80 0.00 87.50
65 w 28-Mar-07 9.25 298.00 37.7 47.1 10.50 519.50 33.2 27.0 10.50 656.75 33.2 21.4 30.80 0.00 87.50
66 w 29-Mar-07 0.00 298.00 #DIV/0! 47.5 0.50 520.00 238.0 27.2 10.50 667.25 11.3 21.2 30.80 0.00 87.50
67 w 30-Mar-07 0.00 298.00 #DIV/0! 47.8 0.50 520.50 153.0 27.3 8.50 675.75 9.0 21.1 30.80 0.00 87.50
68 w 2-Apr-07 0.00 298.00 #DIV/0! 48.1 0.50 521.00 221.0 27.5 10.50 686.25 10.5 20.9 30.80 0.00 87.50
69 w 3-Apr-07 1.00 299.00 218.5 48.7 4.00 525.00 54.6 27.7 10.50 696.75 20.8 20.9 30.80 0.00 87.50
70 w 4-Apr-07 0.00 299.00 #DIV/0! 48.9 2.50 527.50 20.4 27.7 8.50 705.25 6.0 20.7 30.80 0.00 87.50
71 w 5-Apr-07 6.25 305.25 57.6 49.1 9.25 536.75 38.9 27.9 10.50 715.75 34.3 20.9 31.80 2.25 89.75 0.0 2.77
72 w 6-Apr-07 2.00 307.25 58.5 49.1 7.50 544.25 15.6 27.7 7.50 723.25 15.6 20.9 30.80 0.00 89.75
73 w 9-Apr-07 6.00 313.25 62.2 49.4 9.50 553.75 39.3 27.9 10.50 733.75 35.5 21.1 30.80 0.00 89.75
74 w 10-Apr-07 7.25 320.50 46.9 49.3 10.50 564.25 32.4 28.0 10.50 744.25 32.4 21.2 30.80 0.00 89.75
75 w 11-Apr-07 9.50 330.00 2.8 48.0 10.50 574.75 2.6 27.5 10.50 754.75 2.6 21.0 30.80 0.00 89.75
76 w 12-Apr-07 8.50 338.50 1.0 46.8 10.50 585.25 0.8 27.1 10.50 765.25 0.8 20.7 30.80 5.00 94.75 0.0 2.62
77 w 13-Apr-07 0.50 339.00 144.0 46.9 10.50 595.75 6.9 26.7 10.50 775.75 6.9 20.5 30.80 0.00 94.75
78 w 16-Apr-07 2.00 341.00 80.8 47.1 9.00 604.75 17.9 26.6 10.50 786.25 15.4 20.4 30.80 0.00 94.75
79 w 17-Apr-07 4.25 345.25 88.0 47.6 10.50 615.25 35.6 26.7 10.50 796.75 35.6 20.6 30.80 0.00 94.75
80 w 18-Apr-07 0.00 345.25 0.0 47.6 10.50 625.75 0.0 26.3 10.50 807.25 0.0 20.4 30.80 0.00 94.75
81 w 19-Apr-07 7.50 352.75 21.3 47.1 12.00 637.75 13.3 26.0 12.00 819.25 13.3 20.3 30.80 5.00 99.75 7.7 2.87
82 w 20-Apr-07 0.00 352.75 0.0 47.1 10.50 648.25 0.0 25.6 10.50 829.75 0.0 20.0 30.80 0.00 99.75
83 w 23-Apr-07 6.75 359.50 55.4 47.2 10.50 658.75 35.6 25.8 10.50 840.25 35.6 20.2 30.80 0.00 99.75
84 w 24-Apr-07 6.25 365.75 63.0 47.5 7.00 665.75 56.3 26.1 10.50 850.75 37.5 20.4 30.80 0.00 99.75
85 w 25-Apr-07 9.00 374.75 31.6 47.1 9.50 675.25 29.9 26.2 10.50 861.25 27.1 20.5 30.80 0.00 99.75
86 w 26-Apr-07 8.00 382.75 86.1 47.9 11.50 686.75 59.9 26.7 11.50 872.75 59.9 21.0 30.80 0.00 99.75

File: 593040949.xls Date: 05/19/2022


Page 12 of 35
Tab: Digging Rig #1 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

87 w 27-Apr-07 5.75 388.50 63.6 48.2 10.50 697.25 34.8 26.8 10.50 883.25 34.8 21.2 30.80 0.00 99.75
88 s 28-Apr-07 8.00 396.50 10.1 47.4 8.50 705.75 9.5 26.6 8.50 891.75 9.5 21.1 30.80 1.50 101.25 11.3 3.00
89 w 30-Apr-07 5.50 402.00 66.9 47.7 8.50 714.25 43.3 26.8 10.50 902.25 35.0 21.2 30.80 3.00 104.25 8.5 3.16
90 w 1-May-07 8.00 410.00 27.1 47.3 8.50 722.75 25.5 26.8 8.50 910.75 25.5 21.3 30.80 0.00 104.25
91 w 2-May-07 6.25 416.25 58.5 47.4 10.50 733.25 34.8 26.9 10.50 921.25 34.8 21.4 30.80 0.00 104.25
92 w 3-May-07 3.50 419.75 67.0 47.6 8.50 741.75 27.6 26.9 8.50 929.75 27.6 21.5 30.80 0.00 104.25
93 w 4-May-07 10.50 430.25 0.0 46.4 10.50 752.25 0.0 26.6 10.50 940.25 0.0 21.2 30.80 0.00 104.25
94 s 5-May-07 6.00 436.25 55.5 46.6 8.50 760.75 39.2 26.7 8.50 948.75 39.2 21.4 30.80 1.25 105.50 0.0 3.12
95 w 7-May-07 6.50 442.75 30.3 46.3 8.50 769.25 23.2 26.7 8.50 957.25 23.2 21.4 30.80 0.00 105.50
96 w 8-May-07 0.00 442.75 0.0 46.3 10.50 779.75 0.0 26.3 10.50 967.75 0.0 21.2 30.80 0.00 105.50
97 w 9-May-07 0.00 442.75 0.0 46.3 8.50 788.25 0.0 26.0 8.50 976.25 0.0 21.0 30.80 0.00 105.50
98 w 10-May-07 3.50 446.25 69.4 46.5 10.50 798.75 23.1 26.0 10.50 986.75 23.1 21.0 30.80 0.00 105.50
99 w 11-May-07 5.00 451.25 61.2 46.7 8.50 807.25 36.0 26.1 8.50 995.25 36.0 21.2 30.80 0.00 105.50
100 w 14-May-07 8.00 459.25 66.4 47.0 10.50 817.75 50.6 26.4 10.50 1005.75 50.6 21.5 30.80 0.00 105.50
101 w 15-May-07 6.25 465.50 81.7 47.5 9.00 826.75 56.7 26.7 9.00 1014.75 56.7 21.8 30.80 0.00 105.50
102 w 16-May-07 5.75 471.25 68.9 47.7 10.50 837.25 37.7 26.9 10.50 1025.25 37.7 21.9 30.80 0.00 105.50
103 w 17-May-07 9.00 480.25 70.0 48.2 10.50 847.75 60.0 27.3 10.50 1035.75 60.0 22.3 30.80 0.00 105.50
104 w 18-May-07 1.00 481.25 202.7 48.5 10.50 858.25 19.3 27.2 10.50 1046.25 19.3 22.3 30.80 0.00 105.50
105 w 21-May-07 7.00 488.25 66.9 48.7 10.50 868.75 44.6 27.4 10.50 1056.75 44.6 22.5 30.80 0.00 105.50
106 w 22-May-07 7.00 495.25 70.7 49.0 8.50 877.25 58.2 27.7 8.50 1065.25 58.2 22.8 30.80 0.00 105.50

107 w 23-May-07 1.50 496.75 66.0 49.1 4.75 882.00 20.8 27.7 8.50 1073.75 11.6 22.7 30.80 0.00 105.50
108 w 24-May-07 0.25 497.00 0.0 49.1 7.50 889.50 0.0 27.4 11.50 1085.25 0.0 22.5 30.80 0.00 105.50
109 w 25-May-07 0.00 497.00 0.0 49.1 0.50 890.00 0.0 27.4 5.50 1090.75 0.0 22.4 30.80 0.00 105.50
110 w 29-May-07 5.50 502.50 99.8 49.6 10.50 900.50 52.3 27.7 10.50 1101.25 52.3 22.6 30.80 0.00 105.50
111 w 30-May-07 5.00 507.50 86.4 50.0 6.75 907.25 64.0 28.0 10.50 1111.75 41.1 22.8 30.80 0.00 105.50
112 w 31-May-07 4.50 512.00 50.0 50.0 5.00 912.25 45.0 28.1 10.50 1122.25 21.4 22.8 30.80 0.00 105.50
113 w 1-Jun-07 7.50 519.50 89.9 50.6 8.00 920.25 84.3 28.5 9.50 1131.75 70.9 23.2 30.80 0.00 105.50
114 s 2-Jun-07 5.50 525.00 78.2 50.9 8.50 928.75 50.6 28.7 8.50 1140.25 50.6 23.4 30.80 0.00 105.50
115 w 4-Jun-07 4.50 529.50 46.0 50.8 10.50 939.25 19.7 28.6 10.50 1150.75 19.7 23.4 30.80 0.00 105.50
116 w 5-Jun-07 9.25 538.75 85.2 51.4 10.00 949.25 78.8 29.2 10.00 1160.75 78.8 23.9 30.80 0.00 105.50
117 w 6-Jun-07 4.00 542.75 105.8 51.8 9.50 958.75 44.5 29.3 10.50 1171.25 40.3 24.0 30.80 0.00 105.50
118 w 7-Jun-07 7.00 549.75 91.6 52.3 10.00 968.75 64.2 29.7 11.00 1182.25 58.3 24.3 30.80 0.00 105.50

119 w 8-Jun-07 6.00 555.75 96.3 52.8 10.25 979.00 56.4 30.0 12.00 1194.25 48.2 24.6 30.80 0.00 105.50
120 s 9-Jun-07 6.00 561.75 81.8 53.1 8.50 987.50 57.8 30.2 8.50 1202.75 57.8 24.8 30.80 0.00 105.50
121 w 11-Jun-07 5.75 567.50 67.3 53.2 9.00 996.50 43.0 30.3 9.00 1211.75 43.0 24.9 30.80 1.00 106.50 8.5 3.17
122 w 12-Jun-07 5.50 573.00 105.5 53.7 10.50 1007.00 55.3 30.6 10.50 1222.25 55.3 25.2 30.80 0.00 106.50
123 w 13-Jun-07 8.25 581.25 88.5 54.2 10.50 1017.50 69.5 31.0 10.50 1232.75 69.5 25.6 30.80 0.00 106.50
124 w 14-Jun-07 0.50 581.75 758.0 54.8 6.00 1023.50 63.2 31.2 10.50 1243.25 36.1 25.7 30.80 0.00 106.50
125 w 15-Jun-07 4.50 586.25 90.7 55.1 5.00 1028.50 81.6 31.4 9.00 1252.25 45.3 25.8 30.80 0.00 106.50
126 w 18-Jun-07 7.50 593.75 78.0 55.4 10.50 1039.00 55.7 31.7 10.50 1262.75 55.7 26.1 30.80 0.00 106.50
127 w 19-Jun-07 5.75 599.50 131.0 56.1 9.50 1048.50 79.3 32.1 9.50 1272.25 79.3 26.5 30.80 0.00 106.50
128 w 20-Jun-07 5.50 605.00 23.2 55.8 7.50 1056.00 17.0 32.0 8.50 1280.75 15.0 26.4 30.80 3.50 110.00 0.0 3.07
129 w 21-Jun-07 5.00 610.00 113.3 56.3 7.00 1063.00 80.9 32.3 10.50 1291.25 53.9 26.6 30.80 0.00 110.00
130 w 22-Jun-07 5.00 615.00 103.7 56.7 10.50 1073.50 49.4 32.5 10.50 1301.75 49.4 26.8 30.80 0.00 110.00
ers and pull spoil back, closing
131line broke, sremoved 23-Jun-07
large pieces of 6.25 621.25 108.8 57.2 8.50 1082.00 80.0 32.9 8.50 1310.25 80.0 27.1 30.80 0.00 110.00
132 w 25-Jun-07 3.50 624.75 51.0 57.2 8.50 1090.50 21.0 32.8 8.50 1318.75 21.0 27.1 30.80 0.00 110.00
133 w 26-Jun-07 5.25 630.00 99.8 57.5 9.50 1100.00 55.2 33.0 9.50 1328.25 55.2 27.3 30.80 0.00 110.00
134 w 27-Jun-07 6.25 636.25 74.8 57.7 9.50 1109.50 49.2 33.1 9.50 1337.75 49.2 27.4 30.80 0.00 110.00
135 w 28-Jun-07 0.00 636.25 0.0 57.7 8.00 1117.50 0.0 32.9 8.00 1345.75 0.0 27.3 30.80 0.00 110.00
136 w 29-Jun-07 0.75 637.00 124.7 57.8 13.50 1131.00 6.9 32.5 13.50 1359.25 6.9 27.1 30.80 0.00 110.00
137 w 2-Jul-07 7.75 644.75 114.1 58.5 13.50 1144.50 65.5 32.9 13.50 1372.75 65.5 27.5 30.80 0.00 110.00

138 w 3-Jul-07 3.25 648.00 88.6 58.6 8.50 1153.00 33.9 32.9 8.50 1381.25 33.9 27.5 30.80 0.00 110.00
139 w 5-Jul-07 7.50 655.50 87.6 58.9 8.50 1161.50 77.3 33.3 8.50 1389.75 77.3 27.8 30.80 0.00 110.00
140 w 6-Jul-07 5.00 660.50 106.4 59.3 11.00 1172.50 48.4 33.4 11.00 1400.75 48.4 28.0 30.80 0.00 110.00
141 w 9-Jul-07 4.50 665.00 122.0 59.7 9.50 1182.00 57.8 33.6 10.50 1411.25 52.3 28.1 30.80 0.00 110.00
142 w 10-Jul-07 7.50 672.50 83.5 60.0 8.50 1190.50 73.7 33.9 8.50 1419.75 73.7 28.4 30.80 0.00 110.00
143 w 11-Jul-07 0.00 672.50 0.0 60.0 3.50 1194.00 0.0 33.8 9.50 1429.25 0.0 28.2 30.80 0.00 110.00
144 w 12-Jul-07 0.00 672.50 0.0 60.0 11.00 1205.00 0.0 33.5 11.00 1440.25 0.0 28.0 30.80 0.00 110.00

145 w 13-Jul-07 5.00 677.50 111.6 60.4 7.00 1212.00 79.7 33.7 10.50 1450.75 53.1 28.2 30.80 0.00 110.00
146 w 14-Jul-07 4.25 681.75 84.7 60.5 10.00 1222.00 36.0 33.8 10.00 1460.75 36.0 28.2 30.80 0.00 110.00
147 w 16-Jul-07 6.00 687.75 0.0 60.0 12.00 1234.00 0.0 33.4 12.00 1472.75 0.0 28.0 30.80 0.00 110.00
148 w 17-Jul-07 6.75 694.50 114.7 60.5 9.00 1243.00 86.0 33.8 9.00 1481.75 86.0 28.4 30.80 0.00 110.00
149 w 18-Jul-07 7.50 702.00 52.4 60.4 8.50 1251.50 46.2 33.9 8.50 1490.25 46.2 28.5 30.80 3.50 113.50
150 w 19-Jul-07 7.50 709.50 73.2 60.6 10.50 1262.00 52.3 34.1 10.50 1500.75 52.3 28.6 30.80 2.50 116.00
151 w 20-Jul-07 3.00 712.50 29.7 60.4 10.50 1272.50 8.5 33.8 10.50 1511.25 8.5 28.5 30.80 0.00 116.00
152 s 21-Jul-07 5.50 718.00 34.0 60.2 6.00 1278.50 31.2 33.8 8.50 1519.75 22.0 28.5 30.80 0.00 116.00
153 w 23-Jul-07 0.50 718.50 77.0 60.3 8.50 1287.00 4.5 33.6 8.50 1528.25 4.5 28.3 30.80 0.00 116.00
154 w 24-Jul-07 2.00 720.50 76.5 60.3 10.50 1297.50 14.6 33.5 10.50 1538.75 14.6 28.2 30.80 0.00 116.00
155 w 25-Jul-07 9.00 729.50 82.5 60.6 10.50 1308.00 70.7 33.8 10.50 1549.25 70.7 28.5 30.80 0.00 116.00
156 w 26-Jul-07 9.00 738.50 15.1 60.0 12.50 1320.50 10.9 33.6 12.50 1561.75 10.9 28.4 30.80 0.00 116.00
157 w 27-Jul-07 4.50 743.00 58.6 60.0 8.50 1329.00 31.0 33.5 8.50 1570.25 31.0 28.4 30.80 0.00 116.00
158 s 28-Jul-07 7.50 750.50 52.1 59.9 8.50 1337.50 46.0 33.6 8.50 1578.75 46.0 28.5 30.80 0.00 116.00
159 w 30-Jul-07 7.50 758.00 44.4 59.8 8.50 1346.00 39.2 33.7 8.50 1587.25 39.2 28.5 30.80 0.00 116.00
160 w 31-Jul-07 0.00 758.00 0.0 59.8 2.50 1348.50 0.0 33.6 10.50 1597.75 0.0 28.4 30.80 0.00 116.00
161 w 1-Aug-07 7.50 765.50 116.2 60.3 9.50 1358.00 91.7 34.0 10.50 1608.25 83.0 28.7 30.80 0.00 116.00
162 w 2-Aug-07 7.00 772.50 66.8 60.4 10.50 1368.50 44.5 34.1 10.50 1618.75 44.5 28.8 30.80 1.75 117.75
163 w 3-Aug-07 0.00 772.50 0.0 60.4 6.00 1374.50 0.0 33.9 14.00 1632.75 0.0 28.6 30.80 0.00 117.75
164 s 4-Aug-07 5.25 777.75 103.7 60.7 6.50 1381.00 83.8 34.2 8.50 1641.25 64.1 28.8 30.80 0.00 117.75
165 w 6-Aug-07 5.75 783.50 57.7 60.7 11.50 1392.50 28.8 34.1 11.50 1652.75 28.8 28.8 30.80 1.25 119.00
166 w 7-Aug-07 3.50 787.00 19.4 60.5 6.50 1399.00 10.5 34.0 11.50 1664.25 5.9 28.6 30.80 0.00 119.00
167 w 8-Aug-07 3.00 790.00 68.0 60.5 8.50 1407.50 24.0 34.0 8.50 1672.75 24.0 28.6 30.80 0.00 119.00
168 w 9-Aug-07 8.00 798.00 106.3 61.0 11.50 1419.00 73.9 34.3 11.50 1684.25 73.9 28.9 30.80 0.00 119.00
169 w 10-Aug-07 1.00 799.00 110.5 61.0 4.50 1423.50 24.6 34.3 11.50 1695.75 9.6 28.8 30.80 0.00 119.00
170 s 11-Aug-07 3.50 802.50 81.0 61.1 5.00 1428.50 56.7 34.3 8.50 1704.25 33.4 28.8 30.80 0.00 119.00
171 w 13-Aug-07 2.00 804.50 139.5 61.3 7.50 1436.00 37.2 34.3 11.50 1715.75 24.3 28.7 30.80 0.00 119.00
172 w 14-Aug-07 0.00 804.50 #DIV/0! 61.4 1.50 1437.50 34.0 34.3 8.50 1724.25 6.0 28.6 30.80 0.00 119.00
173 w 15-Aug-07 0.00 804.50 0.0 61.4 0.50 1438.00 0.0 34.3 8.50 1732.75 0.0 28.5 30.80 0.00 119.00
174 w 16-Aug-07 0.00 804.50 0.0 61.4 8.50 1446.50 0.0 34.1 8.50 1741.25 0.0 28.4 30.80 0.00 119.00
175 w 17-Aug-07 0.00 804.50 0.0 61.4 8.50 1455.00 0.0 33.9 8.50 1749.75 0.0 28.2 30.80 0.00 119.00
176 s 18-Aug-07 0.00 804.50 0.0 61.4 8.50 1463.50 0.0 33.7 8.50 1758.25 0.0 28.1 30.80 0.00 119.00
177 w 20-Aug-07 0.00 804.50 0.0 61.4 8.50 1472.00 0.0 33.5 8.50 1766.75 0.0 27.9 30.80 0.00 119.00
178 w 21-Aug-07 0.00 804.50 0.0 61.4 3.50 1475.50 0.0 33.5 8.50 1775.25 0.0 27.8 30.80 0.00 119.00
179 w 22-Aug-07 0.00 804.50 #DIV/0! 61.4 0.50 1476.00 119.0 33.5 8.50 1783.75 7.0 27.7 30.80 0.00 119.00
180 w 23-Aug-07 0.00 804.50 0.0 61.4 0.50 1476.50 0.0 33.5 8.50 1792.25 0.0 27.6 30.80 0.00 119.00
181 w 24-Aug-07 0.00 804.50 0.0 61.4 0.50 1477.00 0.0 33.5 8.50 1800.75 0.0 27.5 30.80 0.00 119.00
182 s 25-Aug-07 0.00 804.50 0.0 61.4 11.00 1488.00 0.0 33.2 11.00 1811.75 0.0 27.3 30.80 0.00 119.00

File: 593040949.xls Date: 05/19/2022


Page 13 of 35
Tab: Digging Rig #1 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

183 w 27-Aug-07 2.75 807.25 105.1 61.6 5.25 1493.25 55.0 33.3 10.50 1822.25 27.5 27.3 30.80 0.00 119.00
184 w 28-Aug-07 0.50 807.75 180.0 61.7 1.75 1495.00 51.4 33.3 8.50 1830.75 10.6 27.2 30.80 0.00 119.00
185 w 29-Aug-07 1.50 809.25 270.0 62.1 4.00 1499.00 101.3 33.5 8.50 1839.25 47.6 27.3 30.80 0.00 119.00
186 w 30-Aug-07 1.75 811.00 15.4 62.0 8.50 1507.50 3.2 33.3 8.50 1847.75 3.2 27.2 30.80 0.00 119.00
187 w 31-Aug-07 1.00 812.00 0.0 61.9 12.00 1519.50 0.0 33.1 12.00 1859.75 0.0 27.0 30.80 0.00 119.00
188 30.80
189 30.80
190 30.80
191 30.80
192 30.80
193 30.80
194 30.80
195 30.80
196 30.80
197 30.80
insert rows above here to add data

w =workday
s =saturday/ sunday
r =rain outs
Total scheduled shifts

File: 593040949.xls Date: 05/19/2022


Page 14 of 35
Tab: Digging Rig #1 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Digging Rig #2
Simonson

Overburden Qty Till Qty Rock Qty ACTUAL AVG BUDGET PANEL EFFICIENCY
curr cumm curr cumm curr cumm curr cumm cumm curr cumm Production NON PRODUCTIVE TOTAL Comments Teeth
Shift type date sf sf sf sf sf sf sf sf sf/day sf/day sf Prod Digging Chisel Blder Chisel Bedrock Joint Clean Move/Setup Teeth/Shanks IDLE Time Rig DT Plant DT Obstructions Delay (Others) (HOURS) Replaced

