Professional Documents
Culture Documents
DEPARTMENT OF EDUCATION
Region 02
Schools Division of Isabela
San Mariano I District
STA. FILOMENA INTEGRATED SCHOOL
San Mariano
(Formative) Year round 15% 4. List of pupil’s/student’s output like projects, activities done/performed, etc. 4 4 4 4.00 0.60
*Assessment of Learning 5 All indicators were prepared and submitted two weeks before the scheduled due time
(Summative) 4 3 indicators were prepared and submitted one week before the scheduled time
*Periodic Test 3 2 indicators were prepared and submitted on the scheduled date
2 1 indicator was prepared and submitted on the scheduled date
1 no indicator was prepared and submitted on the scheduled date.
5 100% pupils/students were given remediation/enrichment successfully
2. Visited parents of
pupils/students needing 68%-83% of the parents of the students needing academic monitoring was followed up
Quarterly 2.5% 3 4 4 4 4.00 0.10
academic monitoring/follow supported with documents.
up 52%-67 of the parents of the students needing academic monitoring was followed up
2 supported with documents.
51%-below of the parents of the students needing academic monitoring was followed up
1
supported with documents.
INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW FORM (IPCRF) FOR MASTER TEACHERS
June 2015 - March 2016
KEY RESULT
MAJOR FINAL WEIGHT ACTUAL RESULTS
AREAS OBJECTIVES TIMELINE PERFORMANCE INDICATORS RATING SCORE
OUTPUTS PER KRA
(KRAs) Q E T
5 200 or more updated lesson plans/logs prepared in SMART way
Write lesson plans/logs based 4 150-199 updated lesson plans/logs prepared in SMART way
on the standards-based 5% 3 90-149 updated lesson plans/logs prepared in SMART way 3 3 3 3.00 0.15
curriculum guides daily. 2 60-89 updated lesson plans/logs prepared in SMART way
1 1-59 updated lesson plans/logs prepared in SMART way
Facilitate learning through the 5 10 instructional materials used/produced are appropriate, adequate and updated
use of written/computerized 4 8 instructional materials used/produced are appropriate, adequate and updated
lesson plans, modules, 3 6 instructional materials used/produced are appropriate, adequate and updated
teaching guides, and other 5% 4 5 4 4.33 0.22
learning resources with the 2 4 instructional materials used/produced are appropriate, adequate and updated
adequate and updated 1 2 instructional materials used/produced are appropriate, adequate and updated
instructional materials. (Supported with write-up and documentation)
Teaching 5 100% of the indicators in classroom walk-through are observed
Learning Initiate discipline of students 4 85%-99% of the indicators in classroom walk-through are observed
Process (20%) including classroom rules, 5% 3 70%-84% of the indicators in classroom walk-through are observed 4 4 4 4.00 0.20
guidelines and individual and
group task. 2 55%-69% of the indicators in classroom walk-through are observed
Teaching
Learning Initiate discipline of students
Process (20%) including classroom rules, 5% 4 4 4 4.00 0.20
guidelines and individual and
group task.
1 54% and below of the indicators in classroom walk-through are observed
100% of the pupils monthly attendance and are monitored and submitted every last
5
day of the month
Monitor attendance, diversity 85%-99% of the pupils monthly attendance and are monitored and submitted every
appreciation, safe, positive and 4
last day of the month
motivating environment, over-
70%-84% of the pupils monthly attendance and are monitored and submitted every
all physical atmosphere, 5% 3 2 3 5 3.33 0.17
last day of the month
cleanliness, and orderliness of
classrooms including proper 55%-69% of the pupils monthly attendance and are monitored and submitted every
2
waste disposal. last day of the month
54% and below of the pupils monthly attendance and are monitored and submitted
1
every last day of the month
Indicators:
Monitor, evaluate and maintain
1. Test Questions with TOS
pupil’s/student’s progress
through 2. Class Record (with dates of quizzes, assignments, projects, portfolio, etc.)
