. LOGIC BYPASS / MODIFICATION DETAILS
1
LINE NO. 1
2
INSTRUMENT TYPE ROD MILL AND SLURRY PUMPS
3 ROD MILL-3,RM-3 SLP-1&2, PLANT A TO
INSTRUMENT TAG NO. PLANT B SLURRY TRANSFER PUMP
4 NEW LOGIC
IMPLEMENTATIO Provision of mill power(KW) consumption
LOGIC TO BE BYPASSED/ MODIFIED N excel report (5:45am to 5:45am)
5 We don’t have day wise mill power
REASON FOR BYPASS/ MODIFICATION consumption report in one sheet.
6
DURATION OF BYPASS FROM TO
DATE 20-07-2022
TIME
7 APPROVAL SIGNATURES FOR LOGIC BYPASS/ SIGN NAME
MODIFICATION
REQUESTER Subhash
PLC ENGINEER
DATE & TIME OF RESTORING LOGIC DATE: ___________ TIME: __________