0 308
1 w 16-Jan-07 136 136 0 0 0 0 136 136 136.0 308 308 LE5 1.75 0.25 0.50 8.00 10.50 Prep Rig to Start Digging
2 w 17-Jan-07 382.5 518.5 0 0 0 0 382.5 518.5 259.3 308 616 LE5 4.75 0.25 0.75 2.50 2.25 10.50 No Bentonite, Vibrations on Liberty
3 w 18-Jan-07 238.5 757 8.5 8.5 0 0.0 247 765.5 255.2 308 924 LE5 2.00 0.50 1.00 6.00 9.50 LE5 Obstr Steel Encased Concr Pile
4 w 19-Jan-07 121.0 878 0 8.5 0 0.0 121 886.5 221.6 308 1232 LE5/ LE3 3.25 3.00 9.25 15.50 LE5 Steel Obstr
5 w 22-Jan-07 144.5 1022.5 0 8.5 0 0.0 144.5 1031.0 206.2 308 1540 LE5/ LE3 3.75 1.25 0.25 1.00 4.25 10.50 Chisel LE3, LE5 Steel Obstr
6 w 23-Jan-07 0.0 1022.5 0 8.5 0 0.0 0 1031.0 171.8 308 1848 LE3 0.00 10.00 10.00 Concrete Placement LE3
7 w 24-Jan-07 193.0 1215.5 34 42.5 0 0.0 227 1258.0 179.7 308 2156 LE5 1.75 0.75 8.00 10.50 LE5 Steel Obstr
8 w 25-Jan-07 78.0 1293.5 0 42.5 0 0.0 78 1336.0 167.0 308 2464 LE5 0.75 3.50 0.75 1.25 2.25 8.50 Remove Steel Caisson
9 w 26-Jan-07 0.0 1293.5 25.5 68.0 9.5 9.5 35 1371.0 152.3 308 2772 LE5 7.00 1.75 0.75 1.00 10.50
10 w 29-Jan-07 0.0 1293.5 25.5 93.5 8.5 18.0 34 1405.0 140.5 308 3080 LE5 3.50 3.75 0.25 0.75 2.00 0.25 10.50 Chisel Till & Rock at LE-5, Replaced cable 2
11 w 30-Jan-07 240.0 1533.5 0 93.5 0 18.0 240 1645.0 149.5 308 3388 CL1 4.00 2.75 1.75 8.50 Moved Setup to CL1, One Hr wait for Bentonite
12 w 31-Jan-07 228.0 1761.5 0 93.5 0 18.0 228 1873.0 156.1 308 3696 C3 4.00 5.00 0.50 1.50 0.50 11.50 Removed Banners, Moved to panel C3, Waiting for hydromill to clean out
13 w 1-Feb-07 0.0 1761.5 0 93.5 21.33 39.3 21.33 1894.3 145.7 308 4004 C3 0.00 8.50 3.00 11.50 Waiting for Hydromill to to Excavate and Clean out C3
14 w 2-Feb-07 0.0 1761.5 0 93.5 19.78 59.1 19.78 1914.1 136.7 308 4312 C3 0.00 3.50 1.00 5.75 0.25 10.50 Waiting for Hydromill, Service done put tremie pipe together for pour on 2/5
15 w 5-Feb-07 0 1761.5 0 93.5 0 59.1 0 1914.1 127.6 308 4620 C10 0.00 3.50 6.00 0.50 10.00 Moved setup to C10
16 w 6-Feb-07 617.84 2379.34 76 169.5 0 59.1 693.84 2608.0 163.0 308 4928 C10 7.50 0.50 1.50 0.50 10.00 Waiting for Operator, Replaced right Lay Cable
17 w 7-Feb-07 0 2379.34 47.5 217.0 9.5 68.6 57 2665.0 156.8 308 5236 C10 7.00 3.00 0.50 10.50 Digging Till and Chiseling Rock
18 w 8-Feb-07 0 2379.34 0 217.0 0 68.6 0 2665.0 148.1 308 5544 LE5 0.00 16.00 16.00 Concrete Placement LE5
19 w 9-Feb-07 0 2379.34 0 217.0 17.39 86.0 17.39 2682.3 141.2 308 5852 C10 0.00 7.25 1.25 8.50 Safet meetg, remove frozen material from jaws
20 w 12-Feb-07 247 2626.34 0 217.0 23.75 109.8 270.75 2953.1 147.7 308 6160 C10 1.50 7.75 1.00 0.25 10.50 Assisted in moving beam, repaired door
21 w 13-Feb-07 19 2645.34 0 217.0 23.75 133.5 42.75 2995.8 142.7 308 6468 C10 0.50 8.50 0.75 0.75 10.50 Repair Chisel
22 w 14-Feb-07 82.33 2727.67 19 236.0 19 152.5 120.33 3116.2 141.6 308 6776 C10 1.50 6.75 2.25 10.50 Did service, moved tremie racks away fom C5
23 w 15-Feb-07 491.75 3219.42 0 236.0 0 152.5 491.75 3607.9 156.9 308 7084 C5 8.50 1.00 0.50 0.50 10.50 Changed buckets
24 w 16-Feb-07 48 3267.42 88 324.0 0 152.5 136 3743.9 156.0 308 7392 C5 10.00 0.50 10.50 working at C5
25 w 20-Feb-07 0 3267.42 0 324.0 0 152.5 0 3743.9 149.8 308 7700 C10 0.00 10.5 10.50 Assiting with Concrete Placement Panel C10
26 w 21-Feb-07 0 3267.42 4 328.0 28 180.5 32 3775.9 145.2 308 8008 C5 2.75 5.25 1.00 0.50 9.50 Chiseling at C5
27 w 22-Feb-07 416 3683.42 16 344.0 0 180.5 432 4207.9 155.8 308 8316 C5 8.25 0.75 1.50 10.50 Waiting for D/B to cut rebar, waiting for bentonite
28 w 23-Feb-07 0 3683.42 72 416.0 0 180.5 72 4279.9 152.9 308 8624 C5 7.50 0.50 5.50 13.50 Cable broke spent time getting bucket out of panel
29 w 26-Feb-07 249.75 3933.17 0 416.0 0 180.5 249.75 4529.7 156.2 308 8932 LE6/ C2 1.75 0.75 0.50 3.00 4.50 10.50 Move C5 to LE6, re-excavate LE6 flowfill, Hit pile obstn, lost 13,000 gal bent.
30 w 27-Feb-07 527.25 4460.42 0 416.0 0 180.5 527.25 5056.9 168.6 308 9240 C2 4.75 4.75 9.50 Hit rebar + concrete, bentonite loss
31 w 28-Feb-07 111 4571.42 37 453.0 0 180.5 148 5204.9 167.9 308 9548 C2 6.25 2.25 8.50 Replace broken shaft
32 w 1-Mar-07 0 4571.42 55.5 508.5 13.88 194.4 69.38 5274.3 164.8 308 9856 C2 8.00 0.50 8.50 Chiseling Rock at C5 as no place for spoils on field
33 w 2-Mar-07 300 4871.42 56.5 565.0 14.88 209.3 371.38 5645.7 171.1 308 10164 C2 3.75 0.5 4.25 8.50 Digging soil at C2, 3' concrete & rebar slab obstn
34 w 5-Mar-07 334.8 5206.22 0 565.0 0 209.3 334.8 5980.5 175.9 308 10472 C2 8.00 0.25 0.25 8.50 digging soil and till at C2
35 w 6-Mar-07 0 5206.22 55.8 620.8 0 209.3 55.8 6036.3 172.5 308 10780 C2 10.50 10.50 digging till all day
36 w 7-Mar-07 0 5206.22 0 620.8 27.75 237.0 27.75 6064.0 168.4 308 11088 C2 0.00 7.00 3.00 0.50 10.50 Chiselig rock, joint cleaning and 6 hrs of critical path (CP) delay
37 w 8-Mar-07 0 5206.22 0 620.8 9.25 246.3 9.25 6073.3 164.1 308 11396 C2 0.00 8.00 0.50 8.50 Chiseling rock, operation shutdown (clamming)
38 w 9-Mar-07 0 5206.22 0 620.8 18.5 264.8 18.5 6091.8 160.3 308 11704 C2 0.00 8.00 0.50 8.50 Chiseling mica schist all day
39 w 12-Mar-07 0 5206.22 0 620.8 0 264.8 0 6091.8 156.2 308 12012 C2 0.00 9.50 0.50 0.50 10.50 chiseled 23.13 SF of extra rock to check for styrofoam
40 w 13-Mar-07 0 5206.22 0 620.8 16.65 281.4 16.65 6108.4 152.7 308 12320 C2 0.00 6.25 0.75 4.5 11.50 Clean endstop, desanding C2 panel with derrick desander unit
41 w 14-Mar-07 0 5206.22 0 620.8 20 301.4 20 6128.4 149.5 308 12628 C2/ LE2 0.00 4.50 0.50 5.50 10.50 Service C2 Hole to setup + maintain desander unit,Chiseling rock at LE2
42 w 15-Mar-07 0 5206.22 0 620.8 10 311.4 10 6138.4 146.2 308 12936 C2/ LE2 0.00 3.00 0.50 6.25 0.75 10.50 Finish Desanding C2 and setup for pour, repair chisel, chiseled rock
43 w 16-Mar-07 0 5206.22 0 620.8 10 321.4 10 6148.4 143.0 308 13244 LE2 0.00 7.00 1.50 8.50 Mass Safety Mtg, review work plans
44 s 17-Mar-07 0 5206.22 0 620.8 10 331.4 10 6158.4 140.0 308 13552 LE2 0.00 8.00 0.50 8.50 Chiseling rock on all bites
45 w 19-Mar-07 220 5426.22 0 620.8 0 331.4 220 6378.4 141.7 308 13860 LE2/LE6/CL4 1.50 1.50 1.00 0.50 1.00 5.00 10.50 Re-excavate middle bite LE6, loss of bentonite due to obstn at CL4
46 w 20-Mar-07 116 5542.22 0 620.8 0 331.4 116 6494.4 141.2 308 14168 CL4/LE2 0.00 1.00 0.25 0.50 10.00 11.75 Obstn from 03/19/07 reinforced concrete slab from depth 15.5' depth
47 w 21-Mar-07 144 5686.22 0 620.8 0 331.4 144 6638.4 141.2 308 14476 LE2/CL4 4.25 1 1.75 3.50 10.50 Clean endstops, move equip & setup tremie pipes, move to CL4
48 w 22-Mar-07 328 6014.22 16 636.8 0 331.4 344 6982.4 145.5 308 14784 CL4 5.50 0.50 4.50 10.50 Conc. Reinforced slab obstruction using chisel , pushed verticality way out
49 w 23-Mar-07 152 6166.22 0 636.8 0 331.4 152 7134.4 145.6 308 15092 CL4/ C4 6.50 3.50 0.50 10.50 Abandoned CL4 north bite due to excessive deviation on south edge
50 w 26-Mar-07 450 6616.22 81 717.8 0 331.4 531 7665.4 153.3 308 15400 C4 8.50 0.50 9.00 digging soil and Till at C4
51 w 27-Mar-07 52.5 6668.72 76.5 794.3 0 331.4 129 7794.4 152.8 308 15708 C4 8.00 0.50 2.00 10.50 H Beam obstn at 5' on south edge of bite, Using chiesl ad clam on Till
52 w 28-Mar-07 0 6668.72 34 828.3 0 331.4 34 7828.4 150.5 308 16016 C4 7.00 1.50 2.00 10.50 spent 1.5 hrs joint cleaning C7
53 w 29-Mar-07 22.5 6691.22 0 828.3 0 331.4 22.5 7850.9 148.1 308 16324 C4 0.00 0.50 8.00 8.50 working on beam obstn all day with 36" clamshell
Standby removing H-Beam Obstn, repair damage to lagging under C3
54 w 30-Mar-07 0 6691.22 0 828.3 0 331.4 0 7850.9 145.4 308 16632 C4 0.00 0.50 8.00 8.50 guidewalls due to removing obstn
55 w 2-Apr-07 128 6819.22 0 828.3 0 331.4 128 7978.9 145.1 308 16940 C4/ C9 2.50 0.50 0.50 8.00 11.50 Service setting up stone & lean mix at C4, service pour & dismantle tremie
56 w 3-Apr-07 288 7107.22 24 852.3 0 331.4 312 8290.9 148.1 308 17248 C4/ C9 8.75 1.75 10.50 move to test C4 lean mix (too soft so moved back to C9)
57 w 4-Apr-07 0 7107.22 0 852.3 0 331.4 0 8290.9 145.5 308 17556 C4 0.00 0.50 2.25 8.25 11.00 Re-excavating lean mix poured on 04/02/07, broke closing line in bucket
58 w 5-Apr-07 288 7395.22 0 852.3 0 331.4 288 8578.9 147.9 308 17864 C4 7.25 1.25 0.50 1.50 10.50 No operator (standby), reverse closing line, re-excavate lean mix in north bite
59 w 6-Apr-07 0 7395.22 0 852.3 0 331.4 0 8578.9 145.4 308 18172 C4 0.00 1.75 5.75 7.50 Mass safety mtg, re-excavate lean mix and stone backfill, no bentonite
60 w 9-Apr-07 187.5 7582.72 48 900.3 0 331.4 235.5 8814.4 146.9 308 18480 C4/ C9 8.25 0.25 0.50 1.50 10.50 Clean out backfill material due to obstructions
61 w 10-Apr-07 210 7792.72 37.5 937.8 0 331.4 247.5 9061.9 148.6 308 18788 C9 8.00 0.50 8.50 Digging soil and till at C9
62 w 11-Apr-07 0 7792.72 22.5 960.3 30 361.4 52.5 9114.4 147.0 308 19096 C9 3.50 5.50 0.50 1.00 10.50 Extra Depth Beyond as bid toe level (extra work)
63 w 12-Apr-07 0 7792.72 0 960.3 30 391.4 30 9144.4 145.1 308 19404 C9 0.00 1.50 0.50 6.50 8.50 Delay Excavating additional rock beyond as bid toe level of 243.00 elev.
64 w 13-Apr-07 0 7792.72 0 960.3 16 407.4 16 9160.4 143.1 308 19712 C9 0.00 8.00 0.50 8.50 Chisel 2 holes in C9 East Bite
65 w 16-Apr-07 153 7945.72 0 960.3 28 435.4 181 9341.4 143.7 308 20020 C9/ LE8 1.75 7.00 1.25 0.50 10.50 Finish chisel and cleaned out bite at C9
66 w 17-Apr-07 0 7945.72 80.5 1040.8 0 435.4 80.5 9421.9 142.8 308 20328 CL2 8.00 0.50 8.50 Digging Till, removed a large boulder at 74'
67 w 18-Apr-07 153 8098.72 34 1074.8 0 435.4 187 9608.9 143.4 308 20636 C1 3.75 1.00 1.50 4.25 10.50 Safety Meeting, Repair Door on Crane, Broke holding line cable on Rig
68 w 19-Apr-07 450.5 8549.22 34 1108.8 0 435.4 484.5 10093.4 148.4 308 20944 C1 8.00 1.00 1.50 10.50 Obstn at 16' concrete slab, wait for bentonite
69 w 20-Apr-07 0 8549.22 51 1159.8 0 435.4 51 10144.4 147.0 308 21252 C1/ CL2 7.25 0.50 2.75 10.50 Assist Hydromill Chisel Rock at CL2
70 s 21-Apr-07 0 8549.22 80.75 1240.6 0 435.4 80.75 10225.2 146.1 308 21560 C1/ CL2 5.50 0.50 2.50 8.50 Standby operator late, Assisting hydromil chisel rock
71 w 23-Apr-07 0 8549.22 27.5 1268.1 13 448.4 40.5 10265.7 144.6 308 21868 C1/ CL2 3.00 3.00 1.00 2.75 0.75 10.50 Repair Chisel, assist mill chisel rock
72 w 24-Apr-07 258 8807.22 0 1268.1 0 448.4 258 10523.7 146.2 308 22176 CL2/ LG4 3.50 0.75 1.00 1.50 1.75 8.50 Chiseling CL2 middle bite, standby waitg to clean endstop
73 w 25-Apr-07 56 8863.22 0 1268.1 16 464.4 72 10595.7 145.1 308 22484 LG4 2.00 7.00 0.50 9.50 Chiseling rock
74 w 26-Apr-07 128 8991.22 0 1268.1 24 488.4 152 10747.7 145.2 308 22792 LG4 3.75 4.50 0.50 0.75 9.50 Fixing prob with Door on Rig
75 w 27-Apr-07 0 8991.22 0 1268.1 0 488.4 0 10747.7 143.3 308 23100 C6 0.00 5.00 0.75 2.75 8.50 assisting hydromill chisel rock at C6
76 s 28-Apr-07 0 8991.22 0 1268.1 8 496.4 8 10755.7 141.5 308 23408 LG4 0.00 8.00 0.50 8.50 Chisel Rock LG4
77 w 30-Apr-07 125 9116.22 0 1268.1 10 506.4 135 10890.7 141.4 308 23716 LG4 3.00 5.00 0.50 8.50 Starighten out bottom of panel in rock using square chisel
78 w 1-May-07 0 9116.22 0 1268.1 0 506.4 0 10890.7 139.6 308 24024 C6 0.00 1.50 9.00 10.50 Service and Setup for C6 pour
79 w 2-May-07 307.5 9423.72 0 1268.1 0 506.4 307.5 11198.2 141.7 308 24332 C8 5.50 1.00 1.00 1.00 8.50 Changed teeth on bucket, no bentonite
80 w 3-May-07 82.5 9506.22 11.25 1279.3 0 506.4 93.75 11291.9 141.1 308 24640 C8 4.50 3.50 0.50 8.50 Demo surface grade beam and change out clamshell
81 w 4-May-07 0 9506.22 63.75 1343.1 7.5 513.9 71.25 11363.2 140.3 308 24948 C8 4.50 1.50 1.50 1.00 8.50 No operator, broke closing line on chisel cable
82 w 7-May-07 0 9506.22 0 1343.1 7.5 521.4 7.5 11370.7 138.7 308 25256 C8 0.00 7.00 1.00 0.50 8.50 Chisel rock all day
83 w 8-May-07 0 9506.22 0 1343.1 26.25 547.7 26.25 11396.9 137.3 308 25564 LG3/C8 1.00 4.50 1.00 2.00 8.50 Move to C8 to chisel, standby waiting for mill to clean out
84 w 9-May-07 0 9506.22 0 1343.1 0 547.7 0 11396.9 135.7 308 25872 C8 0.00 1.00 2.00 5.50 8.50 Setup to assist hydromill with chiseling, clean endstops
85 w 10-May-07 0 9506.22 0 1343.1 0 547.7 0 11396.9 134.1 308 26180 C8 0.00 10.50 10.50 Assist with C8 panel pour
86 w 11-May-07 0 9506.22 0 1343.1 0 547.7 0 11396.9 132.5 308 26488 0.00 8.50 8.50 Service setup fpr C11 guidewall pour and service LG3 pour
87 s 12-May-07 171 9677.22 0 1343.1 0 547.7 171 11567.9 133.0 308 26796 C11 3.00 4.00 1.50 8.50 Srvice job, steel/rebar obstns in north bite @ 16' - 19'
88 w 14-May-07 60 9737.22 76 1419.1 0 547.7 136 11703.9 133.0 308 27104 C11 8.00 0.50 8.50 Digging Soil and Till
89 w 15-May-07 0 9737.22 0 1419.1 20 567.7 20 11723.9 131.7 308 27412 C11 0.00 9.00 0.50 9.50 Chisel rock all day
90 w 16-May-07 187 9924.22 0 1419.1 0 567.7 187 11910.9 132.3 308 27720 C11 5.00 0.50 4.00 9.50 Chiseling obstn at endstops
91 w 17-May-07 0 9924.22 0 1419.1 54 621.7 54 11964.9 131.5 308 28028 C11 0.00 9.00 0.50 9.50 Chisel rock all day
92 w 18-May-07 240.48 10164.7 94.98 1514.0 4.04 625.7 339.5 12304.4 133.7 308 28336 C11 5.50 3.00 0.50 9.00 Digging Soil , Till and Rock
93 s 19-May-07 0 10164.7 0 1514.0 8.08 633.8 8.08 12312.5 132.4 308 28644 C11 0.00 7.50 1.50 0.50 9.50 Chiseling rock
94 w 21-May-07 0 10164.7 0 1514.0 0 633.8 0 12312.5 131.0 308 28952 C11 0.00 9.50 9.50 Desanding panel C11
95 w 22-May-07 0 10164.7 0 1514.0 0 633.8 0 12312.5 129.6 308 29260 C11 0.00 2.00 7.50 9.50 Desanding panel C11
96 308 29568
97 308 29876

File: 593040949.xls Date: 05/19/2022


Page 15 of 35
Tab: Digging Rig #2 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

98 308 30184
99 308 30492
100 308 30800
101 308 31108
102 308 31416
103 308 31724
104 308 32032
105 308 32340
106 308 32648
107 308 32956
108 308 33264
109 308 33572
110 308 33880
111 308 34188
112 308 34496
113 308 34804
114 308 35112
115 308 35420
116 308 35728
117 308 36036
118 308 36344
119 308 36652
120 308 36960
121 308 37268
122 308 37576
123 308 37884
124 308 38192
125 308 38500
126 308 38808
127 308 39116
128 308 39424
129 308 39732
130 308 40040
131 308 40348
132 308 40656
133 308 40964
134 308 41272
135 308 41580
136 308 41888
137 308 42196
138 308 42504
139 308 42812
140 308 43120
141 308 43428
142 308 43736
143 308 44044
144 308 44352
145 308 44660
146 308 44968
147 308 45276
148 308 45584
149 308 45892
150 308 46200
151 308 46508
152 308 46816
153 308 47124
154 308 47432
155 308 47740
156 308 48048
157 308 48356
158 308 48664
159 308 48972
160 308 49280
161 308 49588
162 308 49896
163 308 50204
164 308 50512
165 308 50820
166 308 51128
167 308 51436
168 308 51744

insert rows above here to add data


300.50 3.50 223.75 22.25 39.00 0.25 178.50 37.00 1.00 83.75 46.75 936.25
w =workday 90 32.1% 0.4% 23.9% 2.4% 4.2% 0.0% 19.1% 4.0% 0.1% 8.9% 5.0%
s =saturday/ sunday 5
r =rain outs 0
Total scheduled shifts 95

File: 593040949.xls Date: 05/19/2022


Page 16 of 35
Tab: Digging Rig #2 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Digging Rig #2
Simonson
MANHOUR FACTORS
Production w/ no DT Production w/ KT DT Production overall BUDGET Chiseling Bedrock OVERBURDEN TILL COMBINED
Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive Productive cumm Prod Prod Ave Prod mh/sf mh/sf mh/sf
Shift type date rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours rig hours sf/hr sf/hr budget curr to date budget curr to date budget curr to date

0
1 w 16-Jan-07 1.75 1.75 77.7 77.7 10.50 10.50 13.0 13.0 10.50 10.50 13.0 13.0 30.80 0.00 0.00 0.082 0.00 0.00 0.126 0.00 #DIV/0! 0.000 0.00 0.00
2 w 17-Jan-07 4.75 6.50 80.5 79.8 5.75 16.25 66.5 31.9 10.50 21.00 36.4 24.7 30.80 0.00 0.00 0.082 0.00 0.00 0.126 0.00 #DIV/0! 0.000 0.00 0.00
3 w 18-Jan-07 2.00 8.50 123.5 90.1 3.50 19.75 70.6 38.8 9.50 30.50 26.0 25.1 30.80 0.00 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
4 w 19-Jan-07 3.25 11.75 37.2 75.4 6.25 26.00 19.4 34.1 15.50 46.00 7.8 19.3 30.80 0.00 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
5 w 22-Jan-07 5.00 16.75 28.9 61.6 6.25 32.25 23.1 32.0 10.50 56.50 13.8 18.2 30.80 1.25 1.25 0.0 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
6 w 23-Jan-07 0.00 16.75 0.0 61.6 10.00 42.25 0.0 24.4 10.00 66.50 0.0 15.5 30.80 0.00 1.25 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
7 w 24-Jan-07 1.75 18.50 129.7 68.0 2.50 44.75 90.8 28.1 10.50 77.00 21.6 16.3 30.80 0.00 1.25 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
8 w 25-Jan-07 0.75 19.25 104.0 69.4 5.00 49.75 15.6 26.9 8.50 85.50 9.2 15.6 30.80 0.00 1.25 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
9 w 26-Jan-07 8.75 28.00 4.0 49.0 10.50 60.25 3.3 22.8 10.50 96.00 3.3 14.3 30.80 1.75 3.00 5.4 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
10 w 29-Jan-07 7.25 35.25 4.7 39.9 10.25 70.50 3.3 19.9 10.50 106.50 3.2 13.2 30.80 3.75 6.75 4.8 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
11 w 30-Jan-07 4.00 39.25 60.0 41.9 8.50 79.00 28.2 20.8 8.50 115.00 28.2 14.3 30.80 0.00 6.75 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
12 w 31-Jan-07 9.00 48.25 25.3 38.8 11.50 90.50 19.8 20.7 11.50 126.50 19.8 14.8 30.80 5.00 11.75 3.6 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
13 w 1-Feb-07 8.50 56.75 2.5 33.4 11.50 102.00 1.9 18.6 11.50 138.00 1.9 13.7 30.80 8.50 20.25 4.6 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
14 w 2-Feb-07 3.50 60.25 5.7 31.8 10.50 112.50 1.9 17.0 10.50 148.50 1.9 12.9 30.80 3.50 23.75 16.9 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
15 w 5-Feb-07 3.50 63.75 0.0 30.0 10.00 122.50 0.0 15.6 10.00 158.50 0.0 12.1 30.80 0.00 23.75 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
16 w 6-Feb-07 7.50 71.25 92.5 36.6 10.00 132.50 69.4 19.7 10.00 168.50 69.4 15.5 30.80 0.00 23.75 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
17 w 7-Feb-07 10.00 81.25 5.7 32.8 10.50 143.00 5.4 18.6 10.50 179.00 5.4 14.9 30.80 3.00 26.75 22.9 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
18 w 8-Feb-07 0.00 81.25 0.0 32.8 16.00 159.00 0.0 16.8 16.00 195.00 0.0 13.7 30.80 0.00 26.75 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
19 w 9-Feb-07 7.25 88.50 2.4 30.3 8.50 167.50 2.0 16.0 8.50 203.50 2.0 13.2 30.80 7.25 34.00 11.9 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
20 w 12-Feb-07 9.25 97.75 29.3 30.2 10.50 178.00 25.8 16.6 10.50 214.00 25.8 13.8 30.80 7.75 41.75 14.2 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
21 w 13-Feb-07 9.00 106.75 4.8 28.1 10.50 188.50 4.1 15.9 10.50 224.50 4.1 13.3 30.80 8.50 50.25 15.7 0.00 0.082 0.00 0.126 0.00 0.00
22 w 14-Feb-07 8.25 115.00 14.6 27.1 10.50 199.00 11.5 15.7 10.50 235.00 11.5 13.3 30.80 6.75 57.00 22.6 0.00 0.082 0.00 0.126 0.00 0.00
23 w 15-Feb-07 8.50 123.50 57.9 29.2 10.50 209.50 46.8 17.2 10.50 245.50 46.8 14.7 30.80 0.00 57.00 0.082 0.00 0.126 0.00 0.00
24 w 16-Feb-07 10.00 133.50 13.6 28.0 10.50 220.00 13.0 17.0 10.50 256.00 13.0 14.6 30.80 0.00 57.00 0.082 0.00 0.126 0.00 0.00
25 w 20-Feb-07 0.00 133.50 0.0 28.0 10.50 230.50 0.0 16.2 10.50 266.50 0.0 14.0 30.80 0.00 57.00 0.082 0.00 0.126 0.00 0.00
26 w 21-Feb-07 8.00 141.50 4.0 26.7 9.50 240.00 3.4 15.7 9.50 276.00 3.4 13.7 30.80 5.25 62.25 34.4 0.00 0.082 0.00 0.126 0.00 0.00
27 w 22-Feb-07 8.25 149.75 52.4 28.1 10.50 250.50 41.1 16.8 10.50 286.50 41.1 14.7 30.80 0.00 62.25 0.082 0.00 0.126 0.00 0.00
28 w 23-Feb-07 7.50 157.25 9.6 27.2 13.50 264.00 5.3 16.2 13.50 300.00 5.3 14.3 30.80 0.00 62.25 0.082 0.00 0.126 0.00 0.00
29 w 26-Feb-07 1.75 159.00 142.7 28.5 3.00 267.00 83.3 17.0 10.50 310.50 23.8 14.6 30.80 0.00 62.25 0.082 0.126
30 w 27-Feb-07 4.75 163.75 111.0 30.9 4.75 271.75 111.0 18.6 9.50 320.00 55.5 15.8 30.80 0.00 62.25 0.082 0.126
31 w 28-Feb-07 6.25 170.00 23.7 30.6 8.50 280.25 17.4 18.6 8.50 328.50 17.4 15.8 30.80 0.00 62.25 0.082 0.126
32 w 1-Mar-07 8.00 178.00 8.7 29.6 8.50 288.75 8.2 18.3 8.50 337.00 8.2 15.7 30.80 0.00 62.25 0.082 0.126
33 w 2-Mar-07 3.75 181.75 99.0 31.1 4.25 293.00 87.4 19.3 8.50 345.50 43.7 16.3 30.80 0.00 62.25 0.082 0.126
34 w 5-Mar-07 8.00 189.75 41.9 31.5 8.50 301.50 39.4 19.8 8.50 354.00 39.4 16.9 30.80 0.00 62.25
35 w 6-Mar-07 10.50 200.25 5.3 30.1 10.50 312.00 5.3 19.3 10.50 364.50 5.3 16.6 30.80 0.00 62.25
36 w 7-Mar-07 7.00 207.25 4.0 29.3 10.50 322.50 2.6 18.8 10.50 375.00 2.6 16.2 30.80 7.00 69.25 33.9 0.00
37 w 8-Mar-07 8.00 215.25 1.2 28.2 8.50 331.00 1.1 18.3 8.50 383.50 1.1 15.8 30.80 8.00 77.25 30.8 0.00
38 w 9-Mar-07 8.00 223.25 2.3 27.3 8.50 339.50 2.2 17.9 8.50 392.00 2.2 15.5 30.80 8.00 85.25 33.1 0.00
39 w 12-Mar-07 9.50 232.75 0.0 26.2 10.50 350.00 0.0 17.4 10.50 402.50 0.0 15.1 30.80 9.50 94.75 27.9 0.00
40 w 13-Mar-07 6.25 239.00 2.7 25.6 11.50 361.50 1.4 16.9 11.50 414.00 1.4 14.8 30.80 6.25 101.00 45.0 0.00
41 w 14-Mar-07 4.50 243.50 4.4 25.2 10.50 372.00 1.9 16.5 10.50 424.50 1.9 14.4 30.80 4.50 105.50 67.0 0.00
42 w 15-Mar-07 3.00 246.50 3.3 24.9 10.50 382.50 1.0 16.0 10.50 435.00 1.0 14.1 30.80 3.00 108.50 103.8 0.00
43 w 16-Mar-07 7.00 253.50 1.4 24.3 8.50 391.00 1.2 15.7 8.50 443.50 1.2 13.9 30.80 7.00 115.50 45.9 0.00
44 s 17-Mar-07 8.00 261.50 1.3 23.6 8.50 399.50 1.2 15.4 8.50 452.00 1.2 13.6 30.80 8.00 123.50 41.4 0.00
45 w 19-Mar-07 3.00 264.50 73.3 24.1 4.50 404.00 48.9 15.8 10.50 462.50 21.0 13.8 30.80 1.50 125.00 220.9 0.00
46 w 20-Mar-07 1.00 265.50 116.0 24.5 1.75 405.75 66.3 16.0 11.75 474.25 9.9 13.7 30.80 1.00 126.00 331.4 0.00
47 w 21-Mar-07 4.25 269.75 33.9 24.6 10.50 416.25 13.7 15.9 10.50 484.75 13.7 13.7 30.80 0.00 126.00
48 w 22-Mar-07 5.50 275.25 62.5 25.4 6.00 422.25 57.3 16.5 10.50 495.25 32.8 14.1 30.80 0.00 126.00
49 w 23-Mar-07 6.50 281.75 23.4 25.3 10.50 432.75 14.5 16.5 10.50 505.75 14.5 14.1 30.80 0.00 126.00
50 w 26-Mar-07 8.50 290.25 62.5 26.4 9.00 441.75 59.0 17.4 9.00 514.75 59.0 14.9 30.80 0.00 126.00
51 w 27-Mar-07 8.00 298.25 16.1 26.1 8.50 450.25 15.2 17.3 10.50 525.25 12.3 14.8 30.80 0.00 126.00
52 w 28-Mar-07 7.00 305.25 4.9 25.6 10.50 460.75 3.2 17.0 10.50 535.75 3.2 14.6 30.80 0.00 126.00
53 w 29-Mar-07 0.00 305.25 #DIV/0! 25.7 0.50 461.25 45.0 17.0 8.50 544.25 2.6 14.4 30.80 0.00 126.00