1 75% of the pupils proficiency level have mastered the required learning competency
5 Attained 75% and above NAT MPS per subject area
Attain 75% MPS per subject 4 Attained 65%-74% of NAT MPS per subject area.
area in the National 3% 3 Attained 55%-64% of NAT MPS per subject area. 3 3 3 3.00 0.09
Achievement Test 2 Attained 44%-54% of NAT MPS per subject area.
Students'
Learning 1 Attained 45% or below of NAT MPS per subject area.
Outcomes (30%) initiated at least one successful instructional program to 100% of the teachers with
5
full documentation.
initiated at least one successful instructional program and involved 84%-99% of the
4
teachers with full documentation.
Initiate improvements in
3% initiated at least one successful instructional program and involved 63%-83% of the 3 4 4 3.67 0.11
instructional programs 3
teachers with full documentation.
initiated at least one successful instructional program and involved 52%-62% of the
2
teachers with full documentation.
1 no evidence of initiating instructional program.
lead 100% of the teachers in preparing innovative instructional materials within a
5
year with full documentation.
lead 84%-99%% of the teachers in preparing innovative instructional materials within
4
a year with full documentation.
Lead in the preparation of
3% lead 68%-83% of the teachers in preparing innovative instructional materials within a 4 2 3 3.00 0.09
instructional materials. 3
year with full documentation.
lead 52%-67% of the teachers in preparing innovative instructional materials within a
2
year with full documentation.
1 no evidence of leading in preparation of instructional program.
Excellent execution of the lesson plan and excellent mentoring services provided to
5
the demonstration teacher
Very Satisfactory execution of the lesson plan and Very Satisfactory mentoring
Serve as demonstrator teacher, 4
services provided to the demonstration teacher
facilitator or resource speaker
Satisfactory execution of the lesson plan and Satisfactory mentoring services
at the school level and or 3% 3 4 5 3 4.00 0.12
provided to the demonstration teacher
provided mentoring services to
demonstration teachers. Fair execution of the lesson plan and Fair mentoring services provided to the
2
demonstration teacher.
Poor execution of the lesson plan and Poor mentoring services provided to the
1
demonstration teacher
100% of the test results were analyzed and interpreted per grading period and
5
submitted before the scheduled time.
84%-99% of the test results were analyzed and interpreted per grading period and
4
submitted before the scheduled time.
68%-83% of the test results were analyzed and interpreted per grading period and
Interpret test results and utilize. 3% 3 4 3 2 4.00 0.12
submitted before the scheduled time.
52%-67 of the test results were analyzed and interpreted per grading period and
2
submitted before the scheduled time.
51%-below of the test results were analyzed and interpreted per grading period and
1
submitted before the scheduled time.
Initiated a full blown project and program that enhance the curriculum and achieve
5
75% in NAT Performance.
Initiated a full blown project and program that enhance the curriculum and achieve
Initiate projects and programs 4
65%-74% in NAT Performance.
that will enhance the curriculum
3% Initiated a full blown project and program that enhance the curriculum and achieve 4 4 2 3.33 0.10
and its delivery to achieve 75% 3
55%-64% in NAT Performance.
NAT performance.
Initiated a full blown project and program that enhance the curriculum and achieve
2
54%-below in NAT Performance.
Provision of Quality 1 the project or program did not materialized
Basic Education 100% of the teachers were observed quarterly and submitted the observation
5
checklist form at the end of the quarter.
84%-99% of the teachers were observed quarterly and submitted the observation
4
checklist form at the end of the quarter.
Observe teachers every 68%-83% of the teachers were observed quarterly and submitted the observation
5% 3 4 3 2 3.00 0.15
quarter. checklist form at the end of the quarter.
52%-67 of the teachers were observed quarterly and submitted the observation
2
checklist form at the end of the quarter.
51%-below of the teachers were observed quarterly and submitted the observation
1
checklist form at the end of the quarter.
Conducted mentoring/coaching activities to 100% of the teachers and prepared
5
innovative instructional materials fully documented.
Conducted mentoring/coaching activities to 84%-99%% of the teachers and
4
Conduct mentoring/coaching prepared innovative instructional materials fully documented.
activities and prepare 5% Conducted mentoring/coaching activities to 68%-83% of the teachers and prepared 4 1 2 2.33 0.12
3
instructional material available. innovative instructional materials fully documented.
