OUTSTANDING WORKS ON THE BROMPTON MINE BALL MILL

Item Work To Be Done

BALL SHELL
1 to design end liners
2 marking and drilling on shell for liners

3 castings of liners
4 assembly of shell and side liners

5 design of door liner and locking mechanism

6 rubberising 2 off spout


7 drill and tipper M16 for mounting spouts
8 pour concrete ot secure spout
9 outside painting on ball mill(grey colour)
10 attend to ball mill crack on girth gear

DRIVING MECHANISM

11 pinion machining

12 2 off coupling to be machined

13 pulley machining

14 V-belt specs and procurement(see drawings)

15 Ø160mm x2.4m shaft


16 maching of the shaft as per drawing

17 procurement of 2 off bearing and plummer block

18 gear box oil


19 insertion of white metal on 1 off trunion
20 cover plate on trunion for block greasing-see drwaing
21 cut protruding section on Shaft mounting base
22 painting of all possible parts to be painted
Due Date Responsible Person Comments

15/03/22 Masvosva/Zitha
Manyewe

Foundry Design Drawing to be given to foundry.


Manyewe

18/03/22 Masvosva/Zitha Design Drawing to be given to foundry.

Manyewe/Mhembere Completed
Manyewe
Manyewe
Manyewe
Manyewe

Need payment at Paddox Gears. Submitted


Gwaze Requests to Finance
Need payment at Paddox Gears
Gwaze SubmittedRequests to Finance

Machinining complete. Going for keyway


Gwaze cutting at Paddock 31/03/22
Waiting for Drawing with Specs from Design
Gwaze Office

Manyewe Need payment at Steel Warehouse


Manyewe

Requisition submitted to Procurement. Lead


Gwaze time +/_9 months to complete order.
To be Filled up at the Mine after installation.
Gwaze Mine to provide oil.
The Two components need to be welded
together before whiteb metalling. Machining
Gwaze mating surfaces in progress.
Manyewe
Manyewe
Manyewe
Value

ZWL 844 637.50 as


at 04/02/22
ZWL 472 312.50 as
at03/02/22

Still to be Quoted

Still to be Quoted

ZAR 103 377.46 as


at16/02/22