You are on page 1of 6

GOHAR TEXTILE MILLS

WEEKLY WORK REPORT (SPINNING BACK PROCESS)

From : 09/05/2022 To : 14/05/2022

BLOW ROOM
Date Day O.H Remarks Closing time
for cleaning
09/05/2022 Monday Auto bale Cleaning + Bearing Cotton-line11:00-12:25
opener checking & Poly-line 11:00-12:20
(Poly-line) lubrication+belt checked
10/05/2022 Tuesday B11 Over all cleaning Cotton-line11:30-12:35
condensor , belt , and Poly-line 11:50-12:35
bearing
checking+lubrication etc.
11/05/2022 Wednesday Multi-mixture Over all cleaning+
(Poly-line) Dapmers and dampers
guns checked+polyester
removed from beaters etc
12/05/2022 Thursday Multi-function Over all cleaning including Cotton-line11:15-12:40
seperator covers+pressure gun and Poly-line 11:15-12:20
(cotton line) grid-bars checked and
cleaned etc.
13/05/2022 Friday Argus system Over all cleaning ,pressure Cotton-line11:00-12:20
(cotton-line) gun , damper,damper plate Poly-line 09:50-11:00
and water level checked
and maintained etc.
14/05/2022 Saturday Tri-Roll cleaner Over all cleaning including Cotton-line10:05-11:40
covers+baeters and their Poly-line 10:00-11:35
bearings were checked and
greased etc.

Foreman : ……….
CARD
Date Day O.H Remarks

09/05/2022 Monday P-2 a) P-2 Cylinder Tention pulleys greased.


b) P-7 & P-8 topset cleaned.
c) 20 cans cleaned and lubricated.

10/05/2022 Tuesday C-3 a) Topset grinded + 2 bearings of 6203-2R


b) C-9 Topset grinded using dead-Roll.
c) P-2 cylinder motor O.H
d) 15 Cans cleaned properly
11/05/2022 Wednesday P-3 a) Complete over-hauling procedure completed
b) C-3 , C-4, C-5 , C-6 Topset cleaning
c) 15 cans cleaned + tyres lubricated

12/05/2022 Thursday C-4 d) Can player belt B-96


e) C-1 , C-2 , P-8 , P-4 Topset cleaned
f) 15 Cans cleaned Properly

13/05/2022 Friday General a) C-8 topset belt #390H100 changed


Cleaning b) C-9,C-10,P-1 Topset cleaned
c) All machines cleaned properly

14/05/2022 Saturday P-10 a) P-10 Top-set grinded using dead-roll.


b) P-8 cylinder tention pulley 2 bearings
changed # 6206-2R + topset gear-box belt #
1860 *20.
c) Topset Cleaned C-4 , C-5
d) 15 Cans cleaned Properly

Foreman : ………….
Draw and Simplex
Date Day O.H Remarks

09/05/2022 Monday Simplex # 8 a) 132 top approns changed (37*40*1.1)


b) Breaker #2 CVC 60/40 guage 9-24
c) Inter #2 CVC 60/40 guage 8-19
d) Finisher #2 CVC 60/40 guage 6-18
e) Simplex #2 CVC/60/40 guage9-27-30

10/05/2022 Tuesday Breaker-1 Nill

11/05/2022 Wednesday Inter-1 Nill

12/05/2022 Thursday Breaker # 2 Simplex 3-8 (PC52/48)


Old guage 6-19
New guage 7-20

13/05/2022 Friday General a. All machines cleaned properly.


Cleaning b. Finisher 1 & 2 guage 7-19

14/05/2022 Saturday Inter # 2 Nill

Foreman : …………
AC PLANT
 Kind of work
DEPARTMENT Monday Tuesday Wednesday Thursday Friday Saturday

B.Room & Card Cleaning Cleaning Cleaning Cleaning Cleaning O.H

Draw & Simplex Cleaning Cleaning Cleaning Cleaning O.H Cleaning

 Rotary Cleaning
DEPARTMENT Monday Tuesday Wednesday Thursday Friday Saturday

B.Room & Card


     
Draw & Simplex
     

 Temp. Parameters
Date Day Blow room Card Drawing Simplex

T(F) RH% T(F) RH% T(F) RH% T(F) RH%

09/05/22 Monday 103 48 103 48.5 101 53 101 53


10/05/22 Tuesday 103 48 103 48.5 101 53 101 53
11/05/22 Wednesday 103 48 103 48.5 101 53 101 53
12/05/22 Thursday 103 48 103 48.5 101 53 101 53
13/05/22 Friday 103 48 103 48.5 101 53 101 53
14/05/22 Saturday 103 48 103 48.5 101 53 101 53
Graphical Representation:

Blow-room Card
120 120
103 103 103 103 103 103 103 103 103 103 103 103
100 100

80 80
Values

Values
60 50 50 50 50 50 50 60 48.5 48.5 48.5 48.5 48.5 48.5

40 40

20 20

0 0
0 2 4 6 8 0 2 4 6 8
Days Days

Temperature RH % Temperature RH %

Drawing Simplex
120 120
101 101 101 101 101 101 101 101 101 101 101 101
100 100

80 80
Values
Values

60 53 53 53 53 53 53 60 53 53 53 53 53 53

40 40

20 20

0 0
0 2 4 6 8 0 2 4 6 8
Days Days

Temperature RH % Temperature RH %

AC FORMAN : ……………..
REMARKS

Trainee : ……………

SM : ………………..

QM : ………………

GM : ……………….