Professional Documents
Culture Documents
MAY 2022
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
5 Teyseer MARINI CS346/06 Mesaieed 24.98290 51.58117 300 AP1795 28-Jul-21 27-Jul-22 BC- Gabbro QPMC Pen Woqod Woqod
Contracting B 60/70
Company
AP01(TCC) AP1796 28-Jun-21 27-Jul-22 BC- Gabbro QPMC PG76E- Membco Membco
B 10
AP1798 28-Jul-21 27-Jul-22 WC Gabbro QPMC PG76E- Membco Membco
10
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
6 Boom AP04 MARINI P- Umm Al 25.38241 51.37975 240 AP1794 07-Jul-21 06-Jul-22 BC- Gabbro QPMC Pen Woqod Woqod
P100158 Affai A 60/70
AP1857 07-Feb-22 06-Feb-23 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
7 Boom AP05 AMMANN SIM I981 Industrial 25.176948 51.40921 210 AP1793 04-Jul-21 03-Jul-22 BC- Gabbro QPMC Pen Woqod Woqod
Area A 60/70
AP1812 08-Sep-21 07-Sep-22 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
12 MIDMAC AMMANN AZ62378 Mesaieed 24.98086 51.57834 240 AP 09-Dec-21 08-Dec-22 WC Gabbro QPMC Pen Woqod Woqod
Colas AP01 1842 60/70
AP1808 30-Aug-21 29-Aug-22 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
AP1867 17-Feb-22 16-Feb-23 WC Gabbro QPMC PG76E- Membco Membco
10
13 MIDMAC AMMANN I-884 Mesaieed 24.980609 51.578098 210 AP1827 17-Oct-21 16-Oct-22 BC- Gabbro QPMC Pen Woqod Woqod
Colas AP2 A 60/70
AP1825 12-Oct-21 11-Oct-22 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
AP1817 27-Sep-21 26-Sep-22 BC- Gabbro QPMC PG76E- Membco Membco
B 10
14 Qatar AMMANN AZ62805 Salwa I.A. 25.16785 51.44739 320 AP1818 30-Sep-21 29-Sep-22 WC Gabbro QPMC PG76E- QBC QBC
Building 10
Company
AP01 AP1811 08-Sep-21 07-Sep-22 WC Gabbro QPMC Pen Woqod Woqod
60/70
AP1801 10-Aug-21 09-Aug-22 BC- Gabbro QPMC Pen Woqod Woqod
A 60/70
AP 13-Dec-21 12-Dec-22 BC- Gabbro QPMC Pen Woqod Woqod
1845 B 60/70
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
18 QD-CPC- LINTEC 2010-15 Umm Al 25.38496 51.38190 240 AP1836 18-Nov-21 17-Nov-22 WC Gabbro QPMC PG76E- Raetex Raetex
NAF AP01 Affai 10
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
19 QD-CPC- LINTEC 2014-14 Umm Al 25.38496 51.38190 240 AP1837 23-Nov-21 22-Nov-22 BC- Gabbro QPMC Pen Woqod Woqod
NAF AP02 Affai B 60/70
AP 29-Dec-21 28-Dec-22 WC Gabbro QPMC Pen Woqod Woqod
1848 60/70
20 Al Darwish MARINI PP140006 Mesaieed 24.981326 51.582648 300 AP1822 30-Sep-21 29-Sep-22 BC- Gabbro QPMC Pen Woqod Woqod
Engineering A 60/70
AP1823 30-Sep-21 29-Sep-22 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
21 MARBU ALMIX P9066 Mesaieed 24.98186 51.57842 240 AP 09-Dec-21 08-Dec-22 BC- Gabbro QPMC PG76E- Raetex Raetex
1843 B 10
AP 09-Dec-21 08-Dec-22 WC Gabbro QPMC PG76E- Raetex Raetex
1844 10
AP1868 20-Feb-22 19-Feb-23 BC- Gabbro QPMC Pen Woqod Woqod
A 60/70
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
23 Al Sarh SPECO 08A-6009 Mesaieed 24.9817 51.57948 240 AP1879 10-Apr-22 09-Apr-23 BC- Gabbro QPMC Pen Woqod Woqod
T&C A 60/70
AP1880 10-Apr-22 09-Apr-23 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
25 Al Jaber & AMMANN AZ-65091 Mesaieed 24.983435 51.58194 240 AP1885 11-May-22 10-May-23 BC- Gabbro QPMC Pen Woqod Woqod
Partners B 60/70
AP02
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
26 United AMMANN C002- Salwa 25.17146 51.46263 160 AP1835 09-Nov-21 08-Nov-22 BC- Gabbro QPMC Pen Woqod Woqod
Construction 0180A Industrial B 60/70
Est. Area
AP1835 09-Nov-21 08-Nov-22 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