54 w 30-Mar-07 0.00 305.25 0.0 25.7 0.50 461.75 0.0 17.0 8.50 552.75 0.0 14.2 30.80 0.00 126.00
55 w 2-Apr-07 2.50 307.75 51.2 25.9 3.50 465.25 36.6 17.1 11.50 564.25 11.1 14.1 30.80 0.00 126.00
56 w 3-Apr-07 8.75 316.50 35.7 26.2 10.50 475.75 29.7 17.4 10.50 574.75 29.7 14.4 30.80 0.00 126.00
57 w 4-Apr-07 0.00 316.50 0.0 26.2 2.75 478.50 0.0 17.3 11.00 585.75 0.0 14.2 30.80 0.00 126.00
58 w 5-Apr-07 7.25 323.75 39.7 26.5 9.00 487.50 32.0 17.6 10.50 596.25 27.4 14.4 30.80 0.00 126.00
59 w 6-Apr-07 0.00 323.75 0.0 26.5 1.75 489.25 0.0 17.5 7.50 603.75 0.0 14.2 30.80 0.00 126.00
60 w 9-Apr-07 8.25 332.00 28.5 26.5 9.00 498.25 26.2 17.7 10.50 614.25 22.4 14.3 30.80 0.00 126.00
61 w 10-Apr-07 8.00 340.00 30.9 26.7 8.50 506.75 29.1 17.9 8.50 622.75 29.1 14.6 30.80 0.00 126.00
62 w 11-Apr-07 9.00 349.00 5.8 26.1 9.50 516.25 5.5 17.7 10.50 633.25 5.0 14.4 30.80 5.50 131.50 65.7 0.00
63 w 12-Apr-07 1.50 350.50 20.0 26.1 2.00 518.25 15.0 17.6 8.50 641.75 3.5 14.2 30.80 1.50 133.00 260.9 0.00
64 w 13-Apr-07 8.00 358.50 2.0 25.6 8.50 526.75 1.9 17.4 8.50 650.25 1.9 14.1 30.80 8.00 141.00 50.9 0.00
65 w 16-Apr-07 8.75 367.25 20.7 25.4 10.50 537.25 17.2 17.4 10.50 660.75 17.2 14.1 30.80 7.00 148.00 62.2 0.00
66 w 17-Apr-07 8.00 375.25 10.1 25.1 8.50 545.75 9.5 17.3 8.50 669.25 9.5 14.1 30.80 0.00 148.00
67 w 18-Apr-07 3.75 379.00 49.9 25.4 10.50 556.25 17.8 17.3 10.50 679.75 17.8 14.1 30.80 0.00 148.00
68 w 19-Apr-07 8.00 387.00 60.6 26.1 9.00 565.25 53.8 17.9 10.50 690.25 46.1 14.6 30.80 0.00 148.00
69 w 20-Apr-07 7.25 394.25 7.0 25.7 10.50 575.75 4.9 17.6 10.50 700.75 4.9 14.5 30.80 0.00 148.00
70 s 21-Apr-07 5.50 399.75 14.7 25.6 8.50 584.25 9.5 17.5 8.50 709.25 9.5 14.4 30.80 0.00 148.00
71 w 23-Apr-07 6.00 405.75 6.8 25.3 10.50 594.75 3.9 17.3 10.50 719.75 3.9 14.3 30.80 3.00 151.00 149.5 0.00
72 w 24-Apr-07 4.25 410.00 60.7 25.7 8.50 603.25 30.4 17.4 8.50 728.25 30.4 14.5 30.80 0.75 151.75 597.9 0.00
73 w 25-Apr-07 9.00 419.00 8.0 25.3 9.50 612.75 7.6 17.3 9.50 737.75 7.6 14.4 30.80 7.00 158.75 66.3 0.00
74 w 26-Apr-07 8.25 427.25 18.4 25.2 9.50 622.25 16.0 17.3 9.50 747.25 16.0 14.4 30.80 4.50 163.25 108.5 0.00
75 w 27-Apr-07 5.00 432.25 0.0 24.9 8.50 630.75 0.0 17.0 8.50 755.75 0.0 14.2 30.80 5.00 168.25 97.7 0.00
76 s 28-Apr-07 8.00 440.25 1.0 24.4 8.50 639.25 0.9 16.8 8.50 764.25 0.9 14.1 30.80 8.00 176.25 62.1 0.00
77 w 30-Apr-07 8.00 448.25 16.9 24.3 8.50 647.75 15.9 16.8 8.50 772.75 15.9 14.1 30.80 5.00 181.25 101.3 0.00
78 w 1-May-07 0.00 448.25 0.0 24.3 10.50 658.25 0.0 16.5 10.50 783.25 0.0 13.9 30.80 0.00 181.25
79 w 2-May-07 5.50 453.75 55.9 24.7 8.50 666.75 36.2 16.8 8.50 791.75 36.2 14.1 30.80 0.00 181.25
80 w 3-May-07 4.50 458.25 20.8 24.6 8.50 675.25 11.0 16.7 8.50 800.25 11.0 14.1 30.80 0.00 181.25
81 w 4-May-07 6.00 464.25 11.9 24.5 8.50 683.75 8.4 16.6 8.50 808.75 8.4 14.1 30.80 1.50 182.75 342.6 0.00
82 w 7-May-07 7.00 471.25 1.1 24.1 8.50 692.25 0.9 16.4 8.50 817.25 0.9 13.9 30.80 7.00 189.75 74.5 0.00
83 w 8-May-07 5.50 476.75 4.8 23.9 8.50 700.75 3.1 16.3 8.50 825.75 3.1 13.8 30.80 4.50 194.25 121.7 0.00
84 w 9-May-07 1.00 477.75 0.0 23.9 8.50 709.25 0.0 16.1 8.50 834.25 0.0 13.7 30.80 1.00 195.25 547.7 0.00
85 w 10-May-07 0.00 477.75 0.0 23.9 10.50 719.75 0.0 15.8 10.50 844.75 0.0 13.5 30.80 0.00 195.25
86 w 11-May-07 0.00 477.75 0.0 23.9 8.50 728.25 0.0 15.6 8.50 853.25 0.0 13.4 30.80 0.00 195.25
87 s 12-May-07 3.00 480.75 57.0 24.1 7.00 735.25 24.4 15.7 8.50 861.75 20.1 13.4 30.80 0.00 195.25
88 w 14-May-07 8.00 488.75 17.0 23.9 8.50 743.75 16.0 15.7 8.50 870.25 16.0 13.4 30.80 0.00 195.25
89 w 15-May-07 9.00 497.75 2.2 23.6 9.50 753.25 2.1 15.6 9.50 879.75 2.1 13.3 30.80 9.00 204.25 63.1 0.00
90 w 16-May-07 5.00 502.75 37.4 23.7 5.50 758.75 34.0 15.7 9.50 889.25 19.7 13.4 30.80 0.00 204.25
91 w 17-May-07 9.00 511.75 6.0 23.4 9.50 768.25 5.7 15.6 9.50 898.75 5.7 13.3 30.80 9.00 213.25 69.1 0.00
92 w 18-May-07 8.50 520.25 39.9 23.7 9.00 777.25 37.7 15.8 9.00 907.75 37.7 13.6 30.80 3.00 216.25 208.6 0.00
93 s 19-May-07 7.50 527.75 1.1 23.3 9.50 786.75 0.9 15.6 9.50 917.25 0.9 13.4 30.80 7.50 223.75 84.5 0.00
94 w 21-May-07 0.00 527.75 0.0 23.3 9.50 796.25 0.0 15.5 9.50 926.75 0.0 13.3 30.80 0.00 223.75
95 w 22-May-07 0.00 527.75 0.0 23.3 9.50 805.75 0.0 15.3 9.50 936.25 0.0 13.2 30.80 0.00 223.75
96 30.80
97 30.80

File: 593040949.xls Date: 05/19/2022


Page 17 of 35
Tab: Digging Rig #2 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

98 30.80
99 30.80
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148 30.80
149 30.80
150 30.80
151 30.80
152 30.80
153 30.80
154 30.80
155 30.80
156 30.80
157 30.80
158 30.80
159 30.80
160 30.80
161 30.80
162 30.80
163 30.80
164 30.80
165 30.80
166 30.80
167 30.80
168 30.80

insert rows above here to add data

w =workday
s =saturday/ sunday
r =rain outs
Total scheduled shifts

File: 593040949.xls Date: 05/19/2022


Page 18 of 35
Tab: Digging Rig #2 Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Digging Rig (Night Shift)
Joe

Overburden Qty Till Qty Rock Qty ACTUAL AVG BUDGET PANEL EFFICIENCY
curr cumm curr cumm curr cumm curr cumm cumm curr cumm Production NON PRODUCTIVE TOTAL Comments Teeth
Shift type date sf sf sf sf sf sf sf sf sf/day sf/day sf Prod Digging Chisel Blder Chisel Bedrock Joint Clean Move/Setup Teeth/Shanks IDLE Time Rig DT Plant DT Obstructions Delay (Others) (HOURS) Replaced

0 308
1 w 24-Apr-07 240 240 0 0 0 0 240 240 240.0 308 308 LG4 7.75 0.25 0.50 8.50 Prep Rig to Start Digging
2 w 25-Apr-07 128 368 0 0 0 0 128 368 184.0 308 616 LG4 3.50 4.50 0.50 8.50 Chiseled 2 bites to 53'
3 w 26-Apr-07 0 368 0 0 16 16 16 384 128.0 308 924 LG4 0.00 7.50 0.50 0.50 8.50 Fix pin on crane, cut frayed wires
4 w 27-Apr-07 0 368 0 0 12 28 12 396 99.0 308 1232 C6/ LG4 0.00 7.50 0.50 0.50 8.50 Assist hydromill chisel rock
5 w 30-Apr-07 233.75 601.75 0 0 0 28 233.75 629.75 126.0 308 1540 C6/ CL3 4.25 2.00 0.50 1.75 8.50 waiting for mill to move, clean endstops at C6
6 w 1-May-07 246.5 848.25 34 34 0 28 280.5 910.25 151.7 308 1848 CL3 5.75 0.75 2.00 8.50 No operator, chiseled conc obstns removed 3' piece of concrete
7 w 2-May-07 97.5 945.75 18.75 52.75 0 28 116.25 1026.5 146.6 308 2156 C8 8.00 0.50 8.50 Digging Soil + Till
8 w 3-May-07 322.5 1268.25 0 52.75 0 28 322.5 1349 168.6 308 2464 C8 7.75 0.50 0.25 8.50 Fix Cable on Crane and chisel Till
9 w 4-May-07 0 1268.25 7.5 60.25 7.5 35.5 15 1364 151.6 308 2772 C8 0.50 5.25 0.25 1.00 1.50 8.50 Changing closing line, chisel rock
10 w 7-May-07 0 1268.25 0 60.25 22.5 58 22.5 1386.5 138.7 308 3080 C8 0.00 7.25 0.75 0.50 8.50 Cleaning south bite, change rigging on chisel
11 w 8-May-07 0 1268.25 0 60.25 0 58 0 1386.5 126.0 308 3388 C8/ LG3 2.00 5.25 0.50 0.75 8.50 Clean endstop for hydromill, straigthen panel LG3, start chisel LG3
12 w 9-May-07 0 1268.25 0 60.25 0 58 0 1386.5 115.5 308 3696 0.00 8.50 8.50 Move rig to north side
13 w 10-May-07 0 1268.25 0 60.25 0 58 0 1386.5 106.7 308 4004 C8 0.00 1.50 0.50 2.50 4.00 8.50 Assist with C8 pour, Chisel rock for hydromill, clean endstop, setup at C11
14 w 11-May-07 0 1268.25 0 60.25 0 58 0 1386.5 99.0 308 4312 0.00 8.50 8.50 Finish service C11 guidewall pour, assist prepare hydromill for mobe to north
15 s 12-May-07 90 1358.25 0 60.25 0 58 90 1476.5 98.4 308 4620 C11 1.50 0.50 6.50 8.50 Continue on steel/rebar/concrete obstruction
16 w 14-May-07 0 1358.25 36 96.25 4 62 40 1516.5 94.8 308 4928 C11 6.25 1.25 0.50 0.50 8.50 Replace Chisel Cable,
17 w 15-May-07 136 1494.25 0 96.25 0 62 136 1652.5 97.2 308 5236 C11 1.25 0.25 0.25 1.25 5.50 8.50 switched to chisel, chiseling concrete invert slab
18 w 16-May-07 0 1494.25 76.5 172.75 0 62 76.5 1729 96.1 308 5544 C11 7.75 0.75 8.50 Digging Till
19 w 17-May-07 64.67 1558.92 0 172.75 8 70 72.67 1801.67 94.8 308 5852 C11 1.50 6.25 0.75 8.50 Clean out south bite
20 w 18-May-07 0 1558.92 0 172.75 24.25 94.25 24.25 1825.92 91.3 308 6160 C11 0.00 7.75 0.75 8.50 Chisel Rock
21 w 21-May-07 0 1558.92 0 172.75 0 94.25 0 1825.92 86.9 308 6468 C11 0.00 7.75 0.75 8.50 Desand C11
22 w 22-May-07 0 1558.92 0 172.75 0 94.25 0 1825.92 83.0 308 6776 - 0.00 9.50 9.50 Assist Pour C11, excavate trench for bentonite overflow, move equip
23 w 23-May-07 0 1558.92 0 172.75 0 94.25 0 1825.92 79.4 308 7084 LE4/ LE5 0.00 5.50 1.00 2.00 8.50 Extra work exc. LE4/LE5, bentonite leak at 12.5', service move mats
24 w 24-May-07 0 1558.92 0 172.75 0 94.25 0 1825.92 76.1 308 7392 LE4/ LE5 0.00 8.50 8.50 Setup derrick mini-separation plant w/ compressor
25 w 14-Aug-07 166.5 1725.42 0 172.75 0 94.25 166.5 1992.42 79.7 308 7700 C35 3.50 0.75 0.25 0.5 5.00 Clean out south bite
26 w 15-Aug-07 0 1725.42 0 172.75 0 94.25 0 1992.42 76.6 308 8008 C35 0.00 0.5 8.00 8.50 Unable to chisel due to insufficient demo
27 w 16-Aug-07 0 1725.42 0 172.75 0 94.25 0 1992.42 73.8 308 8316 C35 0.00 0.50 8.00 8.50 Rig down waiting for cooling fan
28 w 17-Aug-07 0 1725.42 0 172.75 0 94.25 0 1992.42 71.2 308 8624 - 0.00 0.50 8.00 8.50 Rig down waiting for cooling fan
29 s 18-Aug-07 0 1725.42 0 172.75 0 94.25 0 1992.42 68.7 308 8932 - 0.00 0.50 8.00 8.50 Rig down waiting for cooling fan
30 w 20-Aug-07 0 1725.42 0 172.75 0 94.25 0 1992.42 66.4 308 9240 C37/ C35 0.00 4.50 0.50 0.50 3.00 8.50 Chiseling at endstops, chiseling stone in C35 north bite
31 w 21-Aug-07 0 1725.42 0 172.75 0 94.25 0 1992.42 64.3 308 9548 C37/ C35 1.00 0.50 7.00 8.50 chisel concrete invert obstn
32 w 22-Aug-07 0 1725.42 0 172.75 0 94.25 0 1992.42 62.3 308 9856 C37/ C35 0.00 7.50 7.50 service pour and replace motor on hydromill
33 w 308 10164
34 w 308 10472
35 w 308 10780
36 w 308 11088
37 w 308 11396
38 w 308 11704
39 w 308 12012
40 w 308 12320
41 w 308 12628
42 w 308 12936
43 w 308 13244
44 s 308 13552
45 w 308 13860
46 w 308 14168
47 w 308 14476
48 w 308 14784
49 w 308 15092
50 w 308 15400
51 w 308 15708
52 w 308 16016
53 w 308 16324
54 w 308 16632
55 w 308 16940
56 w 308 17248
57 w 308 17556
58 w 308 17864
59 w 308 18172
60 w 308 18480
61 w 308 18788
62 w 308 19096
63 w 308 19404
64 w 308 19712
65 w 308 20020
66 w 308 20328
67 w 308 20636
68 w 308 20944
69 w 308 21252
70 s 308 21560
71 w 308 21868
72 w 308 22176
73 w 308 22484
74 308 22792
75 308 23100
76 308 23408
77 308 23716
78 308 24024
79 308 24332
80 308 24640
81 308 24948
82 308 25256
83 308 25564
84 308 25872
85 308 26180
86 308 26488
87 308 26796
88 308 27104
89 308 27412
90 308 27720
91 308 28028
92 308 28336
93 308 28644

insert rows above here to add data


62.25 0.00 54.25 16.00 5.50 0.00 59.75 3.25 24.00 22.00 21.50 268.50
w =workday 69 23.2% 0.0% 20.2% 6.0% 2.0% 0.0% 22.3% 1.2% 8.9% 8.2% 8.0%
s =saturday/ sunday 4

File: 593040949.xls Date: 05/19/2022


Page 19 of 35
Tab: Digging Rig (night Shift) Time: 22:36:44
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

r =rain outs 0
Total scheduled shifts 73

File: 593040949.xls Date: 05/19/2022


Page 20 of 35
Tab: Digging Rig (night Shift) Time: 22:36:45
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Digging Rig (Night Shift)
Joe
MANHOUR FACTORS
Production w/ no DT Production w/ KT DT Production overall BUDGET Chiseling Bedrock OVERBURDEN TILL COMBINED
Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive Productive cumm Prod Prod Ave Prod mh/sf mh/sf mh/sf
Shift type date rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours rig hours sf/hr sf/hr budget curr to date budget curr to date budget curr to date

0
1 w 24-Apr-07 7.75 7.75 31.0 31.0 8.50 8.50 28.2 28.2 8.50 8.50 28.2 28.2 30.80 0.00 0.00 0.082 0.00 0.00 0.126 0.00 #DIV/0! 0.000 0.00 0.00
2 w 25-Apr-07 8.00 15.75 16.0 23.4 8.50 17.00 15.1 21.6 8.50 17.00 15.1 21.6 30.80 4.50 4.50 0.0 0.00 0.082 0.00 0.00 0.126 0.00 #DIV/0! 0.000 0.00 0.00
3 w 26-Apr-07 7.50 23.25 2.1 16.5 8.50 25.50 1.9 15.1 8.50 25.50 1.9 15.1 30.80 7.50 12.00 2.1 0.00 0.082 0.00 0.00 0.126 0.00 #DIV/0! 0.000 0.00 0.00
4 w 27-Apr-07 7.50 30.75 1.6 12.9 8.50 34.00 1.4 11.6 8.50 34.00 1.4 11.6 30.80 7.50 19.50 3.7 0.00 0.082 0.00 0.00 0.126 0.00 #DIV/0! 0.000 0.00 0.00
5 w 30-Apr-07 4.25 35.00 55.0 18.0 8.50 42.50 27.5 14.8 8.50 42.50 27.5 14.8 30.80 0.00 19.50 0.082 0.00 0.00 0.126 0.00 #DIV/0! 0.000 0.00 0.00
6 w 1-May-07 5.75 40.75 48.8 22.3 6.50 49.00 43.2 18.6 8.50 51.00 33.0 17.8 30.80 0.00 19.50 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
7 w 2-May-07 8.00 48.75 14.5 21.1 8.50 57.50 13.7 17.9 8.50 59.50 13.7 17.3 30.80 0.00 19.50 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
8 w 3-May-07 7.75 56.50 41.6 23.9 8.50 66.00 37.9 20.4 8.50 68.00 37.9 19.8 30.80 0.00 19.50 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
9 w 4-May-07 5.75 62.25 2.6 21.9 8.50 74.50 1.8 18.3 8.50 76.50 1.8 17.8 30.80 5.25 24.75 6.8 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
10 w 7-May-07 7.25 69.50 3.1 19.9 8.50 83.00 2.6 16.7 8.50 85.00 2.6 16.3 30.80 7.25 32.00 8.0 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
11 w 8-May-07 7.25 76.75 0.0 18.1 8.50 91.50 0.0 15.2 8.50 93.50 0.0 14.8 30.80 5.25 37.25 11.0 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
12 w 9-May-07 0.00 76.75 0.0 18.1 8.50 100.00 0.0 13.9 8.50 102.00 0.0 13.6 30.80 0.00 37.25 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
13 w 10-May-07 1.50 78.25 0.0 17.7 8.50 108.50 0.0 12.8 8.50 110.50 0.0 12.5 30.80 1.50 38.75 38.7 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
14 w 11-May-07 0.00 78.25 0.0 17.7 8.50 117.00 0.0 11.9 8.50 119.00 0.0 11.7 30.80 0.00 38.75 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
15 s 12-May-07 1.50 79.75 60.0 18.5 2.00 119.00 45.0 12.4 8.50 127.50 10.6 11.6 30.80 0.00 38.75 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
16 w 14-May-07 7.50 87.25 5.3 17.4 8.50 127.50 4.7 11.9 8.50 136.00 4.7 11.2 30.80 1.25 40.00 49.6 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
17 w 15-May-07 1.50 88.75 90.7 18.6 3.00 130.50 45.3 12.7 8.50 144.50 16.0 11.4 30.80 0.25 40.25 248.0 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
18 w 16-May-07 7.75 96.50 9.9 17.9 8.50 139.00 9.0 12.4 8.50 153.00 9.0 11.3 30.80 0.00 40.25 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
19 w 17-May-07 7.75 104.25 9.4 17.3 8.50 147.50 8.5 12.2 8.50 161.50 8.5 11.2 30.80 6.25 46.50 11.2 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
20 w 18-May-07 7.75 112.00 3.1 16.3 8.50 156.00 2.9 11.7 8.50 170.00 2.9 10.7 30.80 7.75 54.25 12.2 0.00 0.082 0.00 0.00 0.126 0.00 0.00 0.000 0.00 0.00
21 w 21-May-07 0.00 112.00 0.0 16.3 8.50 164.50 0.0 11.1 8.50 178.50 0.0 10.2 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
22 w 22-May-07 0.00 112.00 0.0 16.3 9.50 174.00 0.0 10.5 9.50 188.00 0.0 9.7 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
23 w 23-May-07 0.00 112.00 0.0 16.3 5.50 179.50 0.0 10.2 8.50 196.50 0.0 9.3 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
24 w 24-May-07 0.00 112.00 0.0 16.3 0.00 179.50 0.0 10.2 8.50 205.00 0.0 8.9 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
25 w 14-Aug-07 3.50 115.50 47.6 17.3 5.00 184.50 33.3 10.8 5.00 210.00 33.3 9.5 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
26 w 15-Aug-07 0.00 115.50 0.0 17.3 0.50 185.00 0.0 10.8 8.50 218.50 0.0 9.1 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
27 w 16-Aug-07 0.00 115.50 0.0 17.3 8.50 193.50 0.0 10.3 8.50 227.00 0.0 8.8 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
28 w 17-Aug-07 0.00 115.50 0.0 17.3 8.50 202.00 0.0 9.9 8.50 235.50 0.0 8.5 30.80 0.00 54.25 0.082 0.00 0.126 0.00 0.00
29 s 18-Aug-07 0.00 115.50 0.0 17.3 8.50 210.50 0.0 9.5 8.50 244.00 0.0 8.2 30.80 0.00 54.25 0.082 0.126
30 w 20-Aug-07 0.00 115.50 0.0 17.3 5.50 216.00 0.0 9.2 8.50 252.50 0.0 7.9 30.80 0.00 54.25 0.082 0.126
31 w 21-Aug-07 1.00 116.50 0.0 17.1 1.50 217.50 0.0 9.2 8.50 261.00 0.0 7.6 30.80 0.00 54.25 0.082 0.126
32 w 22-Aug-07 0.00 116.50 0.0 17.1 7.50 225.00 0.0 8.9 7.50 268.50 0.0 7.4 30.80 0.00 54.25 0.082 0.126
33 w 30.80 0.082 0.126
34 w 30.80
35 w 30.80
36 w 30.80
37 w 30.80
38 w 30.80
39 w 30.80
40 w 30.80
41 w 30.80
42 w 30.80
43 w 30.80
44 s 30.80
45 w 30.80
46 w 30.80
47 w 30.80
48 w 30.80
49 w 30.80
50 w 30.80
51 w 30.80
52 w 30.80
53 w 30.80
54 w 30.80
55 w 30.80
56 w 30.80
57 w 30.80
58 w 30.80
59 w 30.80
60 w 30.80
61 w 30.80
62 w 30.80
63 w 30.80
64 w 30.80
65 w 30.80
66 w 30.80
67 w 30.80
68 w 30.80
69 w 30.80
70 s 30.80
71 w 30.80
72 w 30.80
73 w 30.80
74 30.80
75 30.80
76 30.80
77 30.80
78 30.80
79 30.80
80 30.80
81 30.80
82 30.80
83 30.80
84 30.80
85 30.80
86 30.80
87 30.80
88 30.80
89 30.80
90 30.80
91 30.80
92 30.80
93 30.80

insert rows above here to add data

w =workday
s =saturday/ sunday

File: 593040949.xls Date: 05/19/2022


Page 21 of 35
Tab: Digging Rig (night Shift) Time: 22:36:45
Kiewit / TreviIcos JV
East Bathtub Slurry Walls
WTC - East Bathtub Slurry Walls
Production Charts for Hydromill
Bartz

