Professional Documents
Culture Documents
BOQ
No. Description
A
SUB STRUCTURE
Site clearance including removing of waste materials on the site with area of 30 x 30m)
Excavation of the construction foundation stone of the building 100m x 0.6m x1m
RCC (1:2:4 mix) in Foundation beam 0.3mX0.6m x 100mL with 4 No Y 12 re-bars and R6
@ 300mm c/c foundation beam
RCC (1:2:4 mix) in columns of vertical beam (0.6mx0.4m X 2m)20 with 4 No Y 12 re-bars
R6 links @ 300mm c/c foundation beam
construction of stone wall with length 100 m linear and height of 1m with width 0.6m x
m Length
RCC (1.2.4 mix) in Foundation beam 100 m linear 0.3mX0.6m with 4 No Y 12 re-bars and
links @ 300mm c/c foundation beam
Construction of block wall for the height of 2m with ratio (12:4 mix)
External plastering, 25mm thick, cement/sand mix 1:4. using cement water proof
External distempering and white washing for the two sides of the construction
supply and install for the main gate of the building with 5m
Sub-Total (A+B)
Tax 11.75%
Supervision Charge 5%
Ground Total of lughaye ( Engine room + Fence+Sloughter)
Mukho86@hotmail.com
ughaya fishing center
Q
Unit Qty Price T.Amount
$ 42,750.00
m x 0.6m x 1m 15 35 $ 525.00
Y 12 re-bars and R6 links
4 350 $ 1,400.00
umn that will hold the
6 60 $ 360.00
m with width 0.6m x 100
8 15 $ 120.00
4 No Y 12 re-bars and R6
3 350 $ 1,050.00
ix) 22 35 $ 770.00
nt water proof 44 15 $ 660.00
onstruction 44 12 $ 528.00
ted soil with approval of
188 20 $ 3,760.00
6 350 $ 2,100.00
nce for chorion and
23 28 $ 644.00
1 675 $ 675.00
$ 12,592.00
$ 55,342.00
11.75% $ 6,502.69
5% $ 2,767.10
loughter) $ 64,611.79