Professional Documents
Culture Documents
BY
EE/2007/253
(B.ENG)DEGREE IN ELECTRICAL/ELECTRONIC
ENGINEERING
AUGUST 2012
i
APPROVAL PAGE
PROJECT SUPERVISOR
HEAD OF DEPARTMENT
ii
DEDICATION
This project work is dedicated to God almighty for the strength and wisdom he
iii
ACKNOWLEDGEMENT
In the eyes of men lies the fear that it shall not come to pass, but with divine inspiration
success prevails. Therefore, unto Almighty God are the glory, honor, power and majesty for
My profound gratitude goes to my supervisor, Prof. G.C Ochiagha. For his fatherly
I appreciate the efforts of the entire staffs of Electrical Electronics department who in one
I live to remember Engr. C.O. Ejimofor the head of department, Engr P. N Mbah, Engr
My immensurable thanks, goes to my wonderful and loving parents Dr.D.O Echebiri and
Dr.Mrs.Gold Echebiri for the parental care and support. And to my beloved and wonderful
siblings, Rev Mrs.J.C Nwaji thank you all for your support, Finally to all my friends thanks
for been there. God Bless you all
Chinazo Echebiri
iv
ABSTRACT
The project design and construction of an automatic water level controller is aimed
water level in an overhead water tank. This project report details the construction
barest minimum. Attempt were made to describe the functional unit that make up
the project such as the power supply section, control section, indicator section and
the load protection section. The system works both in an automatic and in a manual
state detecting and controlling the water level in an overhead tank with the aid of a
floating switch. The floating switch is placed inside the overhead tank; it floats on
the water and thereby detecting the level of water in the tank. Once the water level
goes very low the floating switch sends a high signal to the motor to energies it
v
TABLE OF CONTENTS PAGES
TITLE PAGE……………………………………………………………… i
Approval page……………………………………………………………... ii
Dedication…………………………………………………………………. iii
Acknowledgement………………………………………………………… iv
Abstract………………………………………………………………….. v
Lists of figures…………………………………………………………… x
Lists of tables……………………………………………………………. x
CHAPTER ONE
vi
CHAPTER TWO
CHAPTER THREE
3.4.8 Tank/reservoir……………………………………………... 29
3.4.9 Voltmeter…………………………………………………… 29
3.4.10 Ammeter…………………………………………………... 29
CHAPTER FOUR
4.5 Testing…………………………………………………………. 36
4.5.1 Pre implementation testing…………………………………... 36
CHAPTER FIVE
5.4 Recommendation……………………………………………… 40
5.6 Conclusion…………………………………………………….. 40
References……………………………………………………. 42
ix
LIST OF FIGURES
FIG3.3 A contactor
x
LIST OF TABLES
xi