You are on page 1of 3

MEP 1st Fix Clearance from GAC for Ceiling Works

SBS Site MEP Clearance for Ceiling Grids PA Holiday Inn to be completed till Sep-13-22

Dry Area 27-Jul-22 GF Floor

Wet Area 7-Sep-22 Reception area 23-May-22

Corridors 6-May-22 Lobby Lounge 17-Apr-22

Vestibule Room 18-May-22

Media Lounge 1-Jun-22

Lift Lobby 27-Apr-22

Janitor Room 7-May-22

1st Floor

ADD (2) & Outdoor Deck 9-May-22

ADD (1) & ADD Entry Circulation 26-Apr-22

Meeting Rooms (1 & 2) / Prefunction Area (1) 28-Apr-22

Meeting Rooms (3 & 4) / Prefunction Area (2) 28-Apr-22

Store & Storage 1-May-22

Hotel Lift Lobby & FOH Corridor 27-Apr-22

Toilets / Prayer Room & Janitor Room 14-May-22

Meeting Room Toilets 14-May-22

2nd Floor

Health Club Area 19-Jun-22

Jantior & Storage Room 7-Jun-22

Yoga Room 11-Apr-22

F&B Juice Bar / Pantry / Outdoor Seating Area 21-May-22

Hotel Lift Lobby & FOH Corridor 27-Apr-22

Toilet & Changing Room 10-May-22


Activity ID Finish
ADD (2) & Outdoor Deck 9-May-22
ADD (1) & ADD Entry Circulation 26-Apr-22
Meeting Rooms (1 & 2) / Prefunction Area (1) 28-Apr-22
Meeting Rooms (3 & 4) / Prefunction Area (2) 28-Apr-22
Store & Storage 1-May-22
Hotel Lift Lobby & FOH Corridor 27-Apr-22
Toilets / Prayer Room & Janitor Room 14-May-22
Meeting Room Toilets 14-May-22
2nd Floor Level 19-Jun-22
Health Club Area 19-Jun-22
Jantior & Storage Room 7-Jun-22
Yoga Room 11-Apr-22
F&B Juice Bar / Pantry / Outdoor Seating Area 21-May-22
Hotel Lift Lobby & FOH Corridor 27-Apr-22
Toilet & Changing Room 10-May-22
Remaining Duration Budgeted Total Cost
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
61 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00
7 AED0.00

You might also like