Professional Documents
Culture Documents
Mpc01-2y Miwi
Mpc01-2y Miwi
Job Plan
MPC01-2Y Description
Code
PM Content
Job Plans
Job Plan Description
Code Interval
References
1.
2.
Re Action by
Ser # Description Action-1 Action by Title Signature Date
v Names
Notes:
1. Action: Prepare / Edit / Review / Approval
Rev # Document Name Approved by Title Approved by Name Signature Date Page
1 of 5
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC01
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC01-2Y Description
Code
Rev # Document Name Approved by Title Approved by Name Signature Date Page
2 of 5
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC01
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC01-2Y Description
Code
E. Permits Forms:
It’s recommended to scan the forms and attach to the maximo work order
Permits Name Serial No.
1.
2.
3.
4.
5.
F. Isolation Certificate Forms:
It’s recommended to scan the forms and attach to the maximo work order
Isolation Certificate Name Serial No.
1.
2.
Done
(2) Work Instructions Y/N
Comments
Operational Checks While Equipment RUNNING:
1. Visual inspection for the pump internal parts (Casing, Shaft, Impeller,
Stuffing Box, Bearing Housing, …) – Take necessary action.
2. Check the wear ring clearance – Replace if necessary.
3. Check Coupling membrane elements and Spacer – Replace if necessary.
4. Follow vibration analysis recommendations; and replace the bearing if
recommended.
5. Check and Maintain Mechanical Seal / Replace Packing rings.
6. Run the pump in sequence and operation procedure instructions.
G. Extra Work
Report any extra work and explain in the Clarification the reason for this extra work
Extra Work Clarification
1
2
H. Mandatory Recommendation
Report mandatory recommendation for enhancement of this Job Plan or PM
Recommendation’s Clarification
1
2
Rev # Document Name Approved by Title Approved by Name Signature Date Page
3 of 5
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC01
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC01-2Y Description
Code
(3) Failure
Use Maximo Failures Codes (while feedback in Maximo)
Failure Problem Cause Remedy Failed MESC Item
Description Description Description Description Component Code
(4) Resources
A. Manpower
Planned Actual
Maximo Trade Position/Title No. of Duration Employee
SN
Trade Code Description Persons Hours Code Name Hours
1.
2.
B. Tools
Only hold by other party OR requires request, permit, certification OR calibration as:
Cranes, Ultrasonic Thickness Gauge, hydro Test Pump, etc.
Planned Actual
Maximo Tool Duration Duration
SN Tool Description Qty
Code Hours Hours
1.
2.
C. Spare Parts/ Materials
Also; define new items (items without MESC) by item description or part number
Planned Actual
MESC Stock Item Part
SN Item Description Qty Qty
Item Code Number
1.
2.
3.
4.
5.
D. Services
Only provided through Contract or service order as: Inspection, Certification OR Renting Equipment, etc.
Planned Actual
Service code Service Description Service Order no.
Rev # Document Name Approved by Title Approved by Name Signature Date Page
4 of 5
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC01
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC01-2Y Description
Code
(6) Observations
Report Observations that requires action to the Maintenance Supervisor
Observation Required Action
1.
2.
Signature Signature
Signature Signature
Rev # Document Name Approved by Title Approved by Name Signature Date Page
5 of 5
E/OHSP-11-F-??