Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 2 of 11
SHEET
REVISIONS SHEET
REVISIONS
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
1 X 31
2 X 32
3 X X 33
4 X X 34
5 X 35
6 X 36
7 X 37
8 X 38
9 X 39
10 X 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 3 of 11
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 4 of 11
REVIEW CHECKLIST
6 Suryani RPE
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 5 of 11
LIST OF CONTENT
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 6 of 11
1. INTRODUCTION
As part of Mahakam Development 2020 and beyond (Tunu Shallow 5 & 6, Tunu 13E & F) drastic
optimization measures shall be taken to ensure that the well connection remains economical. Part of
the optimization is have 2 pipeline network based on flowrate requirement. High flowrate pipeline will be
equipped with 8” pipeline and low flowrate pipeline will be equipped with 6” pipeline. Preliminary study
has been performed and shows that there will be roughly 1 : 9 ratio between 8” and 6” pipeline
requirement.
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 7 of 11
2. PURPOSE
The purpose of this datasheet is to summarize the requirement for 6.625” OD linepipe for pipeline
sealine section of TUNU Development Project.
This datasheet is a supplementary document of the Project Particular Specification Linepipe, Document
Number ID-SPU-ALL-1080-552002 which defined as the Project Particular Specification Linepipe
Specification (HFW).
3.2. Abbreviations
API : American Petroleum Institute
BM : Base Metal
CVN : Charpy V-Notch
ECA : Engineering Criticality Assessment
EMI : Electromagnetic Inspection
HAZ : Heat Affected Zone
HFW : High Frequency Welded
NDT : Non Destructive Test
OD : Outside Diameter
PPS : Project Particular Specification
PWHT : Post-Weld Heat Treatment
SMLS : Seamless
UT : Ultrasonic Testing
WM : Weld Metal
WT : Wall Thickness
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 8 of 11
4. REFERENCES
4.1. Standard Codes
[1] API SPEC 5L, Specification for Line Pipe, 45th Edition, 2015
[2] ASME B31.8, Gas Transmission and Distribution System, 2016
[3] ASTM A370 rev A, Standard Test Methods and Definitions for Mechanical Testing of Steel
Products, 2017
4.2. National Regulations
[4] KepMen No. 300K/38/M.PE/1997, Keputusan Menteri Pertambangan dan Energi mengenai
Keselamatan Kerja Pipe Penyalur Minyak dan Gas Bumi (Decree of the Minister of Mines and
Energy Regarding Oil and Gas Pipeline Occupational Safety), 1997
[5] PerMen ESDM No. 17/2018, Peraturan Menteri Energi dan Sumber Daya Mineral Republik
Indonesia Tentang Impor Barang Operasi untuk Kefiatan Usaha Hulu Minyak dan Gas Bumi
(Rule of the Minister of Mines and Energy Regarding Import of Material for Upstream Oil and Gas
Industries), 2018
4.3. PHM General Specifications
[6] MHK-COMP-SPE-EP-PLR-0100, Submarine Pipeline System
[7] MHK-COMP-SPE-EP-PLR-0215, Line Pipe (HFW Carbon Steel)
[8] MHK-COMP-SPE-EP-PLR-0205, Carbon steel, clad and lined pipe manufacturing for linepipe
applications according to API SPEC 5L and DNV-OS-F101 (sweet and sour service, onshore and
offshore)
4.4. Project Documents
[9] ID-SPU-ALL-0108-552001, Wall Thickness Calculation
[10] ID-SPU-ALL-0108-552002, Project Particular Specification Linepipe Specification (HFW)
[11] ID-SPU-ALL-0108-552004, Pipeline Basis of Design
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 9 of 11
Table 5-1: Linepipe Datasheet for 6.625” OD Pipeline System of TUNU Development Project
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 10 of 11
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 11 of 11
Hard Stamp Pipe number shall be hard stamped on bevelled face at one pipe
end.
Paint Stencilling Longitudinal paint stencilling shall be used for marking. The
location of paint stencil is on the outside surface starting at a
point between 450mm and 760mm from the end of the pipe
8 HANDLING, TRANSPORT & STORAGE
Handling, Transport & Storage In accordance with MHK-COMP-SPE-EP-PLR-0215, Section 14.
Linepipes shall be packed for marine transportation and six
months preservation minimum
Bevel Protector Polyethylene bevel protector shall be used to protect the bevel
end as per Attachment 3 of Ref. [10].
Notes: (1) Section break sealine: Offshore pipeline from KP 0.00 – End of sealine
(2) Refer to Material Requisition and MTOs for Linepipe and Mother Pipe for detailed quantity including spares and contingency
(3) The minimum required wall thickness refers to Wall Thickness Calculation, Document No. ID-SPU-ALL-0108-552001
(4) The corrosion allowance for pipeline system is 2mm based on ECA result.
(5) Defects shall only be removed by grinding provided that the wall thickness is not reduced locally below the minimum
specified wall thickness.
After grinding the pipe shall be inspected by the process which detected the defect (UT or EMI), completed by wet MPI, to
ensure that the defect is completely removed and that the repair is acceptable. Wall thickness measurements shall be made
by UT in the ground areas. The results shall be recorded.
This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1