Conducted mentoring/coaching activities to 52%-67% of the teachers and prepared
2
innovative instructional materials fully documented.
Instructional 1 no evidence of mentoring/coaching conducted
Supervision 100% of the teachers were guided and provided with the necessary technical
5
(20%) assistance in the carry-over of their duties and functions.
84%-99% of the teachers were guided and provided with the necessary technical
4
assistance in the carry-over of their duties and functions.
Guided co-teachers in the
68%-83% of the teachers were guided and provided with the necessary technical
performance of duties and 5% 3 4 5 2 3.67 0.18
assistance in the carry-over of their duties and functions.
responsibilities.
52%-67 of the teachers were guided and provided with the necessary technical
2
assistance in the carry-over of their duties and functions.
51%-below of the teachers were guided and provided with the necessary technical
1
assistance in the carry-over of their duties and functions.
100% of the teachers lesson plan/log were properly checked and submitted the
5
observation log every end of the month.
84%-99% of the teachers lesson plan/log were properly checked and submitted the
4
observation log every end of the month.
Check lesson plans of teachers
68%-83% of the teachers lesson plan/log were properly checked and submitted the
in the assigned grade/subject 5% 3 4 5 1 3.33 0.17
observation log every end of the month.
area.
52%-67 of the teachers lesson plan/log were properly checked and submitted the
2
observation log every end of the month.
51%-below of the teachers lesson plan/log were properly checked and submitted the
1
observation log every end of the month.
100% of the target objectives were achieved, accomplishment with set agreements
5
were fully documented.
84%-99% of the target objectives were achieved, accomplishment with set
4
agreements were fully documented.
Conduct regular/periodic PTA 68%-83% of the target objectives were achieved, accomplishment with set
5% 3 4 5 3 4.00 0.20
meetings/conferences agreements were fully documented.
52%-67% of the target objectives were achieved, accomplishment with set
2
agreements were fully documented.
51%-below of the target objectives were achieved, accomplishment with set
1
agreements were fully documented.
Community
Involvement
(15%)
100% of the parents of the students needing academic monitoring was followed up
5
supported with documents.
Community
Involvement 84%-99% of the parents of the students needing academic monitoring was followed
4
(15%) up supported with documents.
Visit parents of pupils/students
68%-83% of the parents of the students needing academic monitoring was followed
needing academic 5% 3 2 2 2 2.00 0.10
up supported with documents.
monitoring/follow up
52%-67 of the parents of the students needing academic monitoring was followed up
2
supported with documents.
51%-below of the parents of the students needing academic monitoring was
1
followed up supported with documents.
5 100% of project accomplishment completed were achieved with documentation.
Undertake/initiate 4 84%-99% of project accomplishment partially achieved with documentation.
projects/events/activities with 5% 3 68%-83% of project accomplishment partially achieved with documentation. 5 5 5 5.00 0.25
external funding/sponsorship 2 52%-67 of project accomplishment partially achieved with documentation.
1 51%-below of project accomplishment partially achieved with documentation.
Conducted a completed action research and have presented in at least in the
5
Division Level Research Conference/Summit
Conducted a completed action research and have presented in at least in the District
4
Level Research Conference/Summit
Conducted action research 5% 2 2 4 2.67 0.13
Conducted a completed action research but have not presented the result in any
3
level of research conference/summit
2 Proposed an action research.
1 Conceptualize an action research
Led at least 5 teachers in conducting enrichment program to improve proficiency
5
level of at least 4 pupils to at least one step higher in every quarter.
Led at least 5 teachers in conducting enrichment program to improve proficiency
4
level of at least 2 pupils/students to at least one step higher in every quarter.
Take charge of the school
reading program, remedial 4% Led at least 3 teachers in conducting enrichment program to improve proficiency 3 5 3 3.67 0.15
3
and/or enrichment program. level of at least 3 pupils to at least one step higher in every quarter.
