Drainage
meter
Volume (w/o hole): 0.262 Vol. (Outer) 0.414
Volume (1 hole): 0.21132925 Vol. (Inner) 0.152
Volume (2 hole): 0.1606585 Total Volume: 0.262
Volume (3 hole): 0.00864626
25.4
meter
0.254
0.762
Drainage Estimate
Cost Total Cost Days Total Days
Main Road Pipeline 52819.75 60675.07 15.88564 18.24814
Man Hole 7855.32 2.362502
Road Lot 2 Pipeline 12411.95 14301.29 3.732916 4.30114
Man Hole 1889.344 0.568224
Road Lot 3 Pipeline 13870.92 15760.26 4.171705 4.739929
Man Hole 1889.344 0.568224
Road Lot 4 Pipeline 76557.85 89136.53 23.02492 26.80798
Man Hole 12578.68 3.783062
Road Lot 5 Pipeline 18516.71 21648.67 5.568935 6.510878
Man Hole 3131.96 0.941943
Road Lot 6 Pipeline 37558.84 43524.82 11.29589 13.09017
Man Hole 5965.976 1.794279
Road Lot 7 Pipeline 84150.89 97027.51 25.30854 29.18121
Man Hole 12876.62 3.872669
47
12
23
51
30" RCP
Length: 105.8313
Price: 190496.3
MainRoad RCP Pcs 10" RCP Price 10mm SB 12mm SB
Pipe Length : 107.7954 108 37728.39 89.6 278.4
No.of manhole: 8 14.93333 46.4
Total Vol. Manhole: 1.3359 15 47
Cement 8.0154 1877.621 Price
Sand 0.66795 408.1784 2220 15040
Gravel 1.3359 1632.714
Total RCP Price (10") Total 10" RCP (pcs) Total 10mm SB Pcs Price
211347.8 607 91 13468
Total Price: Labor Cost Total Cost per road: Days: Total Sand (volume)
249403.2 99761.3 349164.5 15.71044 3.9274
16
Total Gravel (volume)
7.8548