28 Bin Omran PARKER P07079 Mesaieed 24.98332 51.58487 200 AP1865 15-Feb-22 14-Feb-23 BC- Gabbro QPMC Pen Woqod Woqod
Trading A 60/70
Company
(Al Jazeera) AP1866 15-Feb-22 14-Feb-23 WC Gabbro QPMC Pen Woqod Woqod
AP02 60/70
29 BUZWAIR AMMANN AZ-64982 Salwa I.A. 25.17353 51.43811 240 AP1732 01-Oct-21 30-Sep-22 BC- Gabbro QPMC Pen Woqod Woqod
A 60/70
30 Boom AP03 AMMANN CS.97/07 Salwa 24.1774763 51.4103448 240 AP1799 28-Jul-21 27-Jul-22 BC- Gabbro QPMC PG76E- Membco Membco
Industrial B 10
Area Street
33 AP1864 10-Feb-22 09-Feb-23 WC Gabbro QPMC PG76E- Membco Membco
10
AP1863 10-Feb-22 09-Feb-23 WC Gabbro QPMC Pen Woqod Woqod
60/70
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
31 InfraRoad Benninghoven ECO 102002 Mesaieed 24.9959910 51.5837840 240 AP1789 13-Jun-21 12-Jun-22 BC- Gabbro QPMC Pen Woqod Woqod
Asphalt 3000 Industrial B 60/70
Factory Area
WLL AP1790 13-Jun-21 12-Jun-22 WC Gabbro QPMC PG76E- Membco Membco
10
AP1791 13-Jun-21 12-Jun-22 BC- Gabbro QPMC PG76E- Membco Membco
B 10
33 InfraRoad AMMANN K-152 HIA 25.14530 51.35275 300 AP1881 13-Apr-22 12-Apr-23 WC Gabbro QPMC Pen Woqod Woqod
Asphalt (Hamad 60/70
Plant AP02 International
Airport) AP1887 15-May-22 14-May-23 BC- Gabbro QPMC Pen Woqod Woqod
B 60/70
34 ALCAT MARINI M- Mesaieed 25.176333 51.444556 320 AP1870 24-Feb-22 23-Feb-23 WC Gabbro QPMC Pen Woqod Woqod
AP04 P19031 Industrial 60/70
Area
AP1869 20-Feb-22 19-Feb-23 BC- Gabbro QPMC Pen Woqod Woqod
A 60/70
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
This list presents asphalt mixes, which are approved for PWA projects
Any of these approved mixes can be used at one or more than one project simultaneously
The project consultant (SC/ GEC) and the PWA Project Manager are advised to make sure that the contractor will start the process
of mix certificate renewal not later than three months prior to certificate expiry date, which includes the two months period required
by the quality department of Qatar General Organization for Standards and Metrology
These asphalt Plants they are not producing currently for PWA project
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
3 MIDMAC COLAS Co. AP02 AMMANN I-884 Mesaieed 24.980609 51.578098 210 WC Fugro Membco PG76E- Successful 2020-0007715-
W.L.L. 10 7
CRMB
4 ALCAT Contracting AP02 MARINI P- Salwa Industrial 25.17557 51.44460 240 WC ACES Raetex PG76E- Successful 2019-0017444-
Company P120070 Area St. 41 10 7
CRMB
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
6 TEKFEN Construction AP02 BENNINGHOVEN P 100916 North Road 25.562287 51.414402 240 WC Fugro Membco PG76E- Successful 2020-0004086-
10 7
CRMB
7 TEYSEER Contracting Al Froosh AP MARINI CP14206 Dukhan 25.386558 51.367021 240 WC ACES Membco PG76E- Successful 2020-0023693-
Company Trading & Highway– Mall of 10 7
Contracting Company W.L.L. Qatar CRMB
8 BOTC (Al Jazeera NOH2) AP04 BENNINGHOVEN 167644 J12, Dukhan 25.34800 51.30925 320 WC Fugro Raetex PG76E- Successful 2020-0018303-
ECO 4000 Highway, Umm Al 10 7
Afai CRMB
9 AL DARWISH Engineering Mesaieed AP MARINI PP140006 Mesaieed 24.981326 51.582648 300 WC ACES Raetex PG76E- Successful 2020-0017742-
10 7
CRMB
10 QAP (Quality Asphalt Plant AP01 BENNINGHOVEN E96-0661 Mesaieed 24.98462 51.58381 240 WC Fugro Raetex PG76E- Successful 2019-0020855-
– Division of QBS) 10 7
CRMB