Till Qty Rock Qty ACTUAL AVG BUDGET PANEL EFFICIENCY


curr cumm curr cumm curr Mill #2 cumm Mill #2 cumm curr cumm Production NON PRODUCTIVE TOTAL
Total Shifts Mill #2 Shifts type date sf sf sf sf sf sf sf sf sf/day sf/day sf Prod Digging Chisel Rock Desand + JC Move Set/Up Teeth/Shanks IDLE Time Rig DT Plant DT Obstructions Delay (Others) (HOURS)

0 65
1 w 4-Jan-07 12 12 28.8 28.8 40.8 40.8 40.8 65 65 LE7 2.50 3.00 1.50 0.75 1.25 3.00 12.00 10.75 90%
2 w 5-Jan-07 0.0 12 0.0 28.8 0 40.8 20.4 65 130 LE7 0.00 9.50 1.00 10.50 10.50 100%
3 s 6-Jan-07 0.0 12 0.0 28.8 0 40.8 13.6 65 195 LE7 0.00 0.50 5.00 5.00 10.50 5.50 52%
4 w 8-Jan-07 28.0 40 40 68.8 68 108.8 27.2 65 260 LE7 2.50 1.50 7.50 11.50 11.50 100%
5 w 9-Jan-07 0.0 40 26.4 95.2 26.4 135.2 27.0 65 325 LE7 3.75 4.25 0.25 1.00 1.25 10.50 10.50 100%
6 w 10-Jan-07 37.5 77.5 48.63 143.8 86.13 221.3 36.9 65 390 LE7 6.50 5.50 0.50 12.50 12.00 96%
7 w 11-Jan-07 0.0 77.5 21 164.8 21 242.3 34.6 65 455 LE7 2.50 6.75 0.75 0.50 10.50 10.00 95%
8 w 12-Jan-07 0.0 77.5 0 164.8 0 242.3 30.3 65 520 STANDBY 0.00 0.50 9.00 9.50 9.50 100%
9 s 13-Jan-07 0.0 77.5 0 164.8 0 242.3 26.9 65 585 STANDBY 0.00 8.50 8.50 8.50 100%
10 w 15-Jan-07 0.0 77.5 44.24 209.1 44.24 286.6 28.7 65 650 LE3 6.50 2.25 1.25 0.50 1.00 11.50 11.50 100%
11 w 16-Jan-07 0.0 77.5 10.4 219.5 10.4 297.0 27.0 65 715 LE3 1.50 1.25 6.75 2.00 11.50 4.75 41%
12 w 17-Jan-07 0.0 77.5 0 219.5 0 297.0 24.7 65 780 STANDBY 0.00 0.50 8.00 8.50 8.50 100%
13 w 18-Jan-07 2.7 80.17 68.53 288.0 71.2 368.2 28.3 65 845 LE3 6.50 1.75 1.00 1.00 0.50 10.75 10.75 100%
14 w 19-Jan-07 0 80.17 54.4 342.4 54.4 422.6 30.2 65 910 LE3 5.50 5.75 1.00 1.75 1.00 15.00 13.25 88%
15 w 22-Jan-07 0 80.17 0 342.4 0 422.6 28.2 65 975 C3 0.75 1.00 0.50 0.50 0.25 0.50 5.75 2.25 11.50 11.00 96%
16 w 23-Jan-07 8 88.17 0 342.4 8 430.6 26.9 65 1040 C3 0.00 0.25 0.50 1.75 9.50 12.00 10.25 85%
17 w 24-Jan-07 27.6 115.77 0 342.4 27.6 458.2 27.0 65 1105 LE3 0.25 0.75 0.25 0.50 9.25 11.00 10.50 95%
18 w 25-Jan-07 94 209.77 0 342.4 94 552.2 30.7 65 1170 C3 6.00 1.25 0.50 3.75 11.50 11.00 96%
19 w 26-Jan-07 0 209.77 25.6 368.0 25.6 577.8 30.4 65 1235 C3 5.00 0.75 0.75 2.00 8.50 7.75 91%
20 s 27-Jan-07 0 209.77 7.7 375.7 7.7 585.5 29.3 65 1300 C3 4.00 0.25 0.50 2.00 0.50 1.25 8.50 6.50 76%
21 w 29-Jan-07 0 209.77 39.6 415.3 39.6 625.1 29.8 65 1365 C3 5.50 1.25 3.25 10.00 6.75 68%
22 w 30-Jan-07 0 209.77 33 448.3 33 658.1 29.9 65 1430 C3 6.00 0.25 0.25 2.75 1.25 10.50 7.75 74%
23 w 31-Jan-07 82.23 292 8.35 456.7 90.58 748.7 32.6 65 1495 C3 3.00 3.50 0.50 0.25 3.25 10.50 7.25 69%
24 w 1-Feb-07 0 292 21.06 477.7 21.06 769.7 32.1 65 1560 C3 2.50 7.50 0.50 10.50 10.50 100%
25 w 2-Feb-07 0 292 31.09 508.8 31.09 800.8 32.0 65 1625 C3 4.50 4.50 0.25 1.00 0.25 10.50 9.50 90%
26 w 5-Feb-07 30.8 322.8 10.48 519.3 41.28 842.1 32.4 65 1690 C3/ LE5 3.25 0.50 0.75 5.00 3.50 13.00 13.00 100%
27 w 6-Feb-07 44.17 366.97 36.68 556.0 80.85 922.9 34.2 65 1755 LE5 7.25 0.50 0.25 2.75 10.75 10.75 100%
28 w 7-Feb-07 0 366.97 18.46 574.4 18.46 941.4 33.6 65 1820 LE5 7.00 0.25 1.00 1.75 2.00 12.00 10.00 83%
29 w 8-Feb-07 0 366.97 0 574.4 0 941.4 32.5 65 1885 LE5 3.00 0.50 0.25 0.25 6.5 10.50 4.00 38%
30 w 9-Feb-07 0 366.97 8 582.4 8 949.4 31.6 65 1950 LE1 3.75 0.50 0.50 3.75 8.50 4.75 56%
31 w 12-Feb-07 0 366.97 24.3 606.7 24.3 973.7 31.4 65 2015 LE1 4.00 0.25 0.25 1.50 3.75 0.75 10.50 6.75 64%
32 w 13-Feb-07 33.6 400.57 25.95 632.7 59.55 1033.2 32.3 65 2080 LE1/ CL1 1.50 2.50 0.75 0.25 4.75 0.75 10.50 9.75 93%
33 w 14-Feb-07 38 438.57 72.8 705.5 110.8 1144.0 34.7 65 2145 CL1 5.25 1.00 0.25 0.25 0.50 1.75 9.00 8.50 94%
34 w 15-Feb-07 27 465.57 7.50 713.0 34.5 1178.5 34.7 65 2210 CL!/C10 4.75 1.25 2.75 1.25 10.00 7.25 73%
35 w 16-Feb-07 25.33 490.9 86.63 799.6 111.96 1290.5 36.9 65 2275 C10 5.75 1.5 0.25 3.00 10.50 10.50 100%
36 s 17-Feb-07 0 490.9 24.93 824.5 24.93 1315.4 36.5 65 2340 C10 6.50 2.00 8.50 6.50 76%
37 w 20-Feb-07 0 490.9 25.93 850.5 25.93 1341.4 36.3 65 2405 C10/ LE6 0.75 1.00 1.25 0.25 3.25 0.50 3.50 10.50 10.00 95%
38 w 21-Feb-07 0 490.9 26.93 877.4 26.93 1368.3 36.0 65 2470 CL1 1.00 2.00 0.25 0.25 4.75 0.25 8.50 8.25 97%

39 w 22-Feb-07 0 490.9 0 877.4 0 1368.3 35.1 65 2535 CL1 0.00 2.00 0.50 8.00 10.50 10.50 100%

40 w 23-Feb-07 0 490.9 0 877.4 0 1368.3 34.2 65 2600 CL1/LE6 0.00 1.50 0.50 0.50 8.00 10.50 10.50 100%
41 w 26-Feb-07 216 706.9 0 877.4 216 1584.3 38.6 65 2665 LE6 / C5 5.25 0.75 1.50 3.00 10.50 9.00 86%
42 w 27-Feb-07 0 706.9 77.4 954.8 77.4 1661.7 39.6 65 2730 LG1 4.50 0.75 2.25 1.00 2.00 10.50 8.50 81%
43 w 28-Feb-07 0 706.9 65.5 1020.3 65.5 1727.2 40.2 65 2795 LG1 4.75 0.50 0.50 0.25 0.50 2.00 8.50 6.50 76%
44 w 1-Mar-07 39.2 746.1 26.4 1046.7 65.6 1792.8 40.7 65 2860 LG1/ C5 5.75 1.00 0.50 1.00 2.25 10.50 8.25 79%
45 w 2-Mar-07 0 746.1 28.8 1075.5 28.8 1821.6 40.5 65 2925 C5 4.00 0.25 0.25 0.25 1.75 4.00 10.50 8.75 83%
46 w 5-Mar-07 0 746.1 74 1149.5 74 1895.6 41.2 65 2990 C5 6.00 0.25 0.75 2.00 9.00 7.00 78%
47 w 6-Mar-07 0 746.1 12 1161.5 12 1907.6 40.6 65 3055 C5 2.00 1.75 6.75 10.50 3.75 36%
48 w 7-Mar-07 0 746.1 91.2 1252.7 91.2 1998.8 41.6 65 3120 C5 7.25 0.50 1.25 1.00 2.00 12.00 10.00 83%
49 w 8-Mar-07 0 746.1 24 1276.7 24 2022.8 41.3 65 3185 C5 6.25 0.75 0.50 5.00 12.50 7.50 60%
50 w 9-Mar-07 224.7 970.8 20.5 1297.2 245.2 2268.0 45.4 65 3250 C5 7.25 0.75 4.00 12.00 8.00 67%
51 s 10-Mar-07 93.8 1064.6 22.75 1319.9 116.55 2384.5 46.8 65 3315 C5 7.75 0.75 3.50 12.00 8.50 71%
52 w 12-Mar-07 0 1064.6 0 1319.9 0 2384.5 45.9 65 3380 C5 0.00 2.50 0.25 5.75 8.50 2.75 32%
53 w 13-Mar-07 0 1064.6 0 1319.9 0 2384.5 45.0 65 3445 — 0.00 8.50 8.50 0.00 0%
54 w 14-Mar-07 0 1064.6 0 1319.9 0 2384.5 44.2 65 3510 — 0.00 8.50 8.50 0.00 0%
55 w 15-Mar-07 0 1064.6 0 1319.9 0 2384.5 43.4 65 3575 — 0.00 8.50 8.50 0.00 0%
56 w 16-Mar-07 0 1064.6 0 1319.9 0 2384.5 42.6 65 3640 — 0.00 8.50 8.50 0.00 0%
57 s 17-Mar-07 0 1064.6 0 1319.9 0 2384.5 41.8 65 3705 — 0.00 0.50 8.00 8.50 0.50 6%
58 w 19-Mar-07 0 1064.6 4 1323.9 4 2388.5 41.2 65 3770 LE2 1.50 1.00 0.50 9.00 12.00 3.00 25%
59 w 20-Mar-07 0 1064.6 40 1363.9 40 2428.5 41.2 65 3835 LE2 2.50 0.25 0.75 4.00 2.50 2.00 12.00 9.50 79%
60 w 21-Mar-07 0 1064.6 28.8 1392.7 28.8 2457.3 41.0 65 3900 LE2/LE6 4.25 1.50 0.75 0.75 2.75 10.00 10.00 100%
61 w 22-Mar-07 0 1064.6 74.4 1467.1 74.4 2531.7 41.5 65 3965 LE6 9.25 0.25 0.75 1.25 1.00 12.50 11.25 90%
62 w 23-Mar-07 0 1064.6 28.75 1495.9 28.75 2560.5 41.3 65 4030 LE6 2.50 0.50 0.25 5.25 8.50 3.25 38%
63 1 w 26-Mar-07 0 1064.6 3.5 1499.4 3.5 3.5 2564.0 3.5 40.7 65 4095 LE6 1.25 2.00 0.75 0.50 2.50 3.25 10.25 7.00 68%

64 2 w 27-Mar-07 132 1196.6 24 1523.4 156 159.5 2720.0 79.8 42.5 65 4160 CL4 4.25 3.00 1.00 0.50 1.75 10.50 8.75 83%
65 3 w 28-Mar-07 101.28 1297.88 14.4 1537.8 115.68 275.18 2835.7 91.7 43.6 65 4225 CL4 4.00 0.75 1.25 0.50 1.00 3.00 10.50 9.50 90%

66 4 w 29-Mar-07 0 1297.88 50.4 1588.2 50.4 325.58 2886.1 81.4 43.7 65 4290 C7/ CL4 4.00 2.00 2.00 1.50 1.00 10.50 9.00 86%
67 5 w 30-Mar-07 0 1297.88 0 1588.2 0 325.58 2886.1 65.1 43.1 65 4355 CL4 0.00 0.50 8.00 8.50 8.50 100%
68 6 w 2-Apr-07 84.15 1382.03 29.2 1617.4 113.35 438.93 2999.4 73.2 44.1 65 4420 CL4 8.00 0.75 0.50 0.50 1.25 11.00 11.00 100%
69 7 w 3-Apr-07 0 1382.03 7.65 1625.0 7.65 446.58 3007.1 63.8 43.6 65 4485 CL4 0.75 1.25 0.50 6.00 8.50 8.50 100%

70 8 w 4-Apr-07 0 1382.03 5.6 1630.6 5.6 452.18 3012.7 56.5 43.0 65 4550 LE4 1.00 0.50 0.50 2.50 6.00 10.50 10.50 100%
71 9 w 5-Apr-07 0 1382.03 56.8 1687.4 56.8 508.98 3069.5 56.6 43.2 65 4615 LE4 7.75 0.75 1.00 1.75 0.75 12.00 12.00 100%

72 10 w 6-Apr-07 21 1403.03 18 1705.4 39 547.98 3108.5 54.8 43.2 65 4680 LE4 2.50 2.50 0.50 0.75 0.25 1.00 7.50 7.25 97%
73 11 w 9-Apr-07 0 1403.03 17.2 1722.6 17.2 565.18 3125.7 51.4 42.8 65 4745 LE4 2.25 0.25 1.25 0.25 4.50 8.50 8.50 100%
74 12 w 10-Apr-07 83.2 1486.23 0 1722.6 83.2 648.38 3208.9 54.0 43.4 65 4810 LE4/ C4 3.00 1.00 1.25 1.00 1.75 1.50 1.00 10.50 9.00 86%
75 13 w 11-Apr-07 120.8 1607.03 0 1722.6 120.8 769.18 3329.7 59.2 44.4 65 4875 C4 5.00 0.25 0.75 4.00 1.00 11.00 11.00 100%
76 14 w 12-Apr-07 210 1817.03 16.4 1739.0 226.4 995.58 3556.1 71.1 46.8 65 4940 C4 8.25 0.50 1.00 0.25 10.00 10.00 100%
77 15 w 13-Apr-07 1.1 1818.13 46.9 1785.9 48 1043.58 3604.1 69.6 46.8 65 5005 C4 8.00 0.50 0.25 1.00 0.75 10.50 9.75 93%
78 16 w 16-Apr-07 225 2043.13 45.7 1831.6 270.7 1314.28 3874.8 82.1 49.7 65 5070 C4 10.00 1.25 0.25 0.50 12.00 12.00 100%
79 17 w 17-Apr-07 0 2043.13 21.2 1852.8 21.2 1335.48 3896.0 78.6 49.3 65 5135 C4 3.75 2.75 0.75 0.50 2.00 0.75 10.50 10.50 100%
80 18 w 18-Apr-07 0 2043.13 0 1852.8 0 1335.48 3896.0 74.2 48.7 65 5200 C4 0.00 1.00 0.25 0.25 1.00 8.00 10.50 2.50 24%
81 19 w 19-Apr-07 0 2043.13 20 1872.8 20 1355.48 3916.0 71.3 48.3 65 5265 C9 2.50 1.50 0.50 6.00 10.50 4.50 43%
82 20 w 20-Apr-07 37.6 2080.73 29.35 1902.2 66.95 1422.43 3982.9 71.1 48.6 65 5330 C9/ CL2 4.25 2.50 1.50 0.50 1.75 10.50 8.75 83%
83 21 s 21-Apr-07 0 2080.73 61.6 1963.8 61.6 1484.03 4044.5 70.7 48.7 65 5395 CL2 4.75 0.50 0.50 2.00 0.75 8.50 8.50 100%
84 22 w 23-Apr-07 58.1 2138.83 53.2 2017.0 111.3 1595.33 4155.8 72.5 49.5 65 5460 CL2 7.00 0.50 0.50 2.25 0.25 10.50 10.25 98%
85 23 w 24-Apr-07 14.25 2153.08 55.03 2072.0 69.28 1664.61 4225.1 72.4 49.7 65 5525 CL2/ C1 5.50 1.25 2.50 0.25 0.75 0.25 10.50 10.25 98%
File: 593040949.xls Page 22 of 35 Date: 05/19/2022
Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
86 24 w 25-Apr-07 0 2153.08 53.6 2125.6 53.6 1718.21 4278.7 71.6 49.8 65 5590 CL2/ C1 East Bathtub Slurry Walls
6.75 2.25 1.25 0.75 0.50 11.50 11.00 96%
87 25 w 26-Apr-07 48 2201.08 40 2165.6 88 1806.21 4366.7 72.2 50.2 65 5655 C6 6.25 0.25 2.50 0.75 0.75 10.50 9.75 93%
88 26 w 27-Apr-07 68 2269.08 60 2225.6 128 1934.21 4494.7 74.4 51.1 65 5720 C6 5.75 1.00 2.75 0.75 0.25 10.50 10.25 98%
89 27 s 28-Apr-07 0 2269.08 28.8 2254.4 28.8 1963.01 4523.5 72.7 50.8 65 5785 C6 3.25 0.25 5.00 8.50 3.50 41%
90 28 w 30-Apr-07 59 2328.08 22.5 2276.9 81.5 2044.51 4605.0 73.0 51.2 65 5850 C6 4.50 0.50 0.50 0.25 4.75 10.50 5.75 55%
91 29 w 1-May-07 0 2328.08 18.4 2295.3 18.4 2062.91 4623.4 71.1 50.8 65 5915 C6/LE8/ LG4 1.25 3.75 2.75 0.50 1.50 0.75 10.50 9.75 93%
92 30 w 2-May-07 0 2328.08 28 2323.3 28 2090.91 4651.4 69.7 50.6 65 5980 LG4/ LE8 5.75 2.50 1.00 1.50 0.75 11.50 10.75 93%
93 31 w 3-May-07 10.5 2338.58 21.9 2345.2 32.4 2123.31 4683.8 68.5 50.4 65 6045 LE8 2.00 1.25 0.75 0.25 3.50 0.50 0.25 8.50 8.00 94%
94 32 w 4-May-07 0 2338.58 64 2409.2 64 2187.31 4747.8 68.4 50.5 65 6110 LE8/ CL3 5.50 1.50 1.25 0.50 1.75 10.50 8.75 83%
95 33 s 5-May-07 56 2394.58 51.2 2460.4 107.2 2294.51 4855.0 69.5 51.1 65 6175 CL3 3.75 0.75 4.00 8.50 4.50 53%
96 34 w 7-May-07 75 2469.58 59.21 2519.6 134.21 2428.72 4989.2 71.4 52.0 65 6240 CL3 4.50 0.25 0.25 3.00 0.50 8.50 8.50 100%
97 35 w 8-May-07 8 2477.58 24 2543.6 32 2460.72 5021.2 70.3 51.8 65 6305 CL3/ C8 3.75 2.00 3.00 1.75 10.50 10.50 100%
98 36 w 9-May-07 33.6 2511.18 78.8 2622.4 112.4 2573.12 5133.6 71.5 52.4 65 6370 C8 4.50 0.25 0.50 2.75 0.50 8.50 8.50 100%
99 37 w 10-May-07 0 2511.18 16.8 2639.2 16.8 2589.92 5150.4 70.0 52.0 65 6435 C8/ LG3 3.25 3.50 1.75 8.50 8.50 100%
100 38 w 11-May-07 0 2511.18 12.2 2651.4 12.2 2602.12 5162.6 68.5 51.6 65 6500 LG3 2.00 2.25 1.00 5.25 10.50 10.50 100%
106 38 s 19-May-07 53.1 2564.28 157.5 2808.9 210.6 2812.72 5373.2 74.0 50.7 65 6565 VE3 5.50 0.25 0.25 2.50 8.50 6.00 71%
107 39 w 21-May-07 34.13 2598.41 57.8 2866.7 91.93 2904.65 5465.1 74.5 51.1 65 6630 VE3 3.25 1.50 1.25 0.25 4.25 10.50 6.25 60%
108 40 w 22-May-07 0 2598.41 88.2 2954.9 88.2 2992.85 5553.3 74.8 51.4 65 6695 VE9 8.50 1.00 1.00 10.50 9.50 90%
109 41 w 23-May-07 0 2598.41 100.8 3055.7 100.8 3093.65 5654.1 75.5 51.9 65 6760 VE9 5.00 0.75 0.50 0.75 4.50 11.50 7.00 61%
110 42 w 24-May-07 0 2598.41 0 3055.7 0 3093.65 5654.1 73.7 51.4 65 6825 VE3 0.00 1.25 1.00 1.00 5.25 8.50 8.50 100%
111 43 w 25-May-07 81 2679.41 81 3136.7 162 3255.65 5816.1 75.7 52.4 65 6890 VE9 3.25 0.75 0.75 1.25 6.00 4.75 79%
112 44 w 29-May-07 0 2679.41 0 3136.7 0 3255.65 5816.1 74.0 51.9 65 6955 - 0.00 0.50 8.00 8.50 8.50 100%
113 45 w 30-May-07 0 2679.41 0 3136.7 0 3255.65 5816.1 72.3 51.5 65 7020 VE9 0.00 2.00 0.50 0.50 7.50 10.50 3.00 29%
114 46 w 31-May-07 0 2679.41 54 3190.7 54 3309.65 5870.1 71.9 51.5 65 7085 VE13 4.50 1.75 1.25 3.00 10.50 7.50 71%
115 47 w 1-Jun-07 0 2679.41 69.3 3260.0 69.3 3378.95 5939.4 71.9 51.6 65 7150 VE13 6.25 0.50 0.50 3.25 10.50 7.25 69%
116 48 s 2-Jun-07 14.67 2694.08 58.33 3318.4 73 3451.95 6012.4 71.9 51.8 65 7215 VE13 4.25 0.25 0.25 3.75 8.50 8.50 100%
117 49 w 4-Jun-07 11.25 2705.33 69.75 3388.1 81 3532.95 6093.4 72.1 52.1 65 7280 VE13/ VE6 3.50 2.00 1.75 0.25 0.50 2.50 10.50 10.50 100%
118 50 w 5-Jun-07 26.67 2732 69.3 3457.4 95.97 3628.92 6189.4 72.6 52.5 65 7345 VE6 3.50 0.25 2.5 1.00 1.25 8.50 7.50 88%
119 51 w 6-Jun-07 6.75 2738.75 20.25 3477.7 27 3655.92 6216.4 71.7 52.2 65 7410 VE6/VE10 2.75 2.50 1.00 3.75 0.50 10.50 10.00 95%
120 52 w 7-Jun-07 50.5 2789.25 100.75 3578.4 151.25 3807.17 6367.7 73.2 53.1 65 7475 VE10 7.00 0.50 0.50 0.25 1.25 1.00 10.50 9.50 90%
121 53 w 8-Jun-07 13.5 2802.75 71.1 3649.5 84.6 3891.77 6452.3 73.4 53.3 65 7540 VE10/VE14 5.00 2.00 4.00 0.25 0.75 12.00 12.00 100%
122 54 s 9-Jun-07 38.25 2841 45.9 3695.4 84.15 3975.92 6536.4 73.6 53.6 65 7605 VE14 4.00 3.00 1.50 8.50 5.50 65%
123 55 w 11-Jun-07 26.58 2867.58 35.77 3731.2 62.35 4038.27 6598.8 73.4 53.6 65 7670 VE14 1.25 10.75 12.00 12.00 100%
124 56 w 12-Jun-07 41.06 2908.64 165.69 3896.9 206.75 4245.02 6805.5 75.8 54.9 65 7735 VE14/ VE4 5.75 1.50 1.50 0.25 0.50 1.00 10.50 10.00 95%
125 57 w 13-Jun-07 37.46 2946.1 97.34 3994.2 134.8 4379.82 6940.3 76.8 55.5 65 7800 VE4 2.75 0.50 1.00 2.25 2.00 8.50 6.50 76%
126 58 w 14-Jun-07 76.5 3022.6 15.3 4009.5 91.8 4471.62 7032.1 77.1 55.8 65 7865 VE4/VE11 4.00 1.50 1.00 5.5 12.00 12.00 100%
127 59 w 15-Jun-07 70.17 3092.77 107.95 4117.5 178.12 4649.74 7210.2 78.8 56.8 65 7930 VE11 8.25 0.50 0.25 9.00 9.00 100%
128 60 w 18-Jun-07 145.7 3238.47 55.25 4172.7 200.95 4850.69 7411.2 80.8 57.9 65 7995 VE11/ VE7 4.50 1.50 1.25 0.25 2.75 0.25 1.00 11.50 11.25 98%
129 61 w 19-Jun-07 136.63 3375.1 66.83 4239.5 203.46 5054.15 7614.6 82.9 59.0 65 8060 VE7 8.75 0.25 1.50 1.00 0.25 0.25 12.00 11.75 98%
130 62 w 20-Jun-07 0 3375.1 25.5 4265.0 25.5 5079.65 7640.1 81.9 58.8 65 8125 VE7/ VE15 2.50 1.50 2.00 1.00 3.00 2.00 12.00 10.00 83%
131 63 w 21-Jun-07 151.33 3526.43 132.3 4397.3 283.63 5363.28 7923.8 85.1 60.5 65 8190 VE15 9.25 1.00 1.25 0.25 0.25 12.00 11.75 98%
132 64 w 22-Jun-07 46.75 3573.18 61.2 4458.5 107.95 5471.23 8031.7 85.5 60.8 65 8255 VE15/ VE5 5.00 1.50 1.75 0.25 1.50 1.50 11.50 10.00 87%

