Professional Documents
Culture Documents
79
www.hilti.in
Company: Page: 1
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
Specifier's comments:
1 Input data
Anchor type and diameter: HST2-R M8 hmin1
Return period (service life in years): 50
Item number: 2227482 HST2-R M8x95/30
Effective embedment depth: hef = 47.0 mm, hnom = 55.0 mm
Material: A4
Evaluation Service Report: ETA-15/0435
Issued I Valid: 21/12/2017 | -
Proof: Design Method ETAG (No. 001 Annex C/2010)
Stand-off installation: without clamping (anchor); restraint level (anchor plate): 2.00; eb = 5.0 mm; t = 10.0 mm
2
Hilti Grout: , multipurpose, fc,Grout = 30.00 N/mm
Anchor plate :
R lx x ly x t = 200.0 mm x 200.0 mm x 10.0 mm; (Recommended plate thickness: 9.0 mm)
R
- The anchor calculation is based on a rigid anchor plate assumption.
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
1
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 2
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
2
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 3
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
N
NSd £ NRd,s = Rk,s ETAG 001 Annex C, Table 5.2.2.1
gM,s
y c · NRk,p
NSd £ NRd,p = ETAG 001 Annex C, Table 5.2.2.1
gM,p
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
3
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 4
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
N
NSd £ NRd,c = Rk,c ETAG 001 Annex C, Table 5.2.2.1
gM,c
0 Ac,N
NRk,c = NRk,c · 0
· y s,N · y re,N · y ec1,N · y ec2,N ETAG 001 Annex C, Eq. (5.2)
Ac,N
0 1,5
NRk,c = k1 · √fck,cube · hef ETAG 001 Annex C, Eq. (5.2a)
0
Ac,N = scr,N · scr,N ETAG 001 Annex C, Eq. (5.2b)
c
y s,N = 0.7 + 0.3 · 1.00 ETAG 001 Annex C, Eq. (5.2c)
ccr,N £
hef
y re,N = 0.5 + 1.00 ETAG 001 Annex C, Eq. (5.2d)
200 £
1
y ec1,N = 1.00 ETAG 001 Annex C, Eq. (5.2e)
2 · ec1,N £
1+
scr,N
1
y ec2,N = 1.00 ETAG 001 Annex C, Eq. (5.2e)
2 · ec2,N £
1+
scr,N
2 0 2
Ac,N [mm ] Ac,N [mm ] ccr,N [mm] scr,N [mm]
34,616 19,881 70.5 141.0
Group anchor ID
3, 4
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
4
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 5
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
N
NSd £ NRd,sp = Rk,sp ETAG 001 Annex C, Table 5.2.2.1
gM,sp
0 Ac,N
NRk,sp = NRk,c · 0
· y s,N · y re,N · y ec1,N · y ec2,N · y h,sp ETAG 001 Annex C, Eq. (5.3)
Ac,N
0 1,5
NRk,c = k1 · √fck,cube · hef ETAG 001 Annex C, Eq. (5.2a)
0
Ac,N = scr,sp · scr,sp ETAG 001 Annex C, Eq. (5.2b)
c
y s,N = 0.7 + 0.3 · 1.00 ETAG 001 Annex C, Eq. (5.2c)
ccr,sp £
1
y ec1,N = £ 1.00 ETAG 001 Annex C, Eq. (5.2e)
1+ ( 2 · ec1,N
scr,sp )
1
y ec2,N = £ 1.00 ETAG 001 Annex C, Eq. (5.2e)
1+ ( 2 · ec2,N
scr,sp )
2/3
y h,sp = (hh )min
£ 1.5 ETAG 001 Annex C, Eq. (5.3a)
0 2
Ac,N [mm ]
2
Ac,N [mm ] ccr,sp [mm] scr,sp [mm] y h,sp
34,616 19,881 70.5 141.0 1.500
Group anchor ID
3, 4
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
5
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 6
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
M
M V
VSd £ VRd,s = Rk,s ETAG 001 Annex C, Table 5.2.3.1
gM,s,b
M a · MRk,s
VRk,s = M ETAG 001 Annex C, Eq. (5.5)
l
MRk,s
0
= MRk,s · (1 - NN ) Sd
Rd,s
ETAG 001 Annex C, Eq. (5.5a)
t
l = ec + + a3 ETAG 001 Annex C, Eq. (4.2)
2
l [mm] aM
14.0 2.00
0 0
NSd / NRd,s 1 - NSd / NRd,s MRk,s [kNm] MRk,s = MRk,s (1 - NSd/ NRd,s) [kNm]
0.197 0.803 0.027 0.022
M M
VRk,s = aM * MRk,s / l [kN] gMs,b,V VRd,s [kN] VSd [kN]
3.096 1.250 2.477 0.173
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
6
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 7
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
V
VSd £ VRd,cp = Rk,cp ETAG 001 Annex C, Table 5.2.3.1
gM,c,p
VRk,cp = k · NRk,c ETAG 001 Annex C, Eq. (5.6)
0 A
NRk,c = NRk,c · 0c,N · y s,N · y re,N · y ec1,N · y ec2,N ETAG 001 Annex C, Eq. (5.2)
Ac,N
0 1,5
NRk,c = k1 · √fck,cube · hef ETAG 001 Annex C, Eq. (5.2a)
0
Ac,N = scr,N · scr,N ETAG 001 Annex C, Eq. (5.2b)
c
y s,N = 0.7 + 0.3 · 1.00 ETAG 001 Annex C, Eq. (5.2c)
ccr,N £
hef
y re,N = 0.5 + 1.00 ETAG 001 Annex C, Eq. (5.2d)
200 £
1
y ec1,N = 1.00 ETAG 001 Annex C, Eq. (5.2e)
2 · ec1,V £
1+
scr,N
1
y ec2,N = 1.00 ETAG 001 Annex C, Eq. (5.2e)
2 · ec2,V £
1+
scr,N
2 0 2
Ac,N [mm ] Ac,N [mm ] ccr,N [mm] scr,N [mm] k-factor
16,215 19,881 70.5 141.0 2.000
Group anchor ID
4
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
7
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 8
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
V
VSd £ VRd,c = Rk,c ETAG 001 Annex C, Table 5.2.3.1
gM,c
0 Ac,V
VRk,c = VRk,c · 0
· y s,V · y h,V · y a,V · y ec,V · y re,V ETAG 001 Annex C, Eq. (5.7)
Ac,V
0 a b 1,5
VRk,c = k1 · dnom · lf · √fck,cube · c1 ETAG 001 Annex C, Eq. (5.7a)
0,5
a = 0.1 · () lf
c1
ETAG 001 Annex C, Eq. (5.7b)
0,2
= 0.1 · (
c )
d nom