11 QD-CPC Industries W.L.L. AP01 LINTEC 2010-15 Umm Al Afai 25.38496 51.38190 240 WC Fugro Raetex PG76E- Successful 2020-0005441-
10 7
CRMB
12 QBC (Qatar Building AP01 AMMANN AZ-62805 Salwa Industrial 25.16785 51.44739 320 WC Fugro Raetex PG76E- Successful 2020-0021668-
Company) Area, str. 47 10 7
CRMB
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
14 Al Sarh Trading and AP04 SPECO 08A-6009 Mesaieed 24.9817 51.57948 240 WC Fugro Raetex PG76E- Successful 2021-0005851-
Contraction Company 10 7
W.L.L. CRMB
15 InfraRoad Asphalt Factory InfraRoad Benninghoven ECO 102002 Mesaieed 24.9959910 51.5837840 240 WC ACES Membco PG76E- Successful 2021/0040228/1
WLL Asphalt 3000 10
Factory WLL CRMB
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
PG76E-10
+974 PG76V-10
1 Woqod Mesaieed Industrial City (MIC) port area, in southeast Qatar customerservice@woqod.com.qa -
40217777 PG76H-10
PG76S-10
LG
Mesaieed, Light Industries Area (Near Gabbro Storage Area), Gate PL58 +974 PG76E-10
2 Raetex Doha WLL contact@raetexindustries.com Dynasol
(N24.98255, E51.58297) 40071718 PG76V-10
Kumho
Ooms OMB Strukton Contracting and Trading WLL (located at +974
3 Umm Al Affaei (N25.38213, E51.37951) struktonqatar@strukton.com Dynasol PG76E-10
BOOM Plant) 40168600
+974
4 Al Jaber and Makhlouf WLL Junction 11, Route 55 Mesaieed (N25.00898, E51.49997) info@jabmak.com Kumho PG76E-10
40350000
LG
Building 255, Street 1, Zone 81, New Industrial Area, Doha, State of Qatar +974 Dynasol
5 Middle East Modified Bitumen Company WLL info@membco.com PG76E-10
(N25.15455. E51.42758) 44184445 Kumho
Crayton
+974
6 Qatar Building Company WLL Salwa Industrial Area, Street 47 (N.25.16806, E51.44752) roads@qbcqatar.com.qa Kumho PG76E-10
44600365
+974 LG
7 Bin Omran West Bay, Majlis At Taawon Street (N25.34777, E.51.30825) info@botc.com.qa PG76E-10
44505606 Kumho
+974
8 Tekfen Al Khor Expressway Project (N25.55019, E.51.45997) hkazankiran@tekfen.com.tr Kumho
70481227
+974 Dynasol
9 Integrated Polymer Solution (IPS) New industrial area (N25.153627,E51.416315) info-integrated@polymerqa.com PG76E-10
44436429 Kumho
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
1 MEMBCO AP01 Bright Future Tyre Recycling Factory New Industrial Area 5.154450 51.427367
2 RAETEX AP01 Bright Future Tyre Recycling Factory Mesaieed 24.982607 51.582931
This list included CRMB Producers approved to supply CRMB for PWA projects
The project Consultants (SC/GEC) and PWA Project Manager are advised to make sure Contractors and their Suppliers for asphalt
mixes (Asphalt Plants) will start the process of the preparation of CRMB Asphalt Mixes and submit them for verification to QSD
and for approval to the Engineer.
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022
Quality and Safety Department
MAY 2022
Pre-
Seq Asphalt Plant % Of RAP in each
Company Qualification
No. Location asphalt Mix
Status
3 TEYSEER Contracting Company Trading & Contracting Company W.L.L. AP01, Mesaieed 15 Successful
4 QBC (Qatar Building Company) Industrial Area 15 Successful
5 QAP (Quality Asphalt Plant – Division of QBS) AP01, Mesaieed 15 Successful
6 QD-CPC Industries W.L.L. / National Asphalt Factory AP02, Umm Al Afai 15 Successful
7 Combined Group Asphalt Plant & Roads Construction WLL Almix plant, P9072, Mesaieed 15 Successful
For any information-44951154 - Email : balkhawaja@ashghal.gov.qa List no.60.0 Last Revision 02/06/2022