You are on page 1of 11

Document Number

PROJECT PARTICULAR SPECIFICATION 6 IN


ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 1 of 11

PERTAMINA HULU MAHAKAM


TUNU DEVELOPMENT PROJECT

PROJECT PARTICULAR SPECIFICATION 6 IN PIPELINE


DATASHEET (HFW)

0.1 6-Feb-2019 AFD Approved for Detail Design HLU HW EA


0.0 30-Jan-2019 IFC Issued for Comment HLU HW EA
Rev Date Status Revision memo Issued Checked Approved COMPANY

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 2 of 11

TABULATION OF REVIEW PAGES

SHEET
REVISIONS SHEET
REVISIONS
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
1 X 31
2 X 32
3 X X 33
4 X X 34
5 X 35
6 X 36
7 X 37
8 X 38
9 X 39
10 X 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 3 of 11

COMMENT RESPONSE SHEET

No. Page Comment Initial Response


Please ensure the latest applicable
1 6 edition/revision are applied for this FAN Incorporated
project.
These are neither standards nor codes.
These are Indonesia National regulation.
2 6 FAN Incorporated
It's better to create new section (e.g. §
4.3 National Regulations) and these two
documents are put in it.
PLR 205 is referred here for chapter 15 –
PLR 205 is not applicable for HFW line
3 6 FAN Documentation only as supplement for
pipe.
PLR 215.
Stated charpy impact test value is for full
size specimen, if the specimen is not full
4 8 AA Incorporated
size, the values shall be modified as per
PLR 205
5 8 Add residual stress requirement FA Incorporated
6 8 Add defect acceptance criteria FA Incorporated
Mill hydrotest pressure to follow PLR 215
7 8 AA Incorporated
instead of API 5L
Method to perform ring split test is
Please specify how to perform ring split
available in PLR 215 and PPS Linepipe
8 8 residual stress test. Put the sketch to FAN
Specification (HFW), thus will not be noted
make a better understandings.
in datasheet.
9 8 Max. 20 Gauss (2.0 mT) FAN Incorporated
Acceptance criteria shall be established
based on AUT response as follow:
For surface connected flaw:
As standard reflector, notch N5 (0.47
mm) with maximum length 50 mm shall
be used. Any flaw amplitude greater than
10 8 amplitude of notch N5 (0.47 mm) shall FAN Incorporated
be considered as defect.
For embedded flaw:
As standard reflector, FBH 1.6 mm shall
be used. Any flaw amplitude greