You are on page 1of 5

Republic of the Philippines

DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT


REGION X
PROVINCE OF MISAMIS OCCIDENTAL
Address: LGU OROQUIETA CITY

MEMORANDUM

FOR : ARNEL M. AGABE, CESO III


Regional Director

THRU : PABLIO L. BENITEZ, JR., CESO V


Provincial Director

FROM : JOEL JOSE T. TABIL


C/MLGOO

1st
SUBJECT : SITUATIONAL REPORT FOR TC ODETTE

DATE : [DECEMBER 16, 2021 as of 10:00 AM]

I. SITUATIONAL OVERVIEW

Based on the report of DILG Provincial Offices, Misamis Occidental, the


weather situation in the AOR:

LGUs TCWS WEATHER CONDITION


OROQUIETA CITY - Moderate rain showers

II. COVERAGE OF AWARENESS

As of reporting time, [00] out of [00] or [00%] of LGUs are present within their
AORs. All concerned LGUs were informed of the updates regarding TC ODETTE
and were able to follow the Operation L!STO Disaster Preparedness Protocols, as
shown in the table below:

As of 16, DECEMBER 2021, 10:00 AM


CITY/MUNICIPALITY PROVINCE

# of M/C 0 0 0 0 0
PREPARE
Convened LDRRMC within 24 hour upon receiving a severe weather bulletin
0% 0% 0% 0% 0%
(GDrive Item 3)
Readied pre-emptive/forced Evacuation Plans (GDrive Item 6) 0% 0% 0% 0% 0%

Organized Administrative/Logistical Support Team (GDrive Item 7) 0% 0% 0% 0% 0%


Conducted inventory of supplies, equipment and stockpile of goods (GDrive
0% 0% 0% 0% 0%
Item 15)
RESPONSE
Organized Search, Rescue and Retrieval Teams (GDrive Item 8) 0% 0% 0% 0% 0%

Organized Security Teams (GDrive Item 9) 0% 0% 0% 0% 0%

Organized Medical Teams in ECs (GDrive Item 10) 0% 0% 0% 0% 0%

Organized Clearing Operations Team (GDrive Item 11) 0% 0% 0% 0% 0%

Informed Punong Barangays of weather advisory (GDrive Item 19) 0% 0% 0% 0% 0%


Disseminated public warnings thru established warning systems and weather
0% 0% 0% 0% 0%
bulletins, especially families in identified danger zones (GDrive Item 20)
Estimated Number of Evacuees (GDrive Item 5) 0% 0% 0% 0% 0%

Level of preparedness:

100-80% 79-51% 50-0%


complete complete complete

III. PREPAREDNESS MEASURES

page 2
Indicators:
Text in Blue fonts - New inputs
Text in Red fonts - For verifications
Text in Black fonts - Previous inputs
A. DILG PROVINCIAL ACTIONS

● Sent Regional Advisory on the Low Pressure Area to


DILG Oroquieta City, DILG Provincial/City Offices;
Misamis Occidental

B. DILG CITY/MUNICIPAL AND LGU ACTION


CITY/MUNICIPALITY ACTIONS
Oroquieta City DILG Actions
● Informed LCE and PBs on the updates on TC
ODETTE
● Advised LCEs to take the necessary actions

LGU Actions
 Convene LDRRMC
 Monitored flood prone barangays
 Monitored coastline and riverbanks
 Suspension of classes in all levels

IV. SPECIAL CONCERNS AND AREAS

A. STATE OF CALAMITY
PROVINCE/CITY City/Municipality REMARKS / RESOLUTION NO.
MISAMIS ● NONE
OROQUIETA CITY
OCCIDENTAL

B. CANCELLATION OF CLASSES
As of 16, DECEMBER 2021, 10:00 AM
indicator in remark (Private or Public, P - Pre-School, E - Elementary School, J - Junior High, S - Senior High, C - College,
or All-Levels)
Date of Date of
Province/City City/Municipality Remarks
cancellation resumption
MISAMIS
OROQUIETA CITY NONE NONE NONE
OCCIDENTAL

C. CANCELLATION OF WORK
As of 16, DECEMBER 2021, 10:00 AM
indicator in remark (Prv - Private, Gov - Government, or Both)
Date of Date of
Province/City City/Municipality Remarks
cancellation resumption
MISAMIS
OROQUIETA CITY NONE NONE NONE
OCCIDENTAL

page 3
Indicators:
Text in Blue fonts - New inputs
Text in Red fonts - For verifications
Text in Black fonts - Previous inputs
V. STATUS OF LIFELINE

A. DAMS (if applicable)


As of 16, DECEMBER 2021, 10:00 AM
(m - meter or cms - centimeter)
Normal Gate
Reservoir Estimated
High Opening
Water
Dam Name LOCATION Water
Level Outflo
Level Gates Height Inflow
(RWL) w
(NHWL)
N/A N/A N/A N/A

B. ROADS
As of 16, DECEMBER 2021, 10:00 AM
before road name (NR - National Road, PR- Provincial Road, CR - City Road, MR - Municipal Road or BR - Barangay Road)
Province/City City/Municipality Road Name Status Remarks
N/A
MIS.OCC. OROQUIETA CITY N/A
.

C. BRIDGES

As of 16, DECEMBER 2021, 10:00 AM


before bridge name (TD - Total Damage, PDj - Partially Major Damage or PDm - Partially Minor Damage)
Province City/Municipality Bridge Name Status Remarks
MIS.OCC. OROQUIETA CITY N/A N/A N/A

D. POWER INTERRUPTION
As of 16, DECEMBER 2021, 10:00 AM
Date & Time
Date & Time of
Province/City City/Municipality Areas
of outage restoration
/remarks
MIS.OCC. OROQUIETA CITY N/A N/A N/A

E. SEAPORTS
As of 16, DECEMBER 2021, 10:00 AM
(Suspended or Resumed)
Date of
Status of Date of
Province/City Port Name recommence/
operation abeyance
Remarks
MIS.OCC. N/A N/A N/A N/A

VI. FLOODED AREAS

page 4
Indicators:
Text in Blue fonts - New inputs
Text in Red fonts - For verifications
Text in Black fonts - Previous inputs
As of 16, DECEMBER 2021, 10:00 AM
***use the MMDA FLOOD GAUGE indicator in this link: Flood Gauge
depth of flooding for normal adult height (G- Gutter Level, HK - Half Knee Level, HT - Half Tire Level, K - Knee Level,
T - Tire Level, W - Waist Level, C - Chest Level, I - Above Head or Immeasurable, or S - Subsided)

Province/City City/Municipality Barangay Street Depth of Cause of


Flooding Flooding /
Remarks
MIS.OCC. OROQUIETA CITY N/A N/A N/A N/A

VII. IMPACTS

(Please See Link for Annex A) - link for Pre-Emptive Evacuation / Evacuees
Insert Link Here of your Google Spreadsheet (DORMs)

VIII. CASUALTIES

(Please See Link for Annex B) - link for MDM


MDM Template

PREPARED BY:

JOEL JOSE T. TABIL


CLGOO

page 5
Indicators:
Text in Blue fonts - New inputs
Text in Red fonts - For verifications
Text in Black fonts - Previous inputs

You might also like