133 65 s 23-Jun-07 0 3573.18 0 4458.5 0 5471.23 8031.7 84.2 60.4 65 8320 VE5 0.00 2.00 1.00 1.50 4.00 8.50 4.50 53%
134 66 w 25-Jun-07 47.17 3620.35 100.58 4559.1 147.75 5618.98 8179.5 85.1 61.0 65 8385 VE5 4.25 0.50 0.25 5.00 1.00 11.00 10.00 91%
135 67 w 26-Jun-07 26.62 3646.97 49.88 4609.0 76.5 5695.48 8256.0 85.0 61.2 65 8450 VE5/ VE12 5.75 2.25 1.25 0.25 1.75 0.25 11.50 11.25 98%
136 68 w 27-Jun-07 8.67 3655.64 64.63 4673.6 73.3 5768.78 8329.3 84.8 61.2 65 8515 VE12 4.75 0.25 2.50 1.00 8.50 7.50 88%
137 69 w 28-Jun-07 0 3655.64 0 4673.6 0 5768.78 8329.3 83.6 60.8 65 8580 - 0.00 8.00 8.00 8.00 100%
138 70 w 29-Jun-07 58.5 3714.14 45 4718.6 103.5 5872.28 8432.8 83.9 61.1 65 8645 VE12/ VE16 6.50 1.50 2.00 0.50 0.50 0.50 0.50 12.00 11.50 96%
139 71 s 30-Jun-07 0 3714.14 0 4718.6 0 5872.28 8432.8 82.7 60.7 65 8710 - 0.00 0.50 8.00 8.50 0.50 6%
140 72 w 2-Jul-07 81.21 3795.35 72.13 4790.8 153.34 6025.62 8586.1 83.7 61.3 65 8775 VE16 9.25 1.00 0.25 10.50 10.50 100%

141 73 w 3-Jul-07 69.28 3864.63 9.77 4800.5 79.05 6104.67 8665.2 83.6 61.5 65 8840 VE16/VE8 4.50 1.75 2.00 1.00 1.00 1.25 11.50 10.25 89%
142 74 w 5-Jul-07 176.11 4040.74 73.12 4873.7 249.23 6353.9 8914.4 85.9 62.8 65 8905 VE8/VE16 8.00 1.00 0.50 0.50 0.50 10.50 10.00 95%
143 75 w 6-Jul-07 0 4040.74 48.03 4921.7 48.03 6401.93 8962.4 85.4 62.7 65 8970 VE16/VE8 3.25 1.50 1.75 0.25 2.75 9.50 9.50 100%

144 76 w 9-Jul-07 0 4040.74 45 4966.7 45 6446.93 9007.4 84.8 62.6 65 9035 VE8/C39 4.00 4.00 1.00 0.50 0.50 10.00 9.50 95%
145 77 w 10-Jul-07 4.5 4045.24 67.5 5034.2 72 6518.93 9079.4 84.7 62.6 65 9100 C39N/C39S 5.75 1.00 0.50 1.00 1.00 1.00 0.25 10.50 9.50 90%
146 78 w 11-Jul-07 15 4060.24 27 5061.2 42 6560.93 9121.4 84.1 62.5 65 9165 C39/ VE2 1.75 1.00 1.75 1.00 5.00 10.50 5.50 52%
147 79 w 12-Jul-07 82.75 4142.99 34.85 5096.0 117.6 6678.53 9239.0 84.5 62.9 65 9230 VE2 4.00 3.00 0.25 1.25 2.00 0.50 11.00 10.50 95%
148 80 w 13-Jul-07 36 4178.99 54 5150.0 90 6768.53 9329.0 84.6 63.0 65 9295 VE2 3.25 5.25 0.50 1.00 0.50 10.50 10.00 95%
149 81 w 14-Jul-07 24.8 4203.79 56.36 5206.4 81.16 6849.69 9410.2 84.6 63.6 65 9360 VE2 2.75 0.50 0.50 0.75 2.00 2.00 8.50 8.50 100%
150 82 w 16-Jul-07 4 4207.79 0 5206.4 4 6853.69 9414.2 83.6 63.2 65 9425 VE2 4.50 1.25 0.50 5.75 12.00 12.00 100%
151 83 w 17-Jul-07 193.5 4401.29 11.7 5218.1 205.2 7058.89 9619.4 85.0 64.1 65 9490 VE2/VC1 5.75 2.00 1.75 0.50 0.50 0.50 11.00 10.50 95%
152 84 w 18-Jul-07 0 4401.29 51.3 5269.4 51.3 7110.19 9670.7 84.6 64.0 65 9555 VC1 7.25 0.25 1.00 1.75 0.25 10.50 8.75 83%
153 85 w 19-Jul-07 51.45 4452.74 100.9 5370.3 152.35 7262.54 9823.0 85.4 64.6 65 9620 VC1 8.50 0.75 1.25 2.25 1.25 14.00 14.00 100%
154 86 w 20-Jul-07 67.5 4520.24 27.9 5398.2 95.4 7357.94 9918.4 85.6 64.8 65 9685 VC1/C36S 4.50 3.50 1.50 0.50 0.50 10.50 10.50 100%
155 87 s 21-Jul-07 76.5 4596.74 57.6 5455.8 134.1 7492.04 10052.5 86.1 65.3 65 9750 C36S 6.50 1.00 1.00 8.50 8.50 100%
156 88 w 23-Jul-07 35.87 4632.61 53.38 5509.2 89.25 7581.29 10141.8 86.2 65.4 65 9815 C36S 6.00 0.50 0.50 0.50 0.50 0.25 0.25 8.50 8.25 97%

157 89 w 24-Jul-07 0 4632.61 0 5509.2 0 7581.29 10141.8 85.2 65.0 65 9880 VE1 0.00 4.00 1.00 2.50 3.00 10.50 10.50 100%
158 90 w 25-Jul-07 69 4701.61 15.75 5524.9 84.75 7666.04 10226.5 85.2 65.1 65 9945 VE1 7.50 1.00 3.00 11.50 8.50 74%
159 91 w 26-Jul-07 124.7 4826.31 39.6 5564.5 164.3 7830.34 10390.8 86.0 65.8 65 10010 VE1 6.25 1.50 6.25 0.25 14.25 14.25 100%
160 92 w 27-Jul-07 0 4826.31 37.76 5602.3 37.76 7868.1 10428.6 85.5 65.6 65 10075 VE1 2.00 1.50 1.00 1.00 5.50 11.00 5.50 50%
161 93 s 28-Jul-07 177.9 5004.21 25.2 5627.5 203.1 8071.2 10631.7 86.8 66.4 65 10140 C41 5.00 0.50 0.50 0.50 4.00 10.50 6.50 62%
162 94 w 30-Jul-07 82.43 5086.64 107.22 5734.7 189.65 8260.85 10821.3 87.9 67.2 65 10205 C41 12.50 0.5 0.75 1.50 0.25 15.50 15.50 100%
163 95 w 31-Jul-07 63 5149.64 44.1 5778.8 107.1 8367.95 10928.4 88.1 67.5 65 10270 C41/C36N 5.50 0.75 1.50 1.00 2.25 0.50 11.50 11.00 96%
164 96 w 1-Aug-07 45.05 5194.69 16.2 5795.0 61.25 8429.2 10989.7 87.8 67.4 65 10335 C36N 5.50 0.75 0.50 4.25 0.25 0.25 11.50 7.25 63%
165 97 w 2-Aug-07 74.65 5269.34 69.25 5864.3 143.9 8573.1 11133.6 88.4 67.9 65 10400 C36N 7.75 1.25 3.00 12.00 12.00 100%
166 98 w 3-Aug-07 37.28 5306.62 44.65 5908.9 81.93 8655.03 11215.5 88.3 68.0 65 10465 C36N 3.00 2.50 1.25 0.75 1.00 2.00 10.50 8.50 81%
167 99 s 4-Aug-07 55.25 5361.87 22.95 5931.9 78.2 8733.23 11293.7 88.2 68.0 65 10530 VE17 3.75 0.50 0.25 0.50 1.50 2.00 8.50 8.00 94%
168 100 w 6-Aug-07 0 5361.87 62.9 5994.8 62.9 8796.13 11356.6 88.0 68.0 65 10595 VE17 5.50 1.75 1.50 3.25 12.00 12.00 100%
169 101 w 7-Aug-07 25.98 5387.85 18.81 6013.6 44.79 8840.92 11401.4 87.5 67.9 65 10660 VE17/C38 1.00 3.50 2.00 5.00 11.50 6.50 57%
170 102 w 8-Aug-07 93.88 5481.73 46.38 6059.9 140.26 8981.18 11541.7 88.1 68.3 65 10725 C38 5.75 1.50 1.00 0.50 2.75 11.50 8.75 76%
171 103 w 9-Aug-07 21.87 5503.6 52.18 6112.1 74.05 9055.23 11615.7 87.9 68.3 65 10790 C38 6.25 1.00 0.75 0.50 8.50 8.00 94%
172 104 w 10-Aug-07 17 5520.6 0 6112.1 17 9072.23 11632.7 87.2 68.0 65 10855 C40 1.75 2.50 1.25 0.50 5.00 0.50 11.50 11.00 96%
173 105 s 11-Aug-07 55.25 5575.85 59.5 6171.6 114.75 9186.98 11747.5 87.5 68.3 65 10920 C40 7.00 0.25 0.75 0.50 8.50 8.00 94%
174 106 w 13-Aug-07 12.75 5588.6 51.85 6223.5 64.6 9251.58 11812.1 87.3 68.3 65 10985 C40 5.25 0.50 1.00 4.25 0.50 11.50 11.50 100%
175 107 w 14-Aug-07 30 5618.6 70.15 6293.6 100.15 9351.73 11912.2 87.4 68.5 65 11050 C40 4.25 1.25 1.50 0.50 1.00 8.50 7.50 88%
176 108 w 15-Aug-07 0 5618.6 0 6293.6 0 9351.73 11912.2 86.6 68.1 65 11115 C35 0.00 0.50 8.00 8.50 8.50 100%
177 109 w 16-Aug-07 0 5618.6 0 6293.6 0 9351.73 11912.2 85.8 67.7 65 11180 C35 0.00 8.00 4.00 12.00 12.00 100%
178 110 w 17-Aug-07 51 5669.6 34 6327.6 85 9436.73 11997.2 85.8 67.8 65 11245 C37 5.75 2.00 1.00 2.25 1.00 12.00 12.00 100%
179 111 s 18-Aug-07 68 5737.6 17 6344.6 85 9521.73 12082.2 85.8 67.9 65 11310 C37 6.75 1.00 4.25 12.00 7.75 65%
180 112 w 20-Aug-07 21.75 5759.35 4.25 6348.9 26 9547.73 12108.2 85.2 67.6 65 11375 C37 3.00 0.5 0.5 4.25 2.25 10.50 8.25 79%
181 113 w 21-Aug-07 0 5759.35 57.5 6406.4 57.5 9605.23 12165.7 85.0 67.6 65 11440 C37 5.00 1.00 1.00 2.50 9.50 9.50 100%
182 114 w 22-Aug-07 0 5759.35 16.5 6422.9 16.5 9621.73 12182.2 84.4 67.3 65 11505 C37/ C35 3.00 2.00 2.00 5.00 12.00 12.00 100%
183 115 w 23-Aug-07 72 5831.35 40.5 6463.4 112.5 9734.23 12294.7 84.6 67.6 65 11570 C35 11.00 0.50 3.00 2.50 17.00 17.00 100%
184 116 w 24-Aug-07 54 5885.35 54 6517.4 108 9842.23 12402.7 84.8 67.8 65 11635 C35 10.50 0.50 1.25 2.25 14.50 12.25 84%
185 117 s 25-Aug-07 0 5885.35 31.25 6548.6 31.25 9873.48 12434.0 84.4 67.6 65 11700 C35 2.25 0.50 0.50 5.25 8.50 8.50 100%
186 118 w 27-Aug-07 0 5885.35 0 6548.6 0 9873.48 12434.0 83.7 67.2 65 11765 - 0.00 0.50 8.00 8.50 8.50 100%
187 119 w 28-Aug-07 0 5885.35 0 6548.6 0 9873.48 12434.0 83.0 66.8 65 11830 - 0.00 0.50 8.00 8.50 8.50 100%

File: 593040949.xls Page 23 of 35 Date: 05/19/2022


Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
188 120 w 29-Aug-07 0 5885.35 0 6548.6 0 9873.48 12434.0 82.3 66.5 65 11895 C34 East Bathtub Slurry Walls
0.00 1.75 1.00 6.25 2.50 2.25 13.75 13.75 100%
189 121 w 30-Aug-07 0 5885.35 63 6611.6 63 9936.48 12497.0 82.1 66.5 65 11960 C34 4.50 0.5 7.25 12.25 12.25 100%
190 122 w 31-Aug-07 108 5993.35 54 6665.6 162 10098.48 12659.0 82.8 67.0 65 12025 C34 5.25 1.50 1.00 0.50 3.25 0.50 12.00 11.50 96%
191 65 12090
192 65 12155
193 65 12220

insert rows above here to add data


751.75 38.75 135.25 130.00 97.50 209.00 303.75 77.00 59.75 128.75 1931.50
w =workday 165 38.9% 2.0% 7.0% 6.7% 5.0% 10.8% 15.7% 4.0% 3.1% 6.7%
s =saturday/ sunday 20
r =rain outs 0
Total scheduled shifts 185

work shifts 185


shifts >8hr Prod 134
shifts >80% 132
shifts >8hr dow 8

File: 593040949.xls Page 24 of 35 Date: 05/19/2022


Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
East Bathtub Slurry Walls
WTC - East Bathtub Slurry Walls
Production Charts for Hydromill
Bartz

Comments Teeth Shanks


Total Shifts Mill #2 Shifts type date Replaced Broken

0
1 w 4-Jan-07 Sotres shaker bolts loose, Mill motor bolts loose 50
2 w 5-Jan-07 30 mins preactivity meeting
3 s 6-Jan-07 Hydraulic motor, mission pump & mixing plant
4 w 8-Jan-07 Generator & Sotres 83
5 w 9-Jan-07 Sotres Problem 91
6 w 10-Jan-07 84
7 w 11-Jan-07 Hydraulic filter changed 97
8 w 12-Jan-07 Concrete Placement - Waiting on LE3 Clam to Finish
9 s 13-Jan-07 Waiting for clamshell to finish Obstruction LE3 100
10 w 15-Jan-07 37
11 w 16-Jan-07 Hydraulic motor changed 30
12 w 17-Jan-07 Clean Tanks on Sotres
13 w 18-Jan-07 Clean Tanks on Sotres 115 2
14 w 19-Jan-07 78
15 w 22-Jan-07 Problem with Sotres 22
16 w 23-Jan-07 Rectifying C3 due to obstructions 13
17 w 24-Jan-07 Rectifying C3 due to obstructions 20 3
18 w 25-Jan-07 Rectifying C3 due to obstructions 111 11
19 w 26-Jan-07 9 shanks broke 35 9
20 s 27-Jan-07 Chiseling due to obstruction 31
21 w 29-Jan-07 Digging at C3, Changed wheels 79 5
22 w 30-Jan-07 Pump Froze, Shanks caught in wheels, Broke Piston Inclination Plate 18 7
23 w 31-Jan-07 Welding shanks, Waiting for Rig#2 to chisel and maintenance 38
24 w 1-Feb-07 Waiting for clamshell to chisel at C3
25 w 2-Feb-07 Maintenance, plant froze, Chiseling due to Obstructions 13
26 w 5-Feb-07 Plant Froze, Bentonite Line froze
27 w 6-Feb-07 Changed teeth, new type 152
28 w 7-Feb-07 86
29 w 8-Feb-07 Broke tilt plait cylinder, desanding at LE5 44
30 w 9-Feb-07 Safety meetg, accumulator froze, broke hydraulic hose 17
31 w 12-Feb-07 Problem with mission pump, broke piston, cleaned bite with bucket 27
32 w 13-Feb-07 Maintenance, standby due to LE1 cage lift, Desanding LE1, Joint Cleaning 5
33 w 14-Feb-07 Maintainence, steel obstruction 8 1
34 w 15-Feb-07 Maintainence, Broke pipe return, loss of bentonite
35 w 16-Feb-07 Connecting Pipe and Hose Bentonite, Blow out lines 19
36 s 17-Feb-07 Broke accumulator on hydromill
37 w 20-Feb-07 Frozen pump, Standby for cleaning, Loss of Bentonite approx 8000 gal
38 w 21-Feb-07 Standby waiting for Rig 1 to chisel. 15
Joint Cleaning and Desanding, Standby as no work on LE6 due to panel
39 w 22-Feb-07 collapse from obstruction
Joint Cleaning and Desanding, Standby as no work on LE6 due to panel
40 w 23-Feb-07 collapse
41 w 26-Feb-07 Critical path delay move from LE6 to C5, Maintenance 71 2
42 w 27-Feb-07 Problem with accumulator 51 1
43 w 28-Feb-07 Extra rock excavated, maintenance cut slurry hose 21
44 w 1-Mar-07 Desanding LG1, Connected bentonite hose, grease motors 43 3
45 w 2-Mar-07 Problem with AVARO & counterwts, problem with bent line 15
46 w 5-Mar-07 digging rock, maintenance 39 4
47 w 6-Mar-07 Change wheels, pump froze, maintenance 63
48 w 7-Mar-07 maintenance, change piston, dug added rock, 7.75 hrs CP delay 59 1
49 w 8-Mar-07 490 SF of soil, digging added Till & Rock, 7.5 hrs of CP Delay 58 1
50 w 9-Mar-07 maintenance, broke piston plate, 1.75 hrs CP Delay (Added Rock) 143 2
51 s 10-Mar-07 repairs, broke pipe exit pump, 3 hrs CP Delay (Added Rock) 107
52 w 12-Mar-07 Desanding/joint cleaning at C5, broke powerpack pump
53 w 13-Mar-07 work on repairing the powerpack pump
54 w 14-Mar-07 work on repairing the powerpack pump
55 w 15-Mar-07 work on repairing the powerpack pump
56 w 16-Mar-07 work on repairing the powerpack pump
57 s 17-Mar-07 work on repairing the powerpack pump
58 w 19-Mar-07 work on repairing the powerpack pump
59 w 20-Mar-07 Pump stopped, waiting while rig #2 chiseled, problem with sotres 45
60 w 21-Mar-07 Cleaning & Desanding LE2, Standby for area 63
61 w 22-Mar-07 No pressure in right wheel, Change fuel filter 26
62 w 23-Mar-07 Main shaft on powerpack pump broke down 6
63 1 w 26-Mar-07 Standby finish setup new mill, wait to load out load mill, joint cleaning 53
Desanding & Joint Cleaning, prob with power pack fuse, still plate, Dug
64 2 w 27-Mar-07 112 SF of soil 29 1
65 3 w 28-Mar-07 maintenance, rectify verticality from slab obstn, grease hydraulic motor 57 3
Trouble with AMSCO pump, stopped by phoenix due to bentonite loss in ECS
66 4 w 29-Mar-07 duct bank
67 5 w 30-Mar-07 CP delay standby loosing bentonite in ECS Duct Bank.
68 6 w 2-Apr-07 Waiting on Phoenix to put pump in ECS Duct Bank 50 2
69 7 w 3-Apr-07 Waitin for Phoenix to put pump in ECS Duct Bank, CP delay no place to go
Critical path delay no area available due to obstn at C4 & LE4, rectify
70 8 w 4-Apr-07 verticality due to pile obstns
71 9 w 5-Apr-07 Standby rig #1 chiseling, electric problem in plant 126
mass safety mtg, plant down, checking if cage will fit due to damaged E/S
72 10 w 6-Apr-07 from pile obstn in east bite 54
73 11 w 9-Apr-07 CP Delay no panel to move to, standby while checking final depth 9
74 12 w 10-Apr-07 Setup at C4, prob w/ hydraulic pump, desand bent. Due to obstns 99
75 13 w 11-Apr-07 Standby when Rig #1 chiseling, desanding contaminated bentonite 165
76 14 w 12-Apr-07 Plant down, 92
77 15 w 13-Apr-07 Repair Hose on mill, waiting for rig #1 to chisel
78 16 w 16-Apr-07 Extra work digging through lean mix 13
79 17 w 17-Apr-07 Problem w/ electric motor at sotres, cleaned out 28
80 18 w 18-Apr-07 Safety Meeting, change hydraulic motor on cutter head 29
81 19 w 19-Apr-07 Blew Seal on Accumulator while filling with oil
82 20 w 20-Apr-07 Maintenance, grease motors 42
83 21 s 21-Apr-07 Problem at Plant, standby rig#2 chiseling, grease motors 26
84 22 w 23-Apr-07 Plant Broke down, waiting on Rig #2 to chisel, Dug 510.6 SF of Soil 10
85 23 w 24-Apr-07 Standby Rig #2 chiseling, grease motors 22 1
File: 593040949.xls Page 25 of 35 Date: 05/19/2022
Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
86 24 w 25-Apr-07 Had to stop to allow panel to fill up with bentonite, grease motors 32 East Bathtub Slurry Walls
87 25 w 26-Apr-07 Grease Motors, moved from C1 to C6 57
88 26 w 27-Apr-07 Grease motors 44
89 27 s 28-Apr-07 Fixing leak in mill motor, broke hydraulic hose on mill
90 28 w 30-Apr-07 Repairing bentonite return line on mill
91 29 w 1-May-07 grease motors, standby Rig 2 chiseling north endstop 75
92 30 w 2-May-07 Cleaning panel LG4, grease motors 32
93 31 w 3-May-07 Standby waiting for Rig 1 to clean endstop, grease motors 26
94 32 w 4-May-07 work began on power pack 70
95 33 s 5-May-07 Finish repairing power pack, grease motors 43
96 34 w 7-May-07 grease motors, standby rig #1 cleaning endstops 16 2
97 35 w 8-May-07 Move to C8, Wait for rig #2 to chisel
98 36 w 9-May-07 wait for rig #2 to chisel and clean endstops 23
99 37 w 10-May-07 Move to LG3
100 38 w 11-May-07 Begin preparing rig for mobe to north side
106 38 s 19-May-07 power pack keeps shuting down, grease motors 14
107 39 w 21-May-07 broke hydraulic hose on rebar obstn, grease motors 8
108 40 w 22-May-07 fix pin on mill 46
109 41 w 23-May-07 fixing shims on tracks, fix cable on boom 19
110 42 w 24-May-07 grease motors, no place to go to 34
111 43 w 25-May-07 wait on 6" hose to attach to slurry piping, grease motors
112 44 w 29-May-07 CPD repairing feed/return lines damaged by trucks from other contractors
113 45 w 30-May-07 repair motor/ pump in power pack
114 46 w 31-May-07 work on power pack, wait for traffic to move, problem with discharge pump
115 47 w 1-Jun-07 tighten bolts on top of hydromill 12
116 48 s 2-Jun-07 finished digging by 11:45 a.m 10
117 49 w 4-Jun-07 grind concrete slab on east edge, grease motors 16
118 50 w 5-Jun-07 problem w/ batch plant, tighten bolts, standby wait to desand
119 51 w 6-Jun-07 standby waiting for service rig to pick cage & endstop, grease motors 15
120 52 w 7-Jun-07 power pack ran out of fuel, move out of way so rig #1 can clean endstop 34
121 53 w 8-Jun-07 move rigs around, wait for VE10 Cage pick, stopped for fuel 9
122 54 s 9-Jun-07 replace motor on top of boom, generator at plant broke down 38
123 55 w 11-Jun-07 Working on generator at plant
124 56 w 12-Jun-07 CPD waiting for Phoenix to remove fence around, grease motors 14
125 57 w 13-Jun-07 safety stand down mtg, repair bentonite hose, standby rig #1 clean endstop
126 58 w 14-Jun-07 waiting for service crane to move and cage pick 36
127 59 w 15-Jun-07 Finished middle bite
128 60 w 18-Jun-07 wait for area at VE7, rectify verticality at VE7, wait for service rig to set tremie 23
129 61 w 19-Jun-07 wait for rig# 1 to clean endstop, broke hydraulic piston 107
130 62 w 20-Jun-07 hydraulic/ electrical problem in power pack, grease wheels 122
131 63 w 21-Jun-07 Plant down, grease motors 140
132 64 w 22-Jun-07 wait to move at VE5, move rig so night shift can replace hydraulic cylinders 29
adjust hydraulic cylinders, too much conc overpour moved to let Rig #1
133 65 s 23-Jun-07 remove conc pieces
134 66 w 25-Jun-07 wait for clam to finish removing overpour, change accumulator
135 67 w 26-Jun-07 wait for VE12 area, grease motors, east endstop out of plum 20
136 68 w 27-Jun-07 repair bentonite return line, wait for rig #1 to clean endstop
137 69 w 28-Jun-07 Safety Stay Down by Phoenix
138 70 w 29-Jun-07 Wait for survey to shoot marks on G.W, grease motors 27 8
139 71 s 30-Jun-07 welding shanks that broke on 06/29/07
140 72 w 2-Jul-07 386.83 SF of soil 3
wait for rig #1 to chisel at west endstop, having problems with endstop steel
141 73 w 3-Jul-07 plate, had to come out because wheels locking up 87
142 74 w 5-Jul-07 move to VE 16 to desand tomorrow, grease wheels 24
143 75 w 6-Jul-07 Clean/desand VE16, wait for rig #1 to clean endstop 13
Grinding south wall 11'-14' where concrete slab obstruction protruded from
144 76 w 9-Jul-07 wall 21
145 77 w 10-Jul-07 Wait for survey to shoot marks on G.W, grease wheels 27
146 78 w 11-Jul-07 Wait for angle iron on G.W, repair leak in hydraulic motor on mill
147 79 w 12-Jul-07 Add hydraulic oil, grind boulders, wait for rig #1 to chisel at endstops 114
148 80 w 13-Jul-07 Grind on boulder at VE1/VE2, survey checking verticality, grease motors
149 81 w 14-Jul-07 Problem with generator at plant, wait for rig #1 to clean endstop 46
150 82 w 16-Jul-07 Wait for rig #1 to chisel boulders, overcut panel VE1 by 24" 40
151 83 w 17-Jul-07 Clean/desand VE2, grease wheels 35
152 84 w 18-Jul-07 Stop for Survey, replace pin on hydromill 36
153 85 w 19-Jul-07 Standby Rig #1 chiseling, problem in slurry plant 73
154 86 w 20-Jul-07 Clean/desand VC1, grease motors 41
155 87 s 21-Jul-07 No penetration, need to chisel rock 68 2
156 88 w 23-Jul-07 Stop for survey, grease wheels 15
Clean/desand C36S, wait for Cruz to clean mess at VE1-VE3 and move rig,
157 89 w 24-Jul-07 problem in slurry plant
158 90 w 25-Jul-07 Replace broken hydraulic hose
159 91 w 26-Jul-07 Wait for survey to shoot G.W., wait for rig #1 to chisel boulder 45
160 92 w 27-Jul-07 Moved to C41, hydromill down
161 93 s 28-Jul-07 Repair counterweight, grease motors
162 94 w 30-Jul-07 Wait for rig #1 to chisel boulder, wait for survey 35
163 95 w 31-Jul-07 Wait for rig #1 to clean endstop in C41, grease motors 87
164 96 w 1-Aug-07 Problem in plant, stop for survey, electrical problem in power pack 75
165 97 w 2-Aug-07 Standby, rig #1 chiseling 131
166 98 w 3-Aug-07 Rig #1 chiseling, clog in Amsco pump line 98
167 99 s 4-Aug-07 Stopped by P.A. due to water line break on Vesey Street, no water at plant
168 100 w 6-Aug-07 Wait for rig #1 to chisel rock and clean endstops
169 101 w 7-Aug-07 Repair leak in motor, replace discharge hose
170 102 w 8-Aug-07 Problem with computer, blew fuse 31
171 103 w 9-Aug-07 Grease motors 35
172 104 w 10-Aug-07 Standby while cage is set in C38 36
173 105 s 11-Aug-07 Grease motors
174 106 w 13-Aug-07 Wait for survey, wait for rig #1 to chisel and clean endstops
175 107 w 14-Aug-07 Repair hydraulic hose on mill
176 108 w 15-Aug-07 Critical path delay due to obstruction
177 109 w 16-Aug-07 RE-excavate lean mix, repairs due to obstns
178 110 w 17-Aug-07 build guide frame for mill, no water at plant 30
179 111 s 18-Aug-07 build guide frame on south bite, repair hydraulic hose
180 112 w 20-Aug-07 no fuel in power pack, weld shank wait for rig #1 to chisel, grease motors 28
181 113 w 21-Aug-07 standby rig #1 clean and chisel endstop 47
182 114 w 22-Aug-07 hydromill remove pieces of rebar from H& M slab
183 115 w 23-Aug-07 hydromill worked night shift, rabar found lodged in slurry line
184 116 w 24-Aug-07 change pipe in motor 102
185 117 s 25-Aug-07 delay due to out of sequence work
186 118 w 27-Aug-07 delay due to out of sequence work
187 119 w 28-Aug-07 delay due to out of sequence work

