2M.
TOP
HEADING
DRIFT METHOD OF TUNNELING
BENCH
TOP HEADING HEADING FACE
3M. TUNNELING IN ROCK IS MOSTLY AN OPERATION THAT HAS TO
BE CARRIED OUT AT CONSIDERABLE DEPTH BELOW THE
BOTTOM
NATURAL GROUND LEVEL.
HEADING DRILL HOLES
BENCH SOME OF THE METHODS ARE BRIEFLY DESCRIBED UNDER :
3) AMERICAN METHOD :
THIS METHOD IS SUITABLE FOR
TOP SIDE LARGE SIZE RAILWAY OR HIGHWAY TUNNELS. THIS METHOD
DRIFT DRIFT IS UNSUITABLE FOR TUNNELS HAVING FLAT BOTTOM.
POST
EXTENDED RING GIRDER
CUTTING
SILL POST PROPELLING
EDGE
JACK
SILL CAP SHOULDER
LINING TIMBER
HORIZONTAL
ENGLISH METHOD STIFFNER
POST STIFFNER
LAGGING STRUT
FOR SHIELD
HOOD
SILL IN FORM OF
RING GIRDER
SLIDING
WALL PLATE PLATFORM