You are on page 1of 3

EPC Contractor CONCEPT PROJECT “INCREASE FUEL SUPPLY Owner / Purchaser

CAPACITY ACCORDING TO THE MASTER PLAN 2016 TO 2026”


Data sheet for Loading Arm Package
( PK-101 A/B/C)
Project Unit Phase Disc. Doc Type Seq. No. Rev.
Class: 1 IKH P4 ED ME DSH 0005 A0 Page 1 of 3

Data sheet for Loading Arm Package


( PK-101 A/B/C)

A0 14-Aug-2021 ISSUED FOR INFORMATION J.A H. Mansouri M.Oskouei A.H. Yousefi


REV. Date Purpose of Issue Prepared by Checked by Approved by Authorized by
EPC Contractor CONCEPT PROJECT “INCREASE FUEL SUPPLY Owner / Purchaser
CAPACITY ACCORDING TO THE MASTER PLAN 2016 TO 2026”
Data sheet for Loading Arm Package
( PK-101 A/B/C)
Project Unit Phase Disc. Doc Type Seq. No. Rev.
Class: 1 IKH P4 ED ME DSH 0005 A0 Page 2 of 3

Revision Index
Page A0 A1 A2 A3 B0 B1 B2 Page A0 A1 A2 A3 B0 B1 B2 Page A0 A1 A2 A3 B0 B1 B2
1 x 51 101
2 x 52 102
3 x 53 103
4 54 104
5 55 105
6 56 106
7 57 107
8 58 108
9 59 109
10 60 110
11 61 111
12 62 112
13 63 113
14 64 114
15 65 115
16 66 116
17 67 117
18 68 118
19 69 119
20 70 120
21 71 121
22 72 122
23 73 123
24 74 124
25 75 125
26 76 101
27 77 102
28 78 103
29 79 104
30 80 105
31 81 106
32 82 107
33 83 108
34 84 109
35 85 110
36 86 111
37 87 112
38 88 113
39 89 114
40 90 115
41 91 116
42 92 117
43 93 118
44 94 119
45 95 120
46 96 121
47 97 122
48 98 123
49 99 124
50 100 125
EPC Contractor CONCEPT PROJECT “INCREASE FUEL SUPPLY Owner / Purchaser
CAPACITY ACCORDING TO THE MASTER PLAN 2016 TO 2026”

Data sheet for Loading Arm Package


( PK-101 A/B/C)
Project Unit Phase Disc. Doc Type Seq. No. Rev.
IKH P4 ED ME DSH 0005 A0
Page 3      of      3

1 LOADING ARMS ORDERED No. 3


CHARACTERISTICS OF LOADING ARMS
2 ARM Item Liquid Filling Vapour Return
3 LOADING Top-Bottom BOTTOM N.A.
4 SIZE Inch
5 LOADING VALVE : Hold open Yes - No No
: Stay open Yes - No No
: Min. closing time Sec. -
6 DROP PIPE : Rigid Yes - No
: Flexible Yes - No
7 END OF DROP PIPE ***
*** S= Standard (45° flute beak) T= Tee type end F= Flange D= Ware spreader end C= Dry break coupling
8 ARM TO OPERATE One only side of rack Both sides of rack
9 ARM DRAINAGE Yes No
10 ARM HEATING Yes No
Steam Hot Oil Others
Holding Temperature °C Pressure of heating system bar (g)
11 ARM INSULATION Yes No
Type of insulation Thickness mm
12 AMBIENT TEMPERATURE
Minimum -17 °C Maximum 45 °C
13 BALANCING
Spring Counterweight
14 STANDPOST FLANGE Serie :
Facing :
Size :
Drilling : -
CHARACTERISTICS OF FLUID
15 ITEM OF ARMS HANDLING THE PRODUCT
16 FLUID TO BE HANDLED A.T.K

17 COMPOUNDS : Corrosive Yes - No No


: Toxic Yes - No No
: Solids % -
18 OPERATING PRESSURE Min/Norm/Max bar (g)
19 OPERATING TEMPERATURE °C Amb.
20 VISCOSITY AT OPERATING TEMPERATURE cP
21 DENSITY AT OPERATING TEMP. Kg/m3 775~ 840
22 ALLOWED PRESSURE DROP mm H2O
23 FLOW RATE : Normal m3/h -
24 : Maximum m3/h 275
NOTES
25 1 - Ball valve to be provided with each arm
26 2- For priliminary Scope of supply refer to PID. ( In acc. with PID, metering system, TRV, control valve, control panel, PG are in vendor scope.).
27 3- Material and loading arm details shall be finalized during detail design.
28 4- Vendor of loading arm to be same as existing loading arm as mush as possible. To clarified during detail design.

You might also like