You are on page 1of 13

Lean Manufacturing

Improvements.
Presenting By Sudip Roy
Lean Aim – Waste Elimination / Reduction

Muda ( NVA – TIMWOOD)


Mura – Process Variation
Muri- Fatigue ( Ergonomics )
Muri
Aim – Operator fatigue Elimination ( Machine Shop )

BEFORE SITUATION –
DIFFERENT SIZES OF NUTS.
TO OPEN / CLOSE IT REQIRES
DIFFERENT SIZE SPANNER .

AFTER SITUATION –
COMMONIZATION OF NUT .
SAME SIZE . SINGKE SOCKET
HELPING TO OPEN / CLOSE IT
.
Mura
Aim – Reduced Process variation radial offset G54 ( Machine Shop )

BEFORE SITUATION –
IN HOBBING MACHINE X
OFFSET ERROR ( Radial
Offset ) – ERROR 0.08 mm

AFTER SITUATION –
ERROR 0.0 mm .
INTRODUCED LASER
CALIBRATION .
Mura
Aim – Mould flow cavity breakage prevented ( Process Improvement )

BEFORE SITUATION –
4 FLUTE BALL NOSE USED
RESULT MOULD BREAKAGE .

AFTER SITUATION –
2 FLUTE BALL NOSE USED
WITH SAME RPM/ FEED .
RESULTS NO BRAEKAGE IN
MOULD ( SAND EVACUATION
EASY ) .
Muda
T I M W O O D ( Reduced waiting time )
Lean Tool Used – SMED

BEFORE SITUATION –
ONE CARRIER . AFTER
ONE CYCLE WAIT FOR
SETTING .

AFTER SITUATION –
INTERCHANGABLE 2NOS
CARRIER USED . WAITING TIME
REDUCED
Muda
I
T M w O O D ( Reduced Lead time )

BEFORE SITUATION –
HOBB TOOL MANUFACTURING
LEAD TIME SUPPLIER MIN 3
MONTHS

AFTER SITUATION –
WE CAN CUT ANY GEAR
TERMINOLOGY ( MIN
LIMITATION ) WITH HELP OF
FROM CUTTER & BALL NOSE .

Note – GEAR CNC BLANK TURNING SUPPLIER & US CREATED MOM FOR
SELF CERTIFIED PRODUCT – REDUCED WIP IN INCOMING STAGE .
Muda
TI M w O O D ( Line Balancing )
BEFORE SITUATION – AFTER SITUATION –
UNBALANCE LINE BALANCE LINE
BOTTLE NECK – SINGLE ACTION TAKEN – THREE
WASHING MACHIE WASHING MACHINE
LAYOUT – PRODUCT LAYOUT LAYOUT – PROCESS LAYOUT

• TOOL USED FOR MOTION CAPTURING – SPAGHETTI DIAGRAM


KAIZENS
• Reduced Step over in Machining 0.5 to 0.3 mm in Finishing strategy in CNC
Programming (Surface Roughness N8 )
• Last piece Inspection introduced for Job & Fixture – IATF 16949
• Used Hitachi make Coted insert instead of solid carbide Ball nose ( Ra Value
achieved & Fast Machining ).
• Utilization of Shrink fit adaptor to eliminate cutter Run out ( with in 0.01 mm) .
• Clinometer Introduced to quick Checking Hobbing Machine axis .
APPLICATION OF CAM PROGRAMMING – MASTER CAM

SKILL SET
INDEPENDLY
OPERRATE BOTH
PROGRAMMING
& OPERATING
Major contribution for manufacturing of G5220 Gear Box Parts
Manufacturing several parts like Gears , Shaft on time delivery in
Tata Motors
NON ROTUINE ACTIVITIES
1. ASSOCIATES WITH BHARAT SEVASHRAM SANGHA .
2. GIVING TECHNICAL TRAINING IN TEPL FOR UNDER DEVELOP GIRLS WITH COLABORATION NTTF .

You might also like