Construction of the lughaya fishin

BOQ
No. Description
A
SUB STRUCTURE
Site clearance including removing of waste materials on the site with area of 30 x 30m)
Excavation of the construction foundation stone of the building 100m x 0.6m x1m
RCC (1:2:4 mix) in Foundation beam 0.3mX0.6m x 100mL with 4 No Y 12 re-bars and R6
@ 300mm c/c foundation beam
RCC (1:2:4 mix) in columns of vertical beam (0.6mx0.4m X 2m)20 with 4 No Y 12 re-bars
R6 links @ 300mm c/c foundation beam
construction of stone wall with length 100 m linear and height of 1m with width 0.6m x
m Length
RCC (1.2.4 mix) in Foundation beam 100 m linear 0.3mX0.6m with 4 No Y 12 re-bars and
links @ 300mm c/c foundation beam
Construction of block wall for the height of 2m with ratio (12:4 mix)
External plastering, 25mm thick, cement/sand mix 1:4. using cement water proof
External distempering and white washing for the two sides of the construction
supply and install for the main gate of the building with 5m

A. Ground Total of the

Construction of the lughaya fishi


No. Description
B
SUB STRUCTURE
Excavation of the construction foundation stone of the building 25m x 0.6m x 1m
RCC (1:2:4 mix) in Foundation beam 0.3mX0.6m x 100ml with 4 No Y 12 re-bars and R6
@ 300mm c/c foundation beam
Supply and install for the steel pipe with diameter of 4mm for 6 column that will hold th
roof
construction of stone wall with length 100 m linear and height of 1m with width 0.6m x
m Length
RCC (1:2:4 mix) in Foundation beam 100 m linear 0.3mX0.6m with 4 No Y 12 re-bars and
links @ 300mm c/c foundation beam
Construction of block wall for the height of 1m with ration (1:2:4 mix)
External plastering, 25mm thick, cement/sand mix 1:4. using cement water proof
External distempering and white washing for the two sides of the construction
Compaction of the back filling area and leveling it the site for selected soil with approva
the site engineer of the project
lay with concert with mix ratio (1:2:4 mix)
construction of roof for the preprinted 26 Gt with have high resistance for chorion and
white wood for the American woods
Construction of toilet including all its accessory of the toilet

B. Ground Total of the Engine room

Sub-Total (A+B)
Tax 11.75%
Supervision Charge 5%
Ground Total of lughaye ( Engine room + Fence+Sloughter)

Mukho86@hotmail.com
ughaya fishing center

Q
Unit Qty Price T.Amount

th area of 30 x 30m) 900 $ 25.00 $ 22,500.00


0m x 0.6m x1m 60 $ 25.00 $ 1,500.00
Y 12 re-bars and R6 links
18 $ 350.00 $ 6,300.00
ith 4 No Y 12 re-bars and
5 $ 350.00 $ 1,750.00
m with width 0.6m x 100
60 $ 25.00 $ 1,500.00
4 No Y 12 re-bars and R6
12 $ 350.00 $ 4,200.00
) 200 $ 5.00 $ 1,000.00
nt water proof 400 $ 6.00 $ 2,400.00
onstruction 400 $ 4.00 $ 1,600.00
1 $ -

$ 42,750.00

ughaya fishing center


Unit Qty Price T.Amount

m x 0.6m x 1m 15 35 $ 525.00
Y 12 re-bars and R6 links
4 350 $ 1,400.00
umn that will hold the
6 60 $ 360.00
m with width 0.6m x 100
8 15 $ 120.00
4 No Y 12 re-bars and R6
3 350 $ 1,050.00
ix) 22 35 $ 770.00
nt water proof 44 15 $ 660.00
onstruction 44 12 $ 528.00
ted soil with approval of
188 20 $ 3,760.00
6 350 $ 2,100.00
nce for chorion and
23 28 $ 644.00
1 675 $ 675.00

$ 12,592.00

$ 55,342.00
11.75% $ 6,502.69
5% $ 2,767.10
loughter) $ 64,611.79