BLOW ROOM
Date Day O.H Remarks Closing time
for cleaning
09/05/2022 Monday Auto bale Cleaning + Bearing Cotton-line11:00-12:25
opener checking & Poly-line 11:00-12:20
(Poly-line) lubrication+belt checked
10/05/2022 Tuesday B11 Over all cleaning Cotton-line11:30-12:35
condensor , belt , and Poly-line 11:50-12:35
bearing
checking+lubrication etc.
11/05/2022 Wednesday Multi-mixture Over all cleaning+
(Poly-line) Dapmers and dampers
guns checked+polyester
removed from beaters etc
12/05/2022 Thursday Multi-function Over all cleaning including Cotton-line11:15-12:40
seperator covers+pressure gun and Poly-line 11:15-12:20
(cotton line) grid-bars checked and
cleaned etc.
13/05/2022 Friday Argus system Over all cleaning ,pressure Cotton-line11:00-12:20
(cotton-line) gun , damper,damper plate Poly-line 09:50-11:00
and water level checked
and maintained etc.
14/05/2022 Saturday Tri-Roll cleaner Over all cleaning including Cotton-line10:05-11:40
covers+baeters and their Poly-line 10:00-11:35
bearings were checked and
greased etc.
Foreman : ……….
CARD
Date Day O.H Remarks
Foreman : ………….
Draw and Simplex
Date Day O.H Remarks
Foreman : …………
AC PLANT
Kind of work
DEPARTMENT Monday Tuesday Wednesday Thursday Friday Saturday
Rotary Cleaning
DEPARTMENT Monday Tuesday Wednesday Thursday Friday Saturday
Temp. Parameters
Date Day Blow room Card Drawing Simplex
Blow-room Card
120 120
103 103 103 103 103 103 103 103 103 103 103 103
100 100
80 80
Values
Values
60 50 50 50 50 50 50 60 48.5 48.5 48.5 48.5 48.5 48.5
40 40
20 20
0 0
0 2 4 6 8 0 2 4 6 8
Days Days
Temperature RH % Temperature RH %
Drawing Simplex
120 120
101 101 101 101 101 101 101 101 101 101 101 101
100 100
80 80
Values
Values
60 53 53 53 53 53 53 60 53 53 53 53 53 53
40 40
20 20
0 0
0 2 4 6 8 0 2 4 6 8
Days Days
Temperature RH % Temperature RH %
AC FORMAN : ……………..
REMARKS
Trainee : ……………
SM : ………………..
QM : ………………
GM : ……………….