You are on page 1of 2

ABAJA CONTRACTING EST.

Materials Theft / Damage Report

Damage / Loss / Theft - Reported By


Employee Name: Aaquib Perwez Badge Number: 2402672329

Position/Title: Project Engineer Location: SDGM 1174

Main Contractor Name: NESMA & Sub-Contractor: Abaja Contracting Est.


PARTNERS

Incident Information

Incident Date: No info. Time of Incident: No Info

Reported on: 19 MAY 2022 Time Reported: 09:00 hrs


Reported to: NESMA Exact Location– SDGM 1174
Terminal pole-CP Station Area

Description of Damage /theft


At SDGM – 1174 the OHPL was already energized up to cutout fuse.
On 19th May 2022 Abaja QC Inspector was on routine visit of site and he found
that someone has broken the power panel while trying to steal the cable which
was connected with power panel to transformer, along with that they damaged
our RGS conduit also which was connected to power panel. Abaja Project
Manager immediately reported this incident to NESMA and PMT Project
Engineer.
Sr Type of Loss Picture
No.
1 Power Panel broken

2 RGS conduit damaged

 Loss of man hours which was assigned for construction.

Reported by Verified by

Mohamed Ibrahim
Aaquib Perwez
QC Inspector Project Manager
Abaja Contracting Est. Abaja Contracting Est.
Date: Date:

You might also like