File: 593040949.xls Page 26 of 35 Date: 05/19/2022


Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
188 120 w 29-Aug-07 delay due to out of sequence work, bentonite contaminated with wood 47 East Bathtub Slurry Walls
189 121 w 30-Aug-07 wood obstruction caused problem in plant 50
190 122 w 31-Aug-07 demobilize rig 43
191
192
193

insert rows above here to add data


5986 71
w =workday
s =saturday/ sunday Average Teeth per SF (Till + Rock) 0.47
r =rain outs Average Teeth per SF (Till) 1.00
Total scheduled shifts Average Teeth per SF (Rock) 0.90

File: 593040949.xls Page 27 of 35 Date: 05/19/2022


Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
East Bathtub Slurry Walls
WTC - East Bathtub Slurry Walls
Production Charts for Hydromill
Bartz
MANHOUR FACTORS
Production Production w/ KT DT Production overall BUDGET TILL ROCK COMBINED
Productive cumm Prod instant ave instant Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive mh/sf mh/sf mh/sf
Total Shifts Mill #2 Shifts type date rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours budget curr to date budget curr to date budget curr to date

0
1 w 4-Jan-07 2.50 2.50 16.3 16.3 12.00 12.00 3.4 3.4 12.00 12.00 3.4 3.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
2 w 5-Jan-07 0.00 2.50 0.0 16.3 10.50 22.50 0.0 1.8 10.50 22.50 0.0 1.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
3 s 6-Jan-07 0.00 2.50 0.0 16.3 10.50 33.00 0.0 1.2 10.50 33.00 0.0 1.2 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
4 w 8-Jan-07 2.50 5.00 27.2 21.8 11.50 44.50 5.9 2.4 11.50 44.50 5.9 2.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
5 w 9-Jan-07 8.00 13.00 3.3 10.4 10.50 55.00 2.5 2.5 10.50 55.00 2.5 2.5 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
6 w 10-Jan-07 12.00 25.00 7.2 8.9 12.50 67.50 6.9 3.3 12.50 67.50 6.9 3.3 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
7 w 11-Jan-07 9.25 34.25 2.3 7.1 10.50 78.00 2.0 3.1 10.50 78.00 2.0 3.1 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
8 w 12-Jan-07 0.00 34.25 0.0 7.1 0.50 78.50 0.0 3.1 9.50 87.50 0.0 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
9 s 13-Jan-07 0.00 34.25 0.0 7.1 0.00 78.50 0.0 3.1 8.50 96.00 0.0 2.5 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
10 w 15-Jan-07 6.50 40.75 6.8 7.0 10.50 89.00 4.2 3.2 11.50 107.50 3.8 2.7 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
11 w 16-Jan-07 1.50 42.25 6.9 7.0 9.50 98.50 1.1 3.0 11.50 119.00 0.9 2.5 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
12 w 17-Jan-07 0.00 42.25 0.0 7.0 8.50 107.00 0.0 2.8 8.50 127.50 0.0 2.3 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
13 w 18-Jan-07 6.50 48.75 11.0 7.6 9.25 116.25 7.7 3.2 10.75 138.25 6.6 2.7 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
14 w 19-Jan-07 11.25 60.00 4.8 7.0 14.00 130.25 3.9 3.2 15.00 153.25 3.6 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
15 w 22-Jan-07 1.75 61.75 0.0 6.8 9.25 139.50 0.0 3.0 11.50 164.75 0.0 2.6 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
16 w 23-Jan-07 0.00 61.75 0.0 7.0 2.50 142.00 3.2 3.0 12.00 176.75 0.7 2.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
17 w 24-Jan-07 0.25 62.00 110.4 7.4 1.75 143.75 15.8 3.2 11.00 187.75 2.5 2.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
18 w 25-Jan-07 6.00 68.00 15.7 8.1 7.75 151.50 12.1 3.6 11.50 199.25 8.2 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
19 w 26-Jan-07 5.00 73.00 5.1 7.9 8.50 160.00 3.0 3.6 8.50 207.75 3.0 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
20 s 27-Jan-07 4.00 77.00 1.9 7.6 7.25 167.25 1.1 3.5 8.50 216.25 0.9 2.7 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
21 w 29-Jan-07 5.50 82.50 7.2 7.6 10.00 177.25 4.0 3.5 10.00 226.25 4.0 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
22 w 30-Jan-07 6.00 88.50 5.5 7.4 10.50 187.75 3.1 3.5 10.50 236.75 3.1 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
23 w 31-Jan-07 6.50 95.00 13.9 7.9 10.50 198.25 8.6 3.8 10.50 247.25 8.6 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
24 w 1-Feb-07 10.00 105.00 2.1 7.3 10.50 208.75 2.0 3.7 10.50 257.75 2.0 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
25 w 2-Feb-07 9.00 114.00 3.5 7.0 10.50 219.25 3.0 3.7 10.50 268.25 3.0 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
26 w 5-Feb-07 3.25 117.25 12.7 7.2 13.00 232.25 3.2 3.6 13.00 281.25 3.2 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
27 w 6-Feb-07 7.25 124.50 11.2 7.4 10.75 243.00 7.5 3.8 10.75 292.00 7.5 3.2 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
28 w 7-Feb-07 7.00 131.50 2.6 7.2 12.00 255.00 1.5 3.7 12.00 304.00 1.5 3.1 6.50 0.200 0.00 1.000 0.00 0.00
29 w 8-Feb-07 3.00 134.50 0.0 7.0 10.50 265.50 0.0 3.5 10.50 314.50 0.0 3.0 6.50 0.200 0.00 1.000 0.00 0.00
30 w 9-Feb-07 3.75 138.25 2.1 6.9 8.50 274.00 0.9 3.5 8.50 323.00 0.9 2.9 6.50 0.200 0.00 1.000 0.00 0.00
31 w 12-Feb-07 4.00 142.25 6.1 6.8 10.50 284.50 2.3 3.4 10.50 333.50 2.3 2.9 6.50 0.200 0.00 1.000 0.00 ###
32 w 13-Feb-07 1.50 143.75 39.7 7.2 10.50 295.00 5.7 3.5 10.50 344.00 5.7 3.0 6.50 0.200 0.00 1.000 0.00
33 w 14-Feb-07 5.25 149.00 21.1 7.7 7.25 302.25 15.3 3.8 9.00 353.00 12.3 3.2 6.50 0.200 0.00 1.000 0.00
34 w 15-Feb-07 4.75 153.75 7.3 7.7 8.75 311.00 3.9 3.8 10.00 363.00 3.5 3.2 6.50 0.00 0.00
35 w 16-Feb-07 5.75 159.50 19.5 8.1 10.50 321.50 10.7 4.0 10.50 373.50 10.7 3.5 6.50 0.00 0.00
36 s 17-Feb-07 6.50 166.00 3.8 7.9 8.50 330.00 2.9 4.0 8.50 382.00 2.9 3.4 6.50 0.00 0.00
37 w 20-Feb-07 0.75 166.75 34.6 8.0 7.00 337.00 3.7 4.0 10.50 392.50 2.5 3.4 6.50 0.00 0.00
38 w 21-Feb-07 1.00 167.75 26.9 8.2 8.50 345.50 3.2 4.0 8.50 401.00 3.2 3.4 6.50 0.00 0.00

39 w 22-Feb-07 0.00 167.75 0.0 8.2 2.50 348.00 0.0 3.9 10.50 411.50 0.0 3.3 6.50 0.00 0.00

40 w 23-Feb-07 0.00 167.75 0.0 8.2 2.50 350.50 0.0 3.9 10.50 422.00 0.0 3.2 6.50 0.00 0.00
41 w 26-Feb-07 5.25 173.00 41.1 9.2 7.50 358.00 28.8 4.4 10.50 432.50 20.6 3.7 6.50 0.00 0.00
42 w 27-Feb-07 4.50 177.50 17.2 9.4 10.50 368.50 7.4 4.5 10.50 443.00 7.4 3.8 6.50 0.00
43 w 28-Feb-07 4.75 182.25 13.8 9.5 8.50 377.00 7.7 4.6 8.50 451.50 7.7 3.8 6.50
44 w 1-Mar-07 5.75 188.00 11.4 9.5 10.50 387.50 6.2 4.6 10.50 462.00 6.2 3.9 6.50
45 w 2-Mar-07 4.00 192.00 7.2 9.5 10.50 398.00 2.7 4.6 10.50 472.50 2.7 3.9 6.50
46 w 5-Mar-07 6.00 198.00 12.3 9.6 9.00 407.00 8.2 4.7 9.00 481.50 8.2 3.9 6.50
47 w 6-Mar-07 2.00 200.00 6.0 9.5 10.50 417.50 1.1 4.6 10.50 492.00 1.1 3.9 6.50
48 w 7-Mar-07 7.25 207.25 12.6 9.6 12.00 429.50 7.6 4.7 12.00 504.00 7.6 4.0 6.50
49 w 8-Mar-07 6.25 213.50 3.8 9.5 12.50 442.00 1.9 4.6 12.50 516.50 1.9 3.9 6.50
50 w 9-Mar-07 7.25 220.75 33.8 10.3 12.00 454.00 20.4 5.0 12.00 528.50 20.4 4.3 6.50
51 s 10-Mar-07 7.75 228.50 15.0 10.4 12.00 466.00 9.7 5.1 12.00 540.50 9.7 4.4 6.50
52 w 12-Mar-07 0.00 228.50 0.0 10.4 8.50 474.50 0.0 5.0 8.50 549.00 0.0 4.3 6.50
53 w 13-Mar-07 0.00 228.50 0.0 10.4 8.50 483.00 0.0 4.9 8.50 557.50 0.0 4.3 6.50
54 w 14-Mar-07 0.00 228.50 0.0 10.4 8.50 491.50 0.0 4.9 8.50 566.00 0.0 4.2 6.50
55 w 15-Mar-07 0.00 228.50 0.0 10.4 8.50 500.00 0.0 4.8 8.50 574.50 0.0 4.2 6.50
56 w 16-Mar-07 0.00 228.50 0.0 10.4 8.50 508.50 0.0 4.7 8.50 583.00 0.0 4.1 6.50
57 s 17-Mar-07 0.00 228.50 0.0 10.4 8.50 517.00 0.0 4.6 8.50 591.50 0.0 4.0 6.50
58 w 19-Mar-07 1.50 230.00 2.7 10.4 12.00 529.00 0.3 4.5 12.00 603.50 0.3 4.0 6.50
59 w 20-Mar-07 2.50 232.50 16.0 10.4 12.00 541.00 3.3 4.5 12.00 615.50 3.3 3.9 6.50
60 w 21-Mar-07 4.25 236.75 6.8 10.4 10.00 551.00 2.9 4.5 10.00 625.50 2.9 3.9 6.50
61 w 22-Mar-07 9.25 246.00 8.0 10.3 12.50 563.50 6.0 4.5 12.50 638.00 6.0 4.0 6.50
62 w 23-Mar-07 2.50 248.50 11.5 10.3 8.50 572.00 3.4 4.5 8.50 646.50 3.4 4.0 6.50
63 1 w 26-Mar-07 1.25 249.75 2.8 10.3 10.25 582.25 0.3 4.4 10.25 656.75 0.3 3.9 6.50

64 2 w 27-Mar-07 4.25 254.00 36.7 10.7 10.50 592.75 14.9 4.6 10.50 667.25 14.9 4.1 6.50
65 3 w 28-Mar-07 4.00 258.00 28.9 11.0 7.50 600.25 15.4 4.7 10.50 677.75 11.0 4.2 6.50

66 4 w 29-Mar-07 4.00 262.00 12.6 11.0 9.50 609.75 5.3 4.7 10.50 688.25 4.8 4.2 6.50
67 5 w 30-Mar-07 0.00 262.00 0.0 11.0 0.50 610.25 0.0 4.7 8.50 696.75 0.0 4.1 6.50
68 6 w 2-Apr-07 8.00 270.00 14.2 11.1 9.75 620.00 11.6 4.8 11.00 707.75 10.3 4.2 6.50
69 7 w 3-Apr-07 0.75 270.75 10.2 11.1 2.50 622.50 3.1 4.8 8.50 716.25 0.9 4.2 6.50

70 8 w 4-Apr-07 1.00 271.75 5.6 11.1 2.00 624.50 2.8 4.8 10.50 726.75 0.5 4.1 6.50
71 9 w 5-Apr-07 7.75 279.50 7.3 11.0 12.00 636.50 4.7 4.8 12.00 738.75 4.7 4.2 6.50

72 10 w 6-Apr-07 2.50 282.00 15.6 11.0 6.50 643.00 6.0 4.8 7.50 746.25 5.2 4.2 6.50
73 11 w 9-Apr-07 2.25 284.25 7.6 11.0 4.00 647.00 4.3 4.8 8.50 754.75 2.0 4.1 6.50
74 12 w 10-Apr-07 3.00 287.25 27.7 11.2 9.50 656.50 8.8 4.9 10.50 765.25 7.9 4.2 6.50
75 13 w 11-Apr-07 5.00 292.25 24.2 11.4 10.00 666.50 12.1 5.0 11.00 776.25 11.0 4.3 6.50
76 14 w 12-Apr-07 8.25 300.50 27.4 11.8 10.00 676.50 22.6 5.3 10.00 786.25 22.6 4.5 6.50
77 15 w 13-Apr-07 8.00 308.50 6.0 11.7 10.50 687.00 4.6 5.2 10.50 796.75 4.6 4.5 6.50
78 16 w 16-Apr-07 10.00 318.50 27.1 12.2 11.50 698.50 23.5 5.5 12.00 808.75 22.6 4.8 6.50
79 17 w 17-Apr-07 3.75 322.25 5.7 12.1 10.50 709.00 2.0 5.5 10.50 819.25 2.0 4.8 6.50
80 18 w 18-Apr-07 0.00 322.25 0.0 12.1 10.50 719.50 0.0 5.4 10.50 829.75 0.0 4.7 6.50
81 19 w 19-Apr-07 2.50 324.75 8.0 12.1 10.50 730.00 1.9 5.4 10.50 840.25 1.9 4.7 6.50
82 20 w 20-Apr-07 4.25 329.00 15.8 12.1 10.50 740.50 6.4 5.4 10.50 850.75 6.4 4.7 6.50
83 21 s 21-Apr-07 4.75 333.75 13.0 12.1 8.50 749.00 7.2 5.4 8.50 859.25 7.2 4.7 6.50
84 22 w 23-Apr-07 7.00 340.75 15.9 12.2 10.50 759.50 10.6 5.5 10.50 869.75 10.6 4.8 6.50
85 23 w 24-Apr-07 5.50 346.25 12.6 12.2 10.50 770.00 6.6 5.5 10.50 880.25 6.6 4.8 6.50
File: 593040949.xls Page 28 of 35 Date: 05/19/2022
Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
86 24 w 25-Apr-07 6.75 353.00 7.9 12.1 11.50 781.50 4.7 5.5 11.50 891.75 4.7 4.8 East Bathtub
6.50 Slurry Walls
87 25 w 26-Apr-07 6.25 359.25 14.1 12.2 10.50 792.00 8.4 5.5 10.50 902.25 8.4 4.8 6.50
88 26 w 27-Apr-07 5.75 365.00 22.3 12.3 10.50 802.50 12.2 5.6 10.50 912.75 12.2 4.9 6.50
89 27 s 28-Apr-07 3.25 368.25 8.9 12.3 8.50 811.00 3.4 5.6 8.50 921.25 3.4 4.9 6.50
90 28 w 30-Apr-07 4.50 372.75 18.1 12.4 10.50 821.50 7.8 5.6 10.50 931.75 7.8 4.9 6.50
91 29 w 1-May-07 1.25 374.00 14.7 12.4 10.50 832.00 1.8 5.6 10.50 942.25 1.8 4.9 6.50
92 30 w 2-May-07 5.75 379.75 4.9 12.2 11.50 843.50 2.4 5.5 11.50 953.75 2.4 4.9 6.50
93 31 w 3-May-07 2.00 381.75 16.2 12.3 8.50 852.00 3.8 5.5 8.50 962.25 3.8 4.9 6.50
94 32 w 4-May-07 5.50 387.25 11.6 12.3 10.50 862.50 6.1 5.5 10.50 972.75 6.1 4.9 6.50
95 33 s 5-May-07 3.75 391.00 28.6 12.4 8.50 871.00 12.6 5.6 8.50 981.25 12.6 4.9 6.50
96 34 w 7-May-07 4.50 395.50 29.8 12.6 8.50 879.50 15.8 5.7 8.50 989.75 15.8 5.0 6.50
97 35 w 8-May-07 3.75 399.25 8.5 12.6 10.50 890.00 3.0 5.6 10.50 1000.25 3.0 5.0 6.50
98 36 w 9-May-07 4.50 403.75 25.0 12.7 8.50 898.50 13.2 5.7 8.50 1008.75 13.2 5.1 6.50
99 37 w 10-May-07 3.25 407.00 5.2 12.7 8.50 907.00 2.0 5.7 8.50 1017.25 2.0 5.1 6.50
100 38 w 11-May-07 2.00 409.00 6.1 12.6 10.50 917.50 1.2 5.6 10.50 1027.75 1.2 5.0 6.50
106 38 s 19-May-07 5.50 414.50 38.3 13.0 8.50 926.00 24.8 5.8 8.50 1036.25 24.8 5.2 6.50
107 39 w 21-May-07 3.25 417.75 28.3 13.1 10.50 936.50 8.8 5.8 10.50 1046.75 8.8 5.2 6.50
108 40 w 22-May-07 8.50 426.25 10.4 13.0 10.50 947.00 8.4 5.9 10.50 1057.25 8.4 5.3 6.50
109 41 w 23-May-07 5.00 431.25 20.2 13.1 11.50 958.50 8.8 5.9 11.50 1068.75 8.8 5.3 6.50
110 42 w 24-May-07 0.00 431.25 0.0 13.1 8.50 967.00 0.0 5.8 8.50 1077.25 0.0 5.2 6.50
111 43 w 25-May-07 3.25 434.50 49.8 13.4 6.00 973.00 27.0 6.0 6.00 1083.25 27.0 5.4 6.50
112 44 w 29-May-07 0.00 434.50 0.0 13.4 0.50 973.50 0.0 6.0 8.50 1091.75 0.0 5.3 6.50
113 45 w 30-May-07 0.00 434.50 0.0 13.4 10.50 984.00 0.0 5.9 10.50 1102.25 0.0 5.3 6.50
114 46 w 31-May-07 4.50 439.00 12.0 13.4 10.50 994.50 5.1 5.9 10.50 1112.75 5.1 5.3 6.50
115 47 w 1-Jun-07 6.25 445.25 11.1 13.3 10.50 1005.00 6.6 5.9 10.50 1123.25 6.6 5.3 6.50
116 48 s 2-Jun-07 4.25 449.50 17.2 13.4 8.50 1013.50 8.6 5.9 8.50 1131.75 8.6 5.3 6.50
117 49 w 4-Jun-07 3.50 453.00 23.1 13.5 8.00 1021.50 10.1 6.0 10.50 1142.25 7.7 5.3 6.50
118 50 w 5-Jun-07 3.50 456.50 27.4 13.6 8.50 1030.00 11.3 6.0 8.50 1150.75 11.3 5.4 6.50
119 51 w 6-Jun-07 2.75 459.25 9.8 13.5 10.50 1040.50 2.6 6.0 10.50 1161.25 2.6 5.4 6.50
120 52 w 7-Jun-07 7.00 466.25 21.6 13.7 10.50 1051.00 14.4 6.1 10.50 1171.75 14.4 5.4 6.50
121 53 w 8-Jun-07 5.00 471.25 16.9 13.7 12.00 1063.00 7.1 6.1 12.00 1183.75 7.1 5.5 6.50
122 54 s 9-Jun-07 4.00 475.25 21.0 13.8 8.50 1071.50 9.9 6.1 8.50 1192.25 9.9 5.5 6.50
123 55 w 11-Jun-07 1.25 476.50 49.9 13.8 12.00 1083.50 5.2 6.1 12.00 1204.25 5.2 5.5 6.50
124 56 w 12-Jun-07 5.75 482.25 36.0 14.1 9.50 1093.00 21.8 6.2 10.50 1214.75 19.7 5.6 6.50
125 57 w 13-Jun-07 2.75 485.00 49.0 14.3 8.50 1101.50 15.9 6.3 8.50 1223.25 15.9 5.7 6.50
126 58 w 14-Jun-07 4.00 489.00 23.0 14.4 12.00 1113.50 7.7 6.3 12.00 1235.25 7.7 5.7 6.50
127 59 w 15-Jun-07 8.25 497.25 21.6 14.5 9.00 1122.50 19.8 6.4 9.00 1244.25 19.8 5.8 6.50
128 60 w 18-Jun-07 4.50 501.75 44.7 14.8 10.50 1133.00 19.1 6.5 11.50 1255.75 17.5 5.9 6.50
129 61 w 19-Jun-07 8.75 510.50 23.3 14.9 12.00 1145.00 17.0 6.7 12.00 1267.75 17.0 6.0 6.50
130 62 w 20-Jun-07 2.50 513.00 10.2 14.9 12.00 1157.00 2.1 6.6 12.00 1279.75 2.1 6.0 6.50
131 63 w 21-Jun-07 9.25 522.25 30.7 15.2 12.00 1169.00 23.6 6.8 12.00 1291.75 23.6 6.1 6.50
132 64 w 22-Jun-07 5.00 527.25 21.6 15.2 11.50 1180.50 9.4 6.8 11.50 1303.25 9.4 6.2 6.50

133 65 s 23-Jun-07 0.00 527.25 0.0 15.2 8.50 1189.00 0.0 6.8 8.50 1311.75 0.0 6.1 6.50
134 66 w 25-Jun-07 4.25 531.50 34.8 15.4 11.00 1200.00 13.4 6.8 11.00 1322.75 13.4 6.2 6.50
135 67 w 26-Jun-07 5.75 537.25 13.3 15.4 11.50 1211.50 6.7 6.8 11.50 1334.25 6.7 6.2 6.50
136 68 w 27-Jun-07 4.75 542.00 15.4 15.4 8.50 1220.00 8.6 6.8 8.50 1342.75 8.6 6.2 6.50
137 69 w 28-Jun-07 0.00 542.00 0.0 15.4 8.00 1228.00 0.0 6.8 8.00 1350.75 0.0 6.2 6.50
138 70 w 29-Jun-07 6.50 548.50 15.9 15.4 11.50 1239.50 9.0 6.8 12.00 1362.75 8.6 6.2 6.50
139 71 s 30-Jun-07 0.00 548.50 0.0 15.4 8.50 1248.00 0.0 6.8 8.50 1371.25 0.0 6.1 6.50
140 72 w 2-Jul-07 9.25 557.75 16.6 15.4 10.50 1258.50 14.6 6.8 10.50 1381.75 14.6 6.2 6.50

141 73 w 3-Jul-07 4.50 562.25 17.6 15.4 11.50 1270.00 6.9 6.8 11.50 1393.25 6.9 6.2 6.50
142 74 w 5-Jul-07 8.00 570.25 31.2 15.6 10.50 1280.50 23.7 7.0 10.50 1403.75 23.7 6.4 6.50
143 75 w 6-Jul-07 3.25 573.50 14.8 15.6 9.50 1290.00 5.1 6.9 9.50 1413.25 5.1 6.3 6.50