b ETAG 001 Annex C, Eq. (5.7c)
1
0 2
Ac,V = 4.5 · c1 ETAG 001 Annex C, Eq. (5.7d)
c2
y s,V = 0.7 + 0.3 · 1.00 ETAG 001 Annex C, Eq. (5.7e)
1.5 · c1 £
0,5
y h,V = (1.5h· c ) 1
³ 1.00 ETAG 001 Annex C, Eq. (5.7f)
√
1
2
y a,V =
(cos aV) +
2
(sin2.5a )
V ³ 1.00 ETAG 001 Annex C, Eq. (5.7g)
1
y ec,V = 1.00 ETAG 001 Annex C, Eq. (5.7h)
2 · ec,V £
1+
3 · c1
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
8
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 9
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
a a
bN + bV £ 1.0
Comments: Tension displacements are valid with half of the required installation torque moment for uncracked concrete! Shear displacements
are valid without friction between the concrete and the anchor plate! The gap due to the drilled hole and clearance hole tolerances are not
included in this calculation!
The acceptable anchor displacements depend on the fastened construction and must be defined by the designer!
7 Warnings
• The anchor design methods in PROFIS Engineering require rigid anchor plates per current regulations (AS 5216:2021, ETAG 001/Annex C,
EOTA TR029 etc.). This means load re-distribution on the anchors due to elastic deformations of the anchor plate are not considered - the
anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Engineering
calculates the minimum required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions
explained above. The proof if the rigid anchor plate assumption is valid is not carried out by PROFIS Engineering. Input data and results
must be checked for agreement with the existing conditions and for plausibility!
• Checking the transfer of loads into the base material is required in accordance with ETAG 001, Annex C(2010)Section 7! The software
considers that the grout is installed under the anchor plate without creating air voids and before application of the loads.
• The design is only valid if the clearance hole in the fixture is not larger than the value given in Table 4.1 of ETAG 001, Annex C! For larger
diameters of the clearance hole see Chapter 1.1. of ETAG 001, Annex C!
• The accessory list in this report is for the information of the user only. In any case, the instructions for use provided with the product have to
be followed to ensure a proper installation.
• The characteristic bond resistances depend on the return period (service life in years): 50
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
9
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 10
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
(1)
Mallée, R.; Riemann, H. (1990): Ankerplattenbefestigungen mit Hinterschnittdübeln,
Bauingenieur 65 (1990), S. 49 - 57, Springer VDI-Verlag, 1990
Mallée, R.; Burkhardt, F. (1999): Befestigungen von Ankerplatten mit Dübeln, Beton und
Stahlbetonbau 94, Heft 12, S. 502 - 511, Ernst & Sohn Verlag, 1999
8.2 Results
Stress distribution s 11
2
171.84 [N/mm ]
2
-32.99 [N/mm ]
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
10
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 11
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
Stress distribution s 22
2
135.50 [N/mm ]
2
-76.28 [N/mm ]
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
11
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 12
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
Deformations (z-direction)
0.1 [mm]
-0.2 [mm]
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
12
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 13
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
9 Installation data
2
Anchor plate, steel: E 250 (Fe 410 W) A; E = 200,000.00 N/mm ; fyk = 250.00 Anchor type and diameter: HST2-R M8 hmin1
2
N/mm
Profile: Square Hollow Sections India, ; (L x W x T) = 100.0 mm x 100.0 mm x Item number: 2227482 HST2-R M8x95/30
4.0 mm
Hole diameter in the fixture: df = 9.0 mm Maximum installation torque: 20 Nm
Plate thickness (input): 10.0 mm Hole diameter in the base material: 8.0 mm
Recommended plate thickness: 9.0 mm Hole depth in the base material: 65.0 mm
Drilling method: Hammer drilled Minimum thickness of the base material: 100.0 mm
Cleaning: Manual cleaning of the drilled hole according to instructions for use is
required.
Hilti HST2 stud anchor with 55 mm embedment, M8 hmin1, Stainless steel, installation per ETA-15/0435
y
100.0 100.0
25.0
3 4
100.0
150.0
x
100.0
1 2
25.0
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
13
Hilti PROFIS Engineering 3.0.79
www.hilti.in
Company: Page: 14
Address: Specifier:
Phone I Fax: | E-Mail:
Design: Concrete - Aug 8, 2022 Date: 09/08/2022
Fastening point:
Input data and results must be checked for conformity with the existing conditions and for plausibility!
PROFIS Engineering ( c ) 2003-2022 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
14