NTPC LIMITED

(A Government of India Enterprise)

VOLUME – II
SECTION I

SPECIAL PURCHASE CONDITIONS

DOC NO: SSC C&M-PU-ST –VOL II (SEC I) REV 0 DATED 30.04.2019


SPECIAL PURCHASE CONDITIONS (SPC)
((The conditions in this section are to be read in conjunction with the General Purchase Conditions &
Instruction to Bidders. In case of any contradictions, the conditions mentioned herein shall supersede
any other related conditions anywhere else in this tender document))
NCPS STAGE#1 WAGON TIPPLER#1 THRUSTER BRAKE ASSEMBLY FOR DADRI -
9900237860
Special Purchase Conditions – Volume II Section I Part - A

1.0 TYPE OF BIDDING Single Stage Two Envelope Bidding Basis

The Price Quoted shall be firm till the completion of


2.0 PRICE BASIS
delivery and preferably on F.O.R. Destination Site basis
{ITB Clause 12.0 & GPC as mentioned at Para 5.0 below.
Clause 16.0}
Detailed price break up should be uploaded in Finance
Cover as per the conditions of the Price Bid - BOQ excel
sheet.

Bidder has to quote the unit basic price inclusive of


P&F, Freight, Insurance Charges and any other charges
in BOQ Excel Sheet. No separate payment shall be
entertained towards P&F, Freight and Insurance
Charges or any other charges.

In case bidder has indicated (Zero) or left blank in GST,


the same shall be treated as included in the Bid Price.

The evaluation shall be done on FOR site i.e. landed


cost basis with cost compensation for deviations if any.
The loading will be done as per the procedure
mentioned at Clause No 10 of SPC.
3.0 JURISDICTION Courts of Delhi, INDIA

4.0 PLACE OF ARBITRATION Delhi, INDIA


{GPC Clause 14.1.3}

5.0 DELIVERY
Within 06 Months from the date of PO.
SCHEDULE/COMPLETION
SCHEDULE/ DELIVERY The Delivery Location:

594978264.docx Page 2 of 4
Dadri Thermal Power Project
LOCATION
P.O. VIDYUT NAGAR
{GPC Clause 19.0} DADRI
Uttar Pradesh
201008
Consignee: Manager/Senior Manager (Stores).

6.0 PAYMENT TERMS 100% payment within 30 days after receipt and
acceptance of the material at NTPC Site. Inspection will
{GPC Clause 19.0}
be cleared within 14 days from the date of receipt of
material along with all required documents as
mentioned below.
a. Original GST invoice
b. L.R./G.R copy
c. Fitment/interchangeability certificate
Note:
Payment Procedure shall be as per Annexure I to SPC.

7.0 CONTRACT Not Applicable


PERFORMANCE
GUARANTEE (CPG )
{GPC Clause 24.0}

8.0 WARRANTY / 12 Months from the date of first use or 18 Months from
GUARANTEE the date of supply whichever is earlier.
{GPC Clause 30.0}
The Guarantee/ Warranty Terms and Conditions shall
be applicable to the material supplied against the PO.
&
No separate Guarantee/ Warranty Certificate is
Fitment and required to be submitted by the Supplier along with the
Interchangeability material. The Guarantee/ Warranty terms and
condition shall be binding on the supplier.
&
Items supplied against the order shall confirm to
fitment with existing unit and should be one to one
interchangeable with existing spares.

9.0 INSPECTION Material will be inspected at NTPC Stores.

594978264.docx Page 3 of 4
{GPC Clause 33.0}

10.0 Evaluation Criteria Item Wise Evaluation.


{ITB Clause 30.0}

11.0 LIQUIDATED DAMAGES As per Clause no. 35.0 of GPC.


FOR DELAY IN EXECUTION
Applicable GST extra shall be levied on deducted LD
amount.

12.0 CONTACT PERSONS /


HEMA SUNDER TEJA KELLA
ADDRESS MANAGER (C&M)

ADDRESS NTPC Limited,


Simhadri Super Thermal Power Station
SSC, Admin Building Annex
Via Parawada, PO NTPC – Simhadri
Visakhapatnam, A.P. - 531020
Mobile No 7086041112
hemasunderteja@ntpc.co.in
E mail ID

594978264.docx Page 4 of 4