144 76 w 9-Jul-07 4.00 577.50 11.3 15.6 10.00 1300.00 4.5 6.9 10.00 1423.25 4.5 6.3 6.50
145 77 w 10-Jul-07 5.75 583.25 12.5 15.6 10.25 1310.25 7.0 6.9 10.50 1433.75 6.9 6.3 6.50
146 78 w 11-Jul-07 1.75 585.00 24.0 15.6 10.50 1320.75 4.0 6.9 10.50 1444.25 4.0 6.3 6.50
147 79 w 12-Jul-07 4.00 589.00 29.4 15.7 11.00 1331.75 10.7 6.9 11.00 1455.25 10.7 6.3 6.50
148 80 w 13-Jul-07 3.25 592.25 27.7 15.8 10.50 1342.25 8.6 7.0 10.50 1465.75 8.6 6.4 6.50
149 81 w 14-Jul-07 2.75 595.00 29.5 15.8 8.50 1350.75 9.5 7.0 8.50 1474.25 9.5 6.4 6.50
150 82 w 16-Jul-07 4.50 599.50 0.9 15.7 12.00 1362.75 0.3 6.9 12.00 1486.25 0.3 6.3 6.50
151 83 w 17-Jul-07 5.75 605.25 35.7 15.9 11.00 1373.75 18.7 7.0 11.00 1497.25 18.7 6.4 6.50
152 84 w 18-Jul-07 7.25 612.50 7.1 15.8 10.25 1384.00 5.0 7.0 10.50 1507.75 4.9 6.4 6.50
153 85 w 19-Jul-07 8.50 621.00 17.9 15.8 14.00 1398.00 10.9 7.0 14.00 1521.75 10.9 6.5 6.50
154 86 w 20-Jul-07 4.50 625.50 21.2 15.9 10.50 1408.50 9.1 7.0 10.50 1532.25 9.1 6.5 6.50
155 87 s 21-Jul-07 6.50 632.00 20.6 15.9 8.50 1417.00 15.8 7.1 8.50 1540.75 15.8 6.5 6.50
156 88 w 23-Jul-07 6.00 638.00 14.9 15.9 8.25 1425.25 10.8 7.1 8.50 1549.25 10.5 6.5 6.50

157 89 w 24-Jul-07 0.00 638.00 0.0 15.9 7.50 1432.75 0.0 7.1 10.50 1559.75 0.0 6.5 6.50
158 90 w 25-Jul-07 7.50 645.50 11.3 15.8 11.50 1444.25 7.4 7.1 11.50 1571.25 7.4 6.5 6.50
159 91 w 26-Jul-07 6.25 651.75 26.3 15.9 14.00 1458.25 11.7 7.1 14.25 1585.50 11.5 6.6 6.50
160 92 w 27-Jul-07 2.00 653.75 18.9 16.0 11.00 1469.25 3.4 7.1 11.00 1596.50 3.4 6.5 6.50
161 93 s 28-Jul-07 5.00 658.75 40.6 16.1 10.50 1479.75 19.3 7.2 10.50 1607.00 19.3 6.6 6.50
162 94 w 30-Jul-07 12.50 671.25 15.2 16.1 15.25 1495.00 12.4 7.2 15.50 1622.50 12.2 6.7 6.50
163 95 w 31-Jul-07 5.50 676.75 19.5 16.1 11.50 1506.50 9.3 7.3 11.50 1634.00 9.3 6.7 6.50
164 96 w 1-Aug-07 5.50 682.25 11.1 16.1 11.25 1517.75 5.4 7.2 11.50 1645.50 5.3 6.7 6.50
165 97 w 2-Aug-07 7.75 690.00 18.6 16.1 12.00 1529.75 12.0 7.3 12.00 1657.50 12.0 6.7 6.50
166 98 w 3-Aug-07 3.00 693.00 27.3 16.2 10.50 1540.25 7.8 7.3 10.50 1668.00 7.8 6.7 6.50
167 99 s 4-Aug-07 3.75 696.75 20.9 16.2 6.50 1546.75 12.0 7.3 8.50 1676.50 9.2 6.7 6.50
168 100 w 6-Aug-07 5.50 702.25 11.4 16.2 12.00 1558.75 5.2 7.3 12.00 1688.50 5.2 6.7 6.50
169 101 w 7-Aug-07 1.00 703.25 44.8 16.2 11.50 1570.25 3.9 7.3 11.50 1700.00 3.9 6.7 6.50
170 102 w 8-Aug-07 5.75 709.00 24.4 16.3 11.50 1581.75 12.2 7.3 11.50 1711.50 12.2 6.7 6.50
171 103 w 9-Aug-07 6.25 715.25 11.8 16.2 8.50 1590.25 8.7 7.3 8.50 1720.00 8.7 6.8 6.50
172 104 w 10-Aug-07 1.75 717.00 9.7 16.2 11.50 1601.75 1.5 7.3 11.50 1731.50 1.5 6.7 6.50
173 105 s 11-Aug-07 7.00 724.00 16.4 16.2 8.50 1610.25 13.5 7.3 8.50 1740.00 13.5 6.8 6.50
174 106 w 13-Aug-07 5.25 729.25 12.3 16.2 11.00 1621.25 5.9 7.3 11.50 1751.50 5.6 6.7 6.50
175 107 w 14-Aug-07 4.25 733.50 23.6 16.2 8.50 1629.75 11.8 7.3 8.50 1760.00 11.8 6.8 6.50
176 108 w 15-Aug-07 0.00 733.50 0.0 16.2 0.50 1630.25 0.0 7.3 8.50 1768.50 0.0 6.7 6.50
177 109 w 16-Aug-07 0.00 733.50 0.0 16.2 0.00 1630.25 0.0 7.3 12.00 1780.50 0.0 6.7 6.50
178 110 w 17-Aug-07 5.75 739.25 14.8 16.2 12.00 1642.25 7.1 7.3 12.00 1792.50 7.1 6.7 6.50
179 111 s 18-Aug-07 6.75 746.00 12.6 16.2 12.00 1654.25 7.1 7.3 12.00 1804.50 7.1 6.7 6.50
180 112 w 20-Aug-07 3.00 749.00 8.7 16.2 10.50 1664.75 2.5 7.3 10.50 1815.00 2.5 6.7 6.50
181 113 w 21-Aug-07 5.00 754.00 11.5 16.1 9.50 1674.25 6.1 7.3 9.50 1824.50 6.1 6.7 6.50
182 114 w 22-Aug-07 3.00 757.00 5.5 16.1 7.00 1681.25 2.4 7.2 12.00 1836.50 1.4 6.6 6.50
183 115 w 23-Aug-07 11.00 768.00 10.2 16.0 14.50 1695.75 7.8 7.3 17.00 1853.50 6.6 6.6 6.50
184 116 w 24-Aug-07 10.50 778.50 10.3 15.9 14.50 1710.25 7.4 7.3 14.50 1868.00 7.4 6.6 6.50
185 117 s 25-Aug-07 2.25 780.75 13.9 15.9 3.25 1713.50 9.6 7.3 8.50 1876.50 3.7 6.6 6.50
186 118 w 27-Aug-07 0.00 780.75 0.0 15.9 0.50 1714.00 0.0 7.3 8.50 1885.00 0.0 6.6 6.50
187 119 w 28-Aug-07 0.00 780.75 0.0 15.9 0.50 1714.50 0.0 7.3 8.50 1893.50 0.0 6.6 6.50

File: 593040949.xls Page 29 of 35 Date: 05/19/2022


Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
188 120 w 29-Aug-07 0.00 780.75 0.0 15.9 11.50 1726.00 0.0 7.2 13.75 1907.25 0.0 6.5 East Bathtub
6.50 Slurry Walls
189 121 w 30-Aug-07 4.50 785.25 14.0 15.9 5.00 1731.00 12.6 7.2 12.25 1919.50 5.1 6.5 6.50
190 122 w 31-Aug-07 5.25 790.50 30.9 16.0 12.00 1743.00 13.5 7.3 12.00 1931.50 13.5 6.6 6.50
191 6.50
192 6.50
193 6.50

insert rows above here to add data

w =workday
s =saturday/ sunday
r =rain outs
Total scheduled shifts

File: 593040949.xls Page 30 of 35 Date: 05/19/2022


Tab: HydroMill Time: 22:36:45
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Combined Efficiency

MANHOUR FACTORS
EFFICIENCY Production w/ no DT Production w/ KT DT Production overall OVERBURDEN TILL COMBINED
Production NON PRODUCTIVE TOTAL Comments Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod mh/sf mh/sf mh/sf
Shift Prod Digging Chisel Blder Chisel Bedrock Joint Clean Move/Setup Teeth/Shanks IDLE Time Rig DT Plant DT Obstructions Delay (Others) (HOURS) rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr budget curr to date budget curr to date budget curr to date

0
1 9.25 0.00 0.00 1.00 0.50 1.00 8.75 0.00 0.00 0.00 20.50
2 9.75 0.00 0.00 2.25 0.50 1.50 0.00 0.75 2.50 3.25 20.50
3 8.00 0.00 0.00 1.25 0.00 1.00 1.00 2.50 6.00 0.00 19.75
4 4.75 0.00 0.00 2.50 0.00 1.00 3.00 0.00 14.50 0.00 25.75
5 3.75 0.00 1.25 0.25 0.00 1.50 1.00 0.00 11.25 0.00 19.00
6 2.75 0.00 3.75 0.00 0.00 10.75 0.00 0.00 3.25 0.00 20.50
7 1.75 0.00 0.00 0.00 0.00 0.75 0.00 0.00 18.50 0.00 21.00
8 5.50 1.75 0.00 4.25 0.00 3.75 0.25 0.00 3.25 2.25 21.00
9 8.75 0.00 8.75 0.25 0.00 1.00 3.25 0.00 0.00 0.00 22.00
10 3.50 0.00 3.75 0.00 0.25 10.25 2.00 0.00 0.00 0.25 20.00
11 4.00 0.00 0.00 2.75 0.00 1.75 3.00 0.00 6.00 0.00 17.50
12 8.50 0.00 5.00 1.00 0.00 2.00 1.75 0.00 3.75 0.00 22.00
13 8.25 0.00 8.50 0.00 0.00 3.00 0.50 0.00 1.75 0.00 22.00
14 8.50 0.00 3.50 1.00 0.00 6.25 0.50 1.25 0.00 0.00 21.00
15 7.25 3.50 0.00 6.00 1.75 1.00 1.00 0.00 0.00 0.00 20.50
16 10.75 6.25 0.00 0.50 0.00 2.00 0.75 0.00 0.00 0.25 20.50
17 7.00 0.00 3.00 0.00 0.00 11.00 0.00 0.00 0.00 0.00 21.00
18 0.00 0.00 0.00 0.00 0.00 26.00 0.00 0.00 0.00 0.00 26.00
19 0.00 0.00 7.25 1.50 0.00 2.00 0.00 0.00 7.75 0.00 18.50
20 8.50 0.00 7.75 2.00 0.00 1.50 0.25 0.00 1.00 0.00 21.00
21 7.50 0.00 8.50 2.25 0.00 1.50 0.75 0.50 0.00 0.00 21.00
22 6.25 0.00 8.25 1.50 0.00 3.00 0.00 0.00 0.00 0.00 19.00
23 12.25 0.00 6.00 1.00 0.00 1.25 0.50 0.00 0.00 0.00 21.00
24 10.00 0.00 6.25 1.50 0.00 1.25 0.00 0.00 0.00 0.00 19.00
25 2.75 0.00 4.50 1.50 0.00 11.25 1.00 0.00 0.00 0.00 21.00
26 5.50 0.00 6.75 2.00 0.00 3.00 0.00 0.00 0.00 2.75 20.00
27 17.50 0.00 0.00 1.25 0.00 2.25 0.00 0.00 0.00 0.00 21.00
28 7.50 0.00 0.00 0.00 0.00 10.50 5.50 0.00 0.00 0.00 23.50
29 7.25 0.00 0.00 1.00 0.00 4.25 0.00 0.00 3.00 4.50 20.00
30 4.75 0.00 3.75 0.50 0.00 8.75 0.00 0.00 4.75 0.00 22.50
31 6.25 0.00 9.75 0.00 0.00 0.50 2.50 0.00 0.00 0.00 19.00
32 12.50 0.00 0.00 0.25 0.00 4.25 0.00 0.00 0.00 0.00 17.00
33 7.75 0.00 0.00 1.25 0.00 4.00 1.75 0.00 4.25 0.00 19.00
34 10.00 0.00 0.00 0.75 0.00 8.25 0.00 0.00 0.00 0.00 19.00
35 17.25 0.00 0.00 0.00 0.00 1.75 0.00 0.00 0.00 0.00 19.00
36 9.75 0.00 7.00 0.00 0.00 2.25 0.75 0.00 0.00 2.25 22.00
37 7.00 0.00 10.50 0.00 0.00 1.00 0.50 0.00 0.00 0.00 19.00
38 0.00 0.00 8.00 0.00 0.00 7.50 0.00 0.00 0.00 3.50 19.00
39 3.75 0.00 13.25 1.00 0.00 1.00 0.00 0.00 0.00 2.00 21.00
40 4.50 0.00 6.25 0.00 0.00 5.50 0.00 0.00 3.50 2.25 22.00
41 0.00 0.00 4.50 0.50 0.00 8.00 0.00 0.00 8.00 0.00 21.00
42 6.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 3.50 0.00 10.50
43 0.00 0.00 7.00 0.00 0.00 1.50 0.00 0.00 0.00 8.00 16.50
44 0.75 0.00 10.50 0.25 0.00 0.50 0.00 0.00 0.00 5.00 17.00
45 1.50 0.00 1.50 1.00 0.00 11.00 0.00 0.00 1.00 5.00 21.00
46 1.00 0.00 1.00 0.75 0.00 0.50 0.00 0.00 17.00 0.00 20.25
47 5.25 0.00 0.00 1.75 0.00 3.50 0.00 0.00 8.50 0.00 19.00
48 5.50 0.00 0.00 0.00 0.00 1.00 0.00 0.00 12.50 0.00 19.00
49 6.50 0.00 0.00 3.50 0.00 1.00 0.00 0.00 10.00 0.00 21.00
50 8.50 0.00 0.00 0.00 0.00 0.50 0.00 0.00 8.50 0.00 17.50
51 8.00 0.00 3.00 0.00 0.00 1.00 0.00 0.00 7.00 0.00 19.00
52 7.00 0.00 2.75 1.50 0.00 9.00 0.75 0.00 0.00 0.00 21.00
53 4.50 0.00 0.00 4.50 0.00 1.00 0.00 0.00 8.00 0.00 18.00
54 10.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 8.00 0.00 19.00
55 10.75 0.00 0.00 2.25 0.00 1.00 0.00 0.00 0.00 8.00 22.00
56 15.25 0.00 0.00 0.00 0.00 3.25 0.50 0.00 0.00 0.00 19.00
57 6.00 0.00 0.75 0.00 0.00 1.00 4.00 0.00 0.00 8.25 20.00
58 7.25 0.00 7.00 0.00 0.00 1.75 3.50 0.00 0.00 1.50 21.00
59 0.00 0.00 10.00 0.00 0.00 2.25 0.00 0.00 0.00 5.75 18.00
60 13.00 0.00 4.25 0.25 0.00 1.00 1.00 0.00 0.00 1.50 21.00
61 9.00 0.00 4.50 0.75 0.00 8.00 0.75 0.00 0.00 0.00 23.00
62 3.50 0.00 8.00 0.50 0.00 8.00 0.00 0.00 0.00 1.00 21.00
63 0.75 0.00 1.50 0.50 0.00 9.00 0.00 0.00 0.00 6.50 18.25
64 4.50 0.00 8.00 0.50 0.00 6.00 0.00 0.00 0.00 0.00 19.00
65 16.50 0.00 0.00 1.25 0.00 3.25 0.00 0.00 0.00 0.00 21.00
66 5.50 0.00 0.00 0.50 0.00 3.00 0.00 0.00 10.00 0.00 19.00
67 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.00 8.00 0.00 8.50
68 8.00 0.00 0.00 0.00 0.00 1.50 0.00 0.00 11.50 0.00 21.00
69 8.25 0.00 0.00 1.25 0.00 5.00 0.00 0.00 6.50 0.00 21.00
70 5.50 0.00 0.00 0.50 0.00 3.00 2.00 0.00 6.00 0.00 17.00
71 7.00 0.00 7.25 2.50 0.00 1.00 0.00 0.00 1.25 0.00 19.00
72 4.25 0.00 0.00 0.50 0.00 2.75 0.00 0.00 0.00 0.00 7.50
73 9.00 0.00 5.00 0.00 0.00 1.00 3.00 0.00 1.00 0.00 19.00
74 7.25 0.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 0.00 10.50
75 1.50 8.00 5.00 1.25 0.00 3.25 0.00 0.00 0.00 0.00 19.00
76 3.50 0.00 13.00 0.50 0.00 2.00 0.00 0.00 0.00 0.00 19.00
77 3.50 0.00 5.00 1.50 0.00 9.00 0.00 0.00 0.00 0.00 19.00
78 3.50 0.00 0.00 0.00 0.00 16.00 0.00 0.00 1.50 0.00 21.00
79 11.75 0.00 0.00 1.75 0.00 4.50 1.00 0.00 0.00 0.00 19.00
80 4.50 0.00 0.00 0.00 0.00 14.00 0.50 0.00 0.00 0.00 19.00
81 7.00 0.00 6.50 4.50 0.00 1.50 1.00 0.00 0.00 0.00 20.50
82 0.00 0.00 7.00 1.00 0.00 11.00 0.00 0.00 0.00 0.00 19.00
83 7.75 0.00 4.50 1.00 0.00 2.50 3.25 0.00 0.00 0.00 19.00
84 8.25 0.00 1.00 0.25 0.00 6.00 0.00 0.00 3.50 0.00 19.00
85 9.00 0.00 0.00 0.00 0.00 11.00 0.00 0.00 1.00 0.00 21.00
86 10.00 0.00 0.00 1.00 0.00 9.00 0.00 0.00 0.00 0.00 20.00
87 8.75 0.00 0.00 0.00 0.00 8.75 0.00 0.00 1.50 0.00 19.00
88 14.50 0.00 1.50 0.00 0.00 1.00 0.00 0.00 0.00 0.00 17.00
89 2.50 0.00 12.00 1.00 0.00 2.50 0.00 0.00 2.00 0.00 20.00
90 13.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 4.00 0.00 18.00
91 6.25 0.00 9.00 0.00 0.00 1.00 3.75 0.00 0.00 0.00 20.00
92 12.00 0.00 3.00 0.00 0.00 2.50 0.00 0.00 0.00 0.00 17.50
93 12.00 0.00 7.50 0.00 0.00 0.50 0.00 0.00 0.00 0.00 20.00
94 14.25 0.00 1.25 2.00 0.00 0.50 0.00 0.00 0.00 0.00 18.00
95 10.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 18.00
96 0.00 0.00 0.00 0.00 0.00 10.50 0.00 0.00 0.00 0.00 10.50
97 0.00 0.00 0.00 0.00 0.00 8.50 0.00 0.00 0.00 0.00 8.50
98 3.50 0.00 0.00 1.50 0.00 5.50 0.00 0.00 0.00 0.00 10.50
99 5.00 0.00 0.00 0.00 0.00 3.50 0.00 0.00 0.00 0.00 8.50
100 8.00 0.00 0.00 2.00 0.00 0.50 0.00 0.00 0.00 0.00 10.50
101 6.25 0.00 0.00 0.75 0.00 2.00 0.00 0.00 0.00 0.00 9.00
102 5.75 0.00 0.00 0.00 0.00 1.75 3.00 0.00 0.00 0.00 10.50
103 9.00 0.00 0.00 1.00 0.00 0.50 0.00 0.00 0.00 0.00 10.50
104 1.00 0.00 0.00 0.00 0.00 9.50 0.00 0.00 0.00 0.00 10.50
105 7.00 0.00 0.00 3.00 0.00 0.50 0.00 0.00 0.00 0.00 10.50
106 7.00 0.00 0.00 1.00 0.00 0.50 0.00 0.00 0.00 0.00 8.50
107 1.50 0.00 0.00 0.00 0.00 3.25 0.00 0.00 3.75 0.00 8.50
108 0.25 0.00 0.00 1.25 0.00 6.00 0.00 0.00 0.00 4.00 11.50
109 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.00 5.00 5.50
110 5.50 0.00 0.00 3.00 0.00 2.00 0.00 0.00 0.00 0.00 10.50
111 5.00 0.00 0.00 0.00 0.00 1.75 0.00 0.00 3.75 0.00 10.50
112 4.50 0.00 0.00 0.00 0.00 0.50 0.00 0.00 5.50 0.00 10.50
113 7.50 0.00 0.00 0.00 0.00 0.50 0.00 0.00 1.50 0.00 9.50
114 5.50 0.00 0.00 2.50 0.00 0.50 0.00 0.00 0.00 0.00 8.50
115 4.50 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 10.50
116 9.25 0.00 0.00 0.25 0.00 0.50 0.00 0.00 0.00 0.00 10.00
117 4.00 0.00 0.00 1.00 0.00 4.50 0.00 0.00 1.00 0.00 10.50
118 8.50 0.00 0.00 0.50 0.00 0.50 0.50 0.00 1.00 0.00 11.00
119 6.00 0.00 0.00 3.50 0.00 0.00 0.75 0.00 1.75 0.00 12.00
120 6.00 0.00 0.00 0.50 0.00 0.50 0.00 1.50 0.00 0.00 8.50
121 5.75 0.00 1.00 0.50 0.00 0.50 0.00 1.25 0.00 0.00 9.00
122 5.50 0.00 0.00 1.75 0.00 3.00 0.25 0.00 0.00 0.00 10.50
123 8.25 0.00 0.00 1.25 0.50 0.00 0.50 0.00 0.00 0.00 0.00 10.50
124 0.50 0.00 0.00 0.00 0.00 0.00 5.50 0.00 0.00 0.00 4.50 10.50
125 4.50 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.00 4.00 0.00 9.00
126 7.50 0.00 0.00 0.50 0.50 0.00 0.50 1.50 0.00 0.00 0.00 10.50
127 5.75 0.00 0.00 1.75 0.75 0.00 1.25 0.00 0.00 0.00 0.00 9.50
128 2.00 0.00 3.50 0.00 0.00 0.00 2.00 0.00 0.00 1.00 0.00 8.50
129 5.00 0.00 0.00 1.00 0.25 0.00 0.75 0.00 0.00 3.50 0.00 10.50
130 5.00 0.00 0.00 0.00 1.25 0.00 4.25 0.00 0.00 0.00 0.00 10.50
131 6.25 0.00 0.00 0.00 0.25 0.00 1.50 0.50 0.00 0.00 0.00 8.50
132 3.50 0.00 0.00 0.50 0.50 0.00 3.50 0.50 0.00 0.00 0.00 8.50
133 5.25 0.00 0.00 0.00 0.75 0.00 3.50 0.00 0.00 0.00 0.00 9.50
134 6.25 0.00 0.00 1.50 0.25 0.00 1.50 0.00 0.00 0.00 0.00 9.50
135 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 8.00
136 0.75 0.00 0.00 0.00 1.00 0.00 11.75 0.00 0.00 0.00 0.00 13.50
137 7.75 0.00 0.00 3.00 1.50 0.00 1.25 0.00 0.00 0.00 0.00 13.50
138 3.25 0.00 0.00 1.00 1.25 0.00 3.00 0.00 0.00 0.00 0.00 8.50
139 7.50 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 8.50
140 5.00 0.00 0.00 3.00 1.25 0.00 1.75 0.00 0.00 0.00 0.00 11.00
141 4.50 0.00 0.00 0.00 1.50 0.00 3.50 0.00 0.00 1.00 0.00 10.50
142 6.00 1.50 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 8.50
143 0.00 0.00 0.00 0.00 0.00 0.00 3.50 0.00 0.00 0.00 6.00 9.50
144 0.00 0.00 0.00 2.75 1.00 0.00 7.25 0.00 0.00 0.00 0.00 11.00
145 5.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00 3.50 0.00 10.50
146 4.25 0.00 0.00 2.75 0.75 0.00 2.25 0.00 0.00 0.00 0.00 10.00
147 0.00 6.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 12.00
148 6.75 0.00 0.00 0.00 1.75 0.00 0.50 0.00 0.00 0.00 0.00 9.00
149 4.00 0.00 3.50 0.00 0.50 0.00 0.50 0.00 0.00 0.00 0.00 8.50
150 5.00 0.00 2.50 0.00 2.00 0.00 1.00 0.00 0.00 0.00 0.00 10.50
151 3.00 0.00 0.00 0.00 0.00 0.00 7.50 0.00 0.00 0.00 0.00 10.50
152 5.50 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.00 2.50 0.00 8.50
153 0.50 0.00 0.00 0.00 0.00 0.00 0.50 7.50 0.00 0.00 0.00 8.50
154 2.00 0.00 0.00 0.00 2.50 0.00 6.00 0.00 0.00 0.00 0.00 10.50
155 9.00 0.00 0.00 0.00 0.00 0.00 0.50 0.00 1.00 0.00 0.00 10.50
156 1.50 7.50 0.00 0.00 0.25 0.00 3.25 0.00 0.00 0.00 0.00 12.50
157 4.50 0.00 0.00 0.50 0.75 0.00 2.75 0.00 0.00 0.00 0.00 8.50
158 7.50 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 8.50
159
160
161
162
163
164

insert rows above here to add data


934.50 34.50 324.50 19.50 129.00 3.00 567.75 79.75 8.75 278.50 93.25 2473.00
w =workday 0 37.8% 1.4% 13.1% 0.8% 5.2% 0.1% 23.0% 3.2% 0.4% 11.3% 3.8%
s =saturday/ sunday 0
r =rain outs 0
Total scheduled shifts 0

File: 593040949.xls Date: 05/19/2022


Page 31 of 35
Tab: Digging Rig Combined Efficiency Time: 22:36:45
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Hydromill
Bartz

Till Qty Rock Qty ACTUAL AVG BUDGET PANEL EFFICIENCY


curr cumm curr cumm curr cumm cumm curr cumm Production NON PRODUCTIVE TOTAL Comments Teeth Shanks
Shift type date sf sf sf sf sf sf sf/day sf/day sf Prod Digging Chisel Rock Desand + JC Move Set/Up Teeth/Shanks IDLE Time Rig DT Plant DT Obstructions Delay (Others) (HOURS) Replaced Broken

0 65
1 w 4-Jan-07 12 12 28.8 28.8 40.8 40.8 40.8 65 65 LE7 2.50 3.00 1.50 0.75 1.25 3.00 12.00 Sotres shaker bolts loose, Mill motor bolts loose 50
2 w 5-Jan-07 0.0 12 0.0 28.8 0 40.8 20.4 65 130 LE7 0.00 9.50 1.00 10.50 30 mins preactivity meeting
3 s 6-Jan-07 0.0 12 0.0 28.8 0 40.8 13.6 65 195 LE7 0.00 0.50 5.00 5.00 10.50 Hydraulic motor, mission pump & mixing plant
4 w 8-Jan-07 28.0 40 40 68.8 68 108.8 27.2 65 260 LE7 2.50 1.50 7.50 11.50 Generator & Sotres 83
5 w 9-Jan-07 0.0 40 26.4 95.2 26.4 135.2 27.0 65 325 LE7 3.75 4.25 0.25 1.00 1.25 10.50 Sotres Problem 91
6 w 10-Jan-07 37.5 77.5 48.63 143.8 86.13 221.3 36.9 65 390 LE7 6.50 5.50 0.50 12.50 84
7 w 11-Jan-07 0.0 77.5 21 164.8 21 242.3 34.6 65 455 LE7 2.50 6.75 0.75 0.50 10.50 Hydraulic filter changed 97
8 w 12-Jan-07 0.0 77.5 0 164.8 0 242.3 30.3 65 520 STANDBY 0.00 0.50 9.00 9.50 Concrete Placement - Waiting on LE3 Clam to Finish
9 s 13-Jan-07 0.0 77.5 0 164.8 0 242.3 26.9 65 585 STANDBY 0.00 8.50 8.50 Waiting for clamshell to finish Obstruction LE3 100
10 w 15-Jan-07 0.0 77.5 44.24 209.1 44.24 286.6 28.7 65 650 LE3 6.50 2.25 1.25 0.50 1.00 11.50 37
11 w 16-Jan-07 0.0 77.5 10.4 219.5 10.4 297.0 27.0 65 715 LE3 1.50 1.25 6.75 2.00 11.50 Hydraulic motor changed 30
12 w 17-Jan-07 0.0 77.5 0 219.5 0 297.0 24.7 65 780 STANDBY 0.00 0.50 8.00 8.50 Clean Tanks on Sotres
13 w 18-Jan-07 2.7 80.17 68.53 288.0 71.2 368.2 28.3 65 845 LE3 6.50 1.75 1.00 1.00 0.50 10.75 Clean Tanks on Sotres 115 2
14 w 19-Jan-07 0 80.17 54.4 342.4 54.4 422.6 30.2 65 910 LE3 5.50 5.75 1.00 1.75 1.00 15.00 78
15 w 22-Jan-07 0 80.17 0 342.4 0 422.6 28.2 65 975 C3 0.75 1.00 0.50 0.50 0.25 0.50 5.75 2.25 11.50 Problem with Sotres 22
16 w 23-Jan-07 8 88.17 0 342.4 8 430.6 26.9 65 1040 C3 0.00 0.25 0.50 1.75 9.50 12.00 Rectifying C3 due to obstructions 13
17 w 24-Jan-07 27.6 115.77 0 342.4 27.6 458.2 27.0 65 1105 LE3 0.25 0.75 0.25 0.50 9.25 11.00 Rectifying C3 due to obstructions 20 3
18 w 25-Jan-07 94 209.77 0 342.4 94 552.2 30.7 65 1170 C3 6.00 1.25 0.50 3.75 11.50 Rectifying C3 due to obstructions 111 11
19 w 26-Jan-07 0 209.77 25.6 368.0 25.6 577.8 30.4 65 1235 C3 5.00 0.75 0.75 2.00 8.50 9 shanks broke 35 9
20 s 27-Jan-07 0 209.77 7.7 375.7 7.7 585.5 29.3 65 1300 C3 4.00 0.25 0.50 2.00 0.50 1.25 8.50 Chiseling due to obstruction 31
21 w 29-Jan-07 0 209.77 39.6 415.3 39.6 625.1 29.8 65 1365 C3 5.50 1.25 3.25 10.00 Digging at C3, Changed wheels 79 5
22 w 30-Jan-07 0 209.77 33 448.3 33 658.1 29.9 65 1430 C3 6.00 0.25 0.25 2.75 1.25 10.50 Pump Froze, Shanks caught in wheels, Broke Piston Inclination Plate 18 7
23 w 31-Jan-07 82.23 292 8.35 456.7 90.58 748.7 32.6 65 1495 C3 3.00 3.50 0.50 0.25 3.25 10.50 Welding shanks, Waiting for Rig#2 to chisel and maintenance 38
24 w 1-Feb-07 0 292 21.06 477.7 21.06 769.7 32.1 65 1560 C3 2.50 7.50 0.50 10.50 Waiting for clamshell to chisel at C3
25 w 2-Feb-07 0 292 31.09 508.8 31.09 800.8 32.0 65 1625 C3 4.50 4.50 0.25 1.00 0.25 10.50 Maintenance, plant froze, Chiseling due to Obstructions 13
26 w 5-Feb-07 30.8 322.8 10.48 519.3 41.28 842.1 32.4 65 1690 C3/ LE5 3.25 0.50 0.75 5.00 3.50 13.00 Plant Froze, Bentonite Line froze
27 w 6-Feb-07 44.17 366.97 36.68 556.0 80.85 922.9 34.2 65 1755 LE5 7.25 0.50 0.25 2.75 10.75 Changed teeth, new type 152
28 w 7-Feb-07 0 366.97 18.46 574.4 18.46 941.4 33.6 65 1820 LE5 7.00 0.25 1.00 1.75 2.00 12.00 86
29 w 8-Feb-07 0 366.97 0 574.4 0 941.4 32.5 65 1885 LE5 3.00 0.50 0.25 0.25 6.5 10.50 Broke tilt plait cylinder, desanding at LE5 44
30 w 9-Feb-07 0 366.97 8 582.4 8 949.4 31.6 65 1950 LE1 3.75 0.50 0.50 3.75 8.50 Safety meetg, accumulator froze, broke hydraulic hose 17
31 w 12-Feb-07 0 366.97 24.3 606.7 24.3 973.7 31.4 65 2015 LE1 4.00 0.25 0.25 1.50 3.75 0.75 10.50 Problem with mission pump, broke piston, cleaned bite with bucket 27
32 w 13-Feb-07 33.6 400.57 25.95 632.7 59.55 1033.2 32.3 65 2080 LE1/ CL1 1.50 2.50 0.75 0.25 4.75 0.75 10.50 Maintenance, standby due to LE1 cage lift, Desanding LE1, Joint Cleaning 5
33 w 14-Feb-07 38 438.57 72.8 705.5 110.8 1144.0 34.7 65 2145 CL1 5.25 1.00 0.25 0.25 0.50 1.75 9.00 Maintainence, steel obstruction 8 1
34 w 15-Feb-07 27 465.57 7.50 713.0 34.5 1178.5 34.7 65 2210 CL!/C10 4.75 1.25 2.75 1.25 10.00 Maintainence, Broke pipe return, loss of bentonite
35 w 16-Feb-07 25.33 490.9 86.63 799.6 111.96 1290.5 36.9 65 2275 C10 5.75 1.5 0.25 3.00 10.50 Connecting Pipe and Hose Bentonite, Blow out lines 19
36 s 17-Feb-07 0 490.9 24.93 824.5 24.93 1315.4 36.5 65 2340 C10 6.50 2.00 8.50 Broke accumulator on hydromill
37 w 20-Feb-07 0 490.9 25.93 850.5 25.93 1341.4 36.3 65 2405 C10/ LE6 0.75 1.00 1.25 0.25 3.25 0.50 3.50 10.50 Frozen pump, Standby for cleaning, Loss of Bentonite approx 8000 gal
38 w 21-Feb-07 0 490.9 26.93 877.4 26.93 1368.3 36.0 65 2470 CL1 1.00 2.00 0.25 0.25 4.75 0.25 8.50 Standby waiting for Rig 1 to chisel. 15
Joint Cleaning and Desanding, Standby as no work on LE6 due to panel
39 w 22-Feb-07 0 490.9 0 877.4 0 1368.3 35.1 65 2535 CL1 0.00 2.00 0.50 8.00 10.50 collapse from obstruction
Joint Cleaning and Desanding, Standby as no work on LE6 due to panel
40 w 23-Feb-07 0 490.9 0 877.4 0 1368.3 34.2 65 2600 CL1/LE6 0.00 1.50 0.50 0.50 8.00 10.50 collapse
41 w 26-Feb-07 216 706.9 0 877.4 216 1584.3 38.6 65 2665 LE6 / C5 5.25 0.75 1.50 3.00 10.50 Critical path delay move from LE6 to C5, Maintenance 71 2
42 w 27-Feb-07 0 706.9 77.4 954.8 77.4 1661.7 39.6 65 2730 LG1 4.50 0.75 2.25 1.00 2.00 10.50 Problem with accumulator 51 1
43 w 28-Feb-07 0 706.9 65.5 1020.3 65.5 1727.2 40.2 65 2795 LG1 4.75 0.50 0.50 0.25 0.50 2.00 8.50 Extra rock excavated, maintenance cut slurry hose 21
44 w 1-Mar-07 39.2 746.1 26.4 1046.7 65.6 1792.8 40.7 65 2860 LG1/ C5 5.75 1.00 0.50 1.00 2.25 10.50 Desanding LG1, Connected bentonite hose, grease motors 43 3
45 w 2-Mar-07 0 746.1 28.8 1075.5 28.8 1821.6 40.5 65 2925 C5 4.00 0.25 0.25 0.25 1.75 4.00 10.50 Problem with AVARO & counterwts, problem with bent line 15
46 w 5-Mar-07 0 746.1 74 1149.5 74 1895.6 41.2 65 2990 C5 6.00 0.25 0.75 2.00 9.00 digging rock, maintenance 39 4
47 w 6-Mar-07 0 746.1 12 1161.5 12 1907.6 40.6 65 3055 C5 2.00 1.75 6.75 10.50 Change wheels, pump froze, maintenance 63
48 w 7-Mar-07 0 746.1 91.2 1252.7 91.2 1998.8 41.6 65 3120 C5 7.25 0.50 1.25 1.00 2.00 12.00 maintenance, change piston, dug added rock, 7.75 hrs CP delay 59 1
49 w 8-Mar-07 0 746.1 24 1276.7 24 2022.8 41.3 65 3185 C5 6.25 0.75 0.50 5.00 12.50 490 SF of soil, digging added Till & Rock, 7.5 hrs of CP Delay 58 1
50 w 9-Mar-07 224.7 970.8 20.5 1297.2 245.2 2268.0 45.4 65 3250 C5 7.25 0.75 4.00 12.00 maintenance, broke piston plate, 1.75 hrs CP Delay (Added Rock) 143 2
51 s 10-Mar-07 93.8 1064.6 22.75 1319.9 116.55 2384.5 46.8 65 3315 C5 7.75 0.75 3.50 12.00 repairs, broke pipe exit pump, 3 hrs CP Delay (Added Rock) 107
52 w 12-Mar-07 0 1064.6 0 1319.9 0 2384.5 45.9 65 3380 C5 0.00 2.50 0.25 5.75 8.50 Desanding/joint cleaning at C5, broke powerpack pump
53 w 13-Mar-07 0 1064.6 0 1319.9 0 2384.5 45.0 65 3445 — 0.00 8.50 8.50 work on repairing the powerpack pump
54 w 14-Mar-07 0 1064.6 0 1319.9 0 2384.5 44.2 65 3510 — 0.00 8.50 8.50 work on repairing the powerpack pump
55 w 15-Mar-07 0 1064.6 0 1319.9 0 2384.5 43.4 65 3575 — 0.00 8.50 8.50 work on repairing the powerpack pump
56 w 16-Mar-07 0 1064.6 0 1319.9 0 2384.5 42.6 65 3640 — 0.00 8.50 8.50 work on repairing the powerpack pump
57 s 17-Mar-07 0 1064.6 0 1319.9 0 2384.5 41.8 65 3705 — 0.00 0.50 8.00 8.50 work on repairing the powerpack pump
58 w 19-Mar-07 0 1064.6 4 1323.9 4 2388.5 41.2 65 3770 LE2 1.50 1.00 0.50 9.00 12.00 work on repairing the powerpack pump
59 w 20-Mar-07 0 1064.6 40 1363.9 40 2428.5 41.2 65 3835 LE2 2.50 0.25 0.75 4.00 2.50 2.00 12.00 Pump stopped, waiting while rig #2 chiseled, problem with sotres 45
60 w 21-Mar-07 0 1064.6 28.8 1392.7 28.8 2457.3 41.0 65 3900 LE2/LE6 4.25 1.50 0.75 0.75 2.75 10.00 Cleaning & Desanding LE2, Standby for area 63
61 w 22-Mar-07 0 1064.6 74.4 1467.1 74.4 2531.7 41.5 65 3965 LE6 9.25 0.25 0.75 1.25 1.00 12.50 No pressure in right wheel, Change fuel filter 26
62 w 23-Mar-07 0 1064.6 28.75 1495.9 28.75 2560.5 41.3 65 4030 LE6 2.50 0.50 0.25 5.25 8.50 Main shaft on powerpack pump broke down 6
63 65 4095
64 65 4160
65 65 4225
66 65 4290
67 65 4355
68 65 4420
69 65 4485
70 65 4550

insert rows above here to add data


209.75 38.75 19.00 23.50 42.25 38.75 153.25 46.75 27.50 47.00 646.50 2328 52
w =workday 56 32.4% 6.0% 2.9% 3.6% 6.5% 6.0% 23.7% 7.2% 4.3% 7.3%
s =saturday/ sunday 6 Average Teeth per SF (Till + Rock) #DIV/0!
r =rain outs 0 Average Teeth per SF (Till) #DIV/0!
Total scheduled shifts 62 Average Teeth per SF (Rock) #DIV/0!

File: 593040949.xls Date: 05/19/2022


Page 32 of 35
Tab: HydroMill # 1 Time: 22:36:46
Kiewit / TreviIcos JV
East Bathtub Slurry Walls

WTC - East Bathtub Slurry Walls


Production Charts for Hydromill
Bartz
MANHOUR FACTORS
Production Production w/ KT DT Production overall BUDGET TILL ROCK COMBINED
Productive cumm Prod instant ave instant Productive cumm Prod Prod Ave Prod Productive cumm Prod Prod Ave Prod Productive mh/sf mh/sf mh/sf
Shift type date rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours rig hours sf/hr sf/hr rig hours budget curr to date budget curr to date budget curr to date

0
1 w 4-Jan-07 2.50 2.50 16.3 16.3 12.00 12.00 3.4 3.4 12.00 12.00 3.4 3.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
2 w 5-Jan-07 0.00 2.50 0.0 16.3 10.50 22.50 0.0 1.8 10.50 22.50 0.0 1.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
3 s 6-Jan-07 0.00 2.50 0.0 16.3 10.50 33.00 0.0 1.2 10.50 33.00 0.0 1.2 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
4 w 8-Jan-07 2.50 5.00 27.2 21.8 11.50 44.50 5.9 2.4 11.50 44.50 5.9 2.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
5 w 9-Jan-07 8.00 13.00 3.3 10.4 10.50 55.00 2.5 2.5 10.50 55.00 2.5 2.5 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
6 w 10-Jan-07 12.00 25.00 7.2 8.9 12.50 67.50 6.9 3.3 12.50 67.50 6.9 3.3 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
7 w 11-Jan-07 9.25 34.25 2.3 7.1 10.50 78.00 2.0 3.1 10.50 78.00 2.0 3.1 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
8 w 12-Jan-07 0.00 34.25 0.0 7.1 0.50 78.50 0.0 3.1 9.50 87.50 0.0 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
9 s 13-Jan-07 0.00 34.25 0.0 7.1 0.00 78.50 0.0 3.1 8.50 96.00 0.0 2.5 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
10 w 15-Jan-07 6.50 40.75 6.8 7.0 10.50 89.00 4.2 3.2 11.50 107.50 3.8 2.7 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
11 w 16-Jan-07 1.50 42.25 6.9 7.0 9.50 98.50 1.1 3.0 11.50 119.00 0.9 2.5 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
12 w 17-Jan-07 0.00 42.25 0.0 7.0 8.50 107.00 0.0 2.8 8.50 127.50 0.0 2.3 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
13 w 18-Jan-07 6.50 48.75 11.0 7.6 9.25 116.25 7.7 3.2 10.75 138.25 6.6 2.7 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
14 w 19-Jan-07 11.25 60.00 4.8 7.0 14.00 130.25 3.9 3.2 15.00 153.25 3.6 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
15 w 22-Jan-07 1.75 61.75 0.0 6.8 9.25 139.50 0.0 3.0 11.50 164.75 0.0 2.6 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
16 w 23-Jan-07 0.00 61.75 0.0 7.0 2.50 142.00 3.2 3.0 12.00 176.75 0.7 2.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
17 w 24-Jan-07 0.25 62.00 110.4 7.4 1.75 143.75 15.8 3.2 11.00 187.75 2.5 2.4 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
18 w 25-Jan-07 6.00 68.00 15.7 8.1 7.75 151.50 12.1 3.6 11.50 199.25 8.2 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
19 w 26-Jan-07 5.00 73.00 5.1 7.9 8.50 160.00 3.0 3.6 8.50 207.75 3.0 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
20 s 27-Jan-07 4.00 77.00 1.9 7.6 7.25 167.25 1.1 3.5 8.50 216.25 0.9 2.7 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
21 w 29-Jan-07 5.50 82.50 7.2 7.6 10.00 177.25 4.0 3.5 10.00 226.25 4.0 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
22 w 30-Jan-07 6.00 88.50 5.5 7.4 10.50 187.75 3.1 3.5 10.50 236.75 3.1 2.8 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
23 w 31-Jan-07 6.50 95.00 13.9 7.9 10.50 198.25 8.6 3.8 10.50 247.25 8.6 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
24 w 1-Feb-07 10.00 105.00 2.1 7.3 10.50 208.75 2.0 3.7 10.50 257.75 2.0 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
25 w 2-Feb-07 9.00 114.00 3.5 7.0 10.50 219.25 3.0 3.7 10.50 268.25 3.0 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
26 w 5-Feb-07 3.25 117.25 12.7 7.2 13.00 232.25 3.2 3.6 13.00 281.25 3.2 3.0 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
27 w 6-Feb-07 7.25 124.50 11.2 7.4 10.75 243.00 7.5 3.8 10.75 292.00 7.5 3.2 6.50 0.200 0.00 0.00 1.000 0.00 0.00 0.000 0.00 0.00
28 w 7-Feb-07 7.00 131.50 2.6 7.2 12.00 255.00 1.5 3.7 12.00 304.00 1.5 3.1 6.50 0.200 0.00 1.000 0.00 0.00
29 w 8-Feb-07 3.00 134.50 0.0 7.0 10.50 265.50 0.0 3.5 10.50 314.50 0.0 3.0 6.50 0.200 0.00 1.000 0.00 0.00
30 w 9-Feb-07 3.75 138.25 2.1 6.9 8.50 274.00 0.9 3.5 8.50 323.00 0.9 2.9 6.50 0.200 0.00 1.000 0.00 0.00
31 w 12-Feb-07 4.00 142.25 6.1 6.8 10.50 284.50 2.3 3.4 10.50 333.50 2.3 2.9 6.50 0.200 0.00 1.000 0.00 ###
32 w 13-Feb-07 1.50 143.75 39.7 7.2 10.50 295.00 5.7 3.5 10.50 344.00 5.7 3.0 6.50 0.200 0.00 1.000 0.00
33 w 14-Feb-07 5.25 149.00 21.1 7.7 7.25 302.25 15.3 3.8 9.00 353.00 12.3 3.2 6.50 0.200 0.00 1.000 0.00
34 w 15-Feb-07 4.75 153.75 7.3 7.7 8.75 311.00 3.9 3.8 10.00 363.00 3.5 3.2 6.50 0.00 0.00
35 w 16-Feb-07 5.75 159.50 19.5 8.1 10.50 321.50 10.7 4.0 10.50 373.50 10.7 3.5 6.50 0.00 0.00
36 s 17-Feb-07 6.50 166.00 3.8 7.9 8.50 330.00 2.9 4.0 8.50 382.00 2.9 3.4 6.50 0.00 0.00
37 w 20-Feb-07 0.75 166.75 34.6 8.0 7.00 337.00 3.7 4.0 10.50 392.50 2.5 3.4 6.50 0.00 0.00
38 w 21-Feb-07 1.00 167.75 26.9 8.2 8.50 345.50 3.2 4.0 8.50 401.00 3.2 3.4 6.50 0.00 0.00

39 w 22-Feb-07 0.00 167.75 0.0 8.2 2.50 348.00 0.0 3.9 10.50 411.50 0.0 3.3 6.50 0.00 0.00

40 w 23-Feb-07 0.00 167.75 0.0 8.2 2.50 350.50 0.0 3.9 10.50 422.00 0.0 3.2 6.50 0.00 0.00
41 w 26-Feb-07 5.25 173.00 41.1 9.2 7.50 358.00 28.8 4.4 10.50 432.50 20.6 3.7 6.50 0.00 0.00
42 w 27-Feb-07 4.50 177.50 17.2 9.4 10.50 368.50 7.4 4.5 10.50 443.00 7.4 3.8 6.50 0.00
43 w 28-Feb-07 4.75 182.25 13.8 9.5 8.50 377.00 7.7 4.6 8.50 451.50 7.7 3.8 6.50
44 w 1-Mar-07 5.75 188.00 11.4 9.5 10.50 387.50 6.2 4.6 10.50 462.00 6.2 3.9 6.50
45 w 2-Mar-07 4.00 192.00 7.2 9.5 10.50 398.00 2.7 4.6 10.50 472.50 2.7 3.9 6.50
46 w 5-Mar-07 6.00 198.00 12.3 9.6 9.00 407.00 8.2 4.7 9.00 481.50 8.2 3.9 6.50
47 w 6-Mar-07 2.00 200.00 6.0 9.5 10.50 417.50 1.1 4.6 10.50 492.00 1.1 3.9 6.50
48 w 7-Mar-07 7.25 207.25 12.6 9.6 12.00 429.50 7.6 4.7 12.00 504.00 7.6 4.0 6.50
49 w 8-Mar-07 6.25 213.50 3.8 9.5 12.50 442.00 1.9 4.6 12.50 516.50 1.9 3.9 6.50
50 w 9-Mar-07 7.25 220.75 33.8 10.3 12.00 454.00 20.4 5.0 12.00 528.50 20.4 4.3 6.50
51 s 10-Mar-07 7.75 228.50 15.0 10.4 12.00 466.00 9.7 5.1 12.00 540.50 9.7 4.4 6.50
52 w 12-Mar-07 0.00 228.50 0.0 10.4 8.50 474.50 0.0 5.0 8.50 549.00 0.0 4.3 6.50
53 w 13-Mar-07 0.00 228.50 0.0 10.4 8.50 483.00 0.0 4.9 8.50 557.50 0.0 4.3 6.50
54 w 14-Mar-07 0.00 228.50 0.0 10.4 8.50 491.50 0.0 4.9 8.50 566.00 0.0 4.2 6.50
55 w 15-Mar-07 0.00 228.50 0.0 10.4 8.50 500.00 0.0 4.8 8.50 574.50 0.0 4.2 6.50
56 w 16-Mar-07 0.00 228.50 0.0 10.4 8.50 508.50 0.0 4.7 8.50 583.00 0.0 4.1 6.50
57 s 17-Mar-07 0.00 228.50 0.0 10.4 8.50 517.00 0.0 4.6 8.50 591.50 0.0 4.0 6.50
58 w 19-Mar-07 1.50 230.00 2.7 10.4 12.00 529.00 0.3 4.5 12.00 603.50 0.3 4.0 6.50
59 w 20-Mar-07 2.50 232.50 16.0 10.4 12.00 541.00 3.3 4.5 12.00 615.50 3.3 3.9 6.50
60 w 21-Mar-07 4.25 236.75 6.8 10.4 10.00 551.00 2.9 4.5 10.00 625.50 2.9 3.9 6.50
61 w 22-Mar-07 9.25 246.00 8.0 10.3 12.50 563.50 6.0 4.5 12.50 638.00 6.0 4.0 6.50
62 w 23-Mar-07 2.50 248.50 11.5 10.3 8.50 572.00 3.4 4.5 8.50 646.50 3.4 4.0 6.50
63 0.00 248.50 0.0 0.0 0.00 572.00 0.0 0.0 0.00 646.50 0.0 0.0 6.50
64 0.00 248.50 0.0 0.0 0.00 572.00 0.0 0.0 0.00 646.50 0.0 0.0 6.50
65 0.00 248.50 0.0 0.0 0.00 572.00 0.0 0.0 0.00 646.50 0.0 0.0 6.50
66 6.50
67 6.50
68 6.50
69 6.50
70 6.50

insert rows above here to add data

w =workday
s =saturday/ sunday
r =rain outs
Total scheduled shifts

File: 593040949.xls Date: 05/19/2022


Page 33 of 35
Tab: HydroMill # 1 Time: 22:36:46
Hydromill #1: Availability 69% Hydromill #2: Availability
(1/4 to 3/23) 86%
(3/26 to 7/21)

Delay (Others) Delay (Others)


7% Obstructions 7%
Obstructions 3%
4%
Plant DT
Plant DT 4%
7%

Prod Digging
32% Rig DT Prod Digging
16% 39%

Rig DT IDLE Time


24% 11%

Chisel Rock
6% Chisel Rock
Desand + JC 2%
3% Teeth/Shanks Desand + JC
Move Set/Up Move Set/Up 7%
IDLE Time Teeth/Shanks 4% 7%
6% 7%

Maintenance Factor: 3.27 Maintenance Factor: 2.33


Kiewit / TreviIcos RIG EFFICIENCIES
Thru 04/23/07
WTC Slurry Walls TO DATE

Digging Rig #1 (Patterson) Digging Rig #2 (Simonson)


Rig DT Plant DT Rig DT Plant DT
3% 2% 5% 0%

Prod Digging
37%
IDLE Time
IDLE Time Prod Digging
Teeth/Shanks 22%
30% 43%
Teeth/Shanks 0%
0%
Move/Setup
Move/Setup 5%
7% Joint Clean
Chisel Blder
3%
Joint Clean Chisel Blder 0%
Chisel Bedrock Chisel Bedrock
3% 8% 2% 28%

HydroMill (Bartz) Combined Digging Rigs


Plant DT
Rig DT Plant DT
4%
4% 0%

Rig DT
17%
Prod Digging IDLE Time
27% Prod Digging
43%
Teeth/Shanks 44%
IDLE Time 0%
12%
Move/Setup
Teeth/Shanks
6%
6%
Joint Clean
Move Set/Up Chisel Rock
Desand + JC 1% Chisel Bedrock Chisel Blder
7% 2%
8% 15% 2%

File: 593040949.xls