Led at least 3 teachers in conducting enrichment program to improve proficiency
Professional 2
level of at least 1 pupils/students to at least one step higher in every quarter.
Growth and
Development 1 No evidence of conducting remedial program
(15%)
Participated in the planning of at least 1 training program conducted in the division
5
level and submitted the consolidated outputs before the scheduled time.
Participate in the planning and Participated in the planning of at least 2 training programs conducted in the district
4
implementation of training level and submitted the consolidated outputs before the scheduled time.
3% 3 3 3 3.00 0.09
programs in school, district and Participated in the planning of at least 1 training program conducted in the district
division level. 3
level and submitted the consolidated outputs before the scheduled time.
Participated in the planning of at least 2 training program conducted in the school
2
level and submitted the consolidated outputs before the scheduled time
1 No evidence of participation in planning training programs
Attended 3 or more seminars, workshops trainings and echoed to teachers in an
5
excellent way with documentation
Participate in seminars, Attended 2 seminars, workshops trainings and echoed to teachers in an excellent
4
workshops, trainings within a way with documentation
3% 2 2 2 2.00 0.06
year (Division, Regional and
National) 3 Attended 3 or more seminars, workshops trainings but failed to echo to teachers.
2 Attended 2 seminars, workshops trainings but failed to echo to teachers.
1 No trainings attended
Attain five of the following: 5 Attained 5 indicators with documents
TOTAL (Excluding Plus Factor) 100% OVER - ALL RATING OF ASSESSMENT 3.40
2. Visit parents of
68%-83% of the parents of the students needing academic monitoring was followed
pupils/students needing Quarterly 2.5% 3
up supported with documents.
academic monitoring/follow up
52%-67 of the parents of the students needing academic monitoring was followed up
2
supported with documents.
51%-below of the parents of the students needing academic monitoring was
1
followed up supported with documents.
5 100% of project accomplishment completed were achieved with documentation.
3.Undertake/initiate 4 84%-99% of project accomplishment partially achieved with documentation.
projects/events/activities with Year round 2.5% 3 68%-83% of project accomplishment partially achieved with documentation.
external funding/sponsorship 2 52%-67 of project accomplishment partially achieved with documentation.
1 51%-below of project accomplishment partially achieved with documentation.
5 Attended 4 or more seminars, workshops trainings
Participate in seminars, 4 Attended 3 seminars, workshops trainings
workshops, trainings within a
Year round 5% 3 Attended 2 or more seminars, workshops trainings
year (District, Division,
Regional and National) 2 Attended 1 seminars, workshops trainings
1 No trainings attended
Professional Received 4 or more Special/Recognition Awards with supporting documents &
Growth and 5
accomplishment
Development
Received 3 Special/Recognition Awards with supporting documents with
(15%) 4
Serves as coordinator & accomplishment.
receive Special/Recognition Year round 5% Received 2 Special/Recognition Awards with supporting documents with
3
Awards accomplishment.
Received 1 Special/Recognition Awards with supporting documents with
2
accomplishment
1 No Special/Recognition Award & Acoomplishment
Serves as speaker in Seminar & planned/organized & managed SLAC session
5
(District & School)
Serves as speaker in Seminar & planned/organized & managed SLAC session in
4
Serves as speaker & school level with complete evidence
Planned/organized managed Year round 5% Serves as speaker in Seminar & planned/organized & managed SLAC session in
3
SLAC Session/Seminar school level with incomplete evidence
Serves as speaker in Seminar & planned/organized & managed SLAC session in
2
school level without evidence
1 Not speaker in seminar & no planned/organized SLAC session
TOTAL (Excluding Plus Factor) 100% OVER - ALL RATING OF ASSESSMENT
Plus Factor (winning coach/action research) 5% ADJECTIVAL RATING
Adjectival Rating Scale
Outstanding 4.500 5.000 Ratee: Rater:
Very Satisfactory 3.500 4.499
Satisfactory 2.500 3.499 _________________________ VICTORIA SUSAN A. ORIENTE, HT - III
Unsatisfactory 1.500 2.499 Teacher - I School Head
Poor 1.000 1.499