One APH Trip
IEPL-OPN-SOP1

Issue date  
Revision No 00 - - 00
Revision date 13.01.2018 - -

  Prepared By Reviewed By Approved By Approved By


Name S.K. Aloni K.K. Fadanavis
Designation Shift Incharge DGM- Operation Dy. CEO

Signature
       

Plant Operation SOP For One APH Trip

Once printed, this document becomes uncontrolled


IDEAL ENERGY PROJECTS LIMITED
STANDARD OPERATING PROCEDURE
DEPARTMENT : Operation
Rev No.00 Doc No.- Date:13.01.2018

Content:

1. Purpose..................................................................................................................................... 3

2. Scope........................................................................................................................................ 3

3. Responsibilities:........................................................................................................................ 3

Plant Operation SOP For One APH Trip

Once printed, this document becomes uncontrolled


IDEAL ENERGY PROJECTS LIMITED
STANDARD OPERATING PROCEDURE
DEPARTMENT : Operation
Rev No.00 Doc No.- Date:13.01.2018

1. Purpose

This procedure is used as work instruction for Electrician, Electrical Engineer, Desk Engineer, Shift In
charge.

2. Scope

This procedure explains the Effects / Steps to be taken in case of 220 Volt DC Supply Failure.

3. RESPONSIBILITY : Desk Engineer, SIC, Field Operator

DEFINITION : ID Fan- Induced Draft Fan, APH- Air Preheater, DeE-Desk Engineer, FO-Field Operator, FD- Forced
Draft Fan

1. WORK INSTRUCTIONS :

1. Cause:

1. Motor tripped due to overload


2. Motor protection act
3. Supply failure
4. Local tripped/circuit fault
5. Manual stop

2. Unit Response:

1. Furnace draft fluctuation


2. Drum level fluctuation
3. Decrease in furnace temperature
4. Rapid fall of hot air temperature in the pass which tripped and raise in flue gas temperature

3. Operator Action:

1 Immediately cut upper elevation mill. (DeE) and reduce the Load.
2 Put oil support for stabilizing furnace. (DeE)Maintain furnace draft +/-10 mmwc . (DeE)
3 Increases loading of running pass. (DeE)
4 Maintain drum level +/- 50 mm and SH/RH temperature 537 deg C.(DeE)
5 Isolate the tripped pass from air and flue gas side (DeE/FO)
6 Maintain APH outlet temperature of running pass ~132 deg C. (DeE)
Plant Operation SOP For One APH Trip

Once printed, this document becomes uncontrolled


IDEAL ENERGY PROJECTS LIMITED
STANDARD OPERATING PROCEDURE
DEPARTMENT : Operation
Rev No.00 Doc No.- Date:13.01.2018

7 If APH cold end temp. is increasing then, Give PA air to reduce APH temperature . (DeE)
8 Check healthiness of air motor and air supply (Field operator)

2. Daily Monitoring :

1 Regular monitoring vibration of all equipments.


2 Do regular routine maintenance of all equipments.
3 Arresting all leakages promptly.

Plant Operation SOP For One APH Trip

Once printed, this document becomes uncontrolled