M/S PAGWIN CONSTRUCTION

GENERAL RISK ASSESSMENT DOC. NO:-PC/GRA/05/01


REV:01

Sequence Of Potential Recommended What could go Corrective


Basic Jobs Hazards Safe Job wrong Actions
Procedure
1.Material Shifting 1. Heavy load 1. Wear 1. Workmen 1. PPE's must be
&Sharp edges of recommended may get injured used by the
load PPE's . in his hand workmen .
2. Ensure the fingers. 2. Minimum
2.Improper correct lifting
2. Material may weight should
manual handling. methods .
3. Remove trip
fall on the foot be lifted ,if more
3. Falling material
during shifting hazards before of the workmen . weight Wheel
job. carrying the 3. Person may barrows should
materials. fall on the be used for
ground . shifting .
3. Work area &
walk way should
be clear from
materials .
2. Alignment of 1. Overhead 1. NOC from 1. Person 1.Positive
false ceiling and Cables concerned working in that isolation to be
gypsum board 2. Drilling authority before area will receive followed &
fixing. Machine start of work. shock. checked prior to
3. Slippery rungs 2. Use of proper 2. Work men get commencement
of ladder tools. cut, bruises on of work.
4. Acrophobia 3. Sacks to be their body . 2. Proper PPE
wrapped around 3. Slip & fall must be used
the rungs of 4 .Workmen without fail.
ladder. may get severe 3. Rungs to be
4.Vertigo test injury in his cleaned on
back /Spin regular basis,3
point contact to
be maintained
on ladder.
4. Periodic
medical check
up.