You are on page 1of 2

AUTHENTIC DESIGN 6

Exe 1:

Dubai Creek Tower is (1) ___rumoured to stand____________ over 1,300m high, which
is expected to overshadow the nearby Burj Khalifa.

Recently, nevertheless, the scheme has been confronted with (2) __rumours of
postponement _____________ or can even be called off.

Owing to its sheer costliness, the project was not prepared to (3) ___deliver much
____________ with regard to (4) __usable space_____________.

Although the tower would be extremely high, it is believed to consist of only 20 floors,
including a hotel, restaurants and (5) __housing observation desks_____________.

One of the important goals set by was the creation of (6) _jaw dropping attraction
______________ for the city.

In reality, it is (7) ___strategic economic boom____________ that Dubai implements in an


attempt to retain its title of the world’s tallest building.

Because of (8) ___anti-corruption purges____________ in Saudi Arabia, the construction


of Jeddah Tower was stopped in 2018.

Despite the fact that no construction has taken place since late 2018, Dubai Creek Tower
was (9) ____only formally put on hold ___________ in 2020 when Dubai imposed a
lockdown. However, (10) ____enmarked properties___________ is confident that the
scheme will be finished by 2022.

Exe 2:

According to a gymnast, the expenses required for The Tokyo Olympics are (1) ______26
billion dollars _________ at the moment.

The National Stadium is supposed to be the venue of (2) __track and field events
_____________, the opening and closing ceremonies and soccer.

All (3) ____Japan’s 47 prefactures___________ are expected to provide a mix of steel and
wood to construct the 68,000-seat stadium designed by Japanese architect Kengo Kuma.

“ So, (4) _____the yen’s depriciation__________ means import costs are much higher”.
The facilities include a (5) _______plaza for badminton________, an aquatic center for
swimming and diving, the (6) __canoe and kayak center_____________ and the volleyball
arena.

Owing to a shortage of labor in (7) _____construction__________, the cost of building


infrastructure is surging.

Tokyo heightened security, (8) _______maintenance________ for all sporting venues and
paid the rental fee for the Olympic Village for a year instead of a month.

Numerous stadiums and sports players’ accommodation are left (9) ___empty
____________.

The exhibition of laser light, fireworks and the (10) ____lighting of the Olympics culture
___________ will take place at the opening and closing ceremonies.

You might also like