LOGIC BYPASS/ MODIFICATION REQUEST FORM

Format no. JSL/BNF/GEN/FORM/06/ R1

S.N
. LOGIC BYPASS / MODIFICATION DETAILS
1
LINE NO.    1
2
INSTRUMENT TYPE    ROD MILL AND SLURRY PUMPS
3  ROD MILL-3,RM-3 SLP-1&2, PLANT A TO
INSTRUMENT TAG NO.   PLANT B SLURRY TRANSFER PUMP
4   NEW LOGIC
IMPLEMENTATIO Provision of mill power(KW) consumption
LOGIC TO BE BYPASSED/ MODIFIED N excel report (5:45am to 5:45am)
5 We don’t have day wise mill power
REASON FOR BYPASS/ MODIFICATION   consumption report in one sheet.
6
DURATION OF BYPASS FROM TO
 
DATE  20-07-2022  
TIME  
7 APPROVAL SIGNATURES FOR LOGIC BYPASS/ SIGN NAME
MODIFICATION
 
REQUESTER    Subhash

SHIFT IN-CHARGE: OPERATION   Vivek Chandra

AREA IN-CHARGE: OPERATION    Ritesh Chopkar

AREA IN-CHARGE: MECHANICAL    

AREA IN-CHARGE: E & I    Dhoop Singh

PLANT IN-CHARGE: BENEFICIATION (A/ B/ FP)    

PLC ENGINEER    Amit Dixit


DATE & TIME OF BYPASS/ MODIFICATION DATE: ___________ TIME: __________
8 APPROVAL SIGNATURES FOR RESTORING SIGN NAME
LOGIC (APPLICABLE ONLY IN CASE OF BYPASS)
 
REQUESTER    

SHIFT IN-CHARGE: OPERATION    

AREA IN-CHARGE: OPERATION    

AREA IN-CHARGE: MECHANICAL    

AREA IN-CHARGE: E & I    

PLANT IN-CHARGE: BENEFICIATION (A/ B/ FP)    

PLC ENGINEER    
DATE & TIME OF RESTORING LOGIC DATE: ___________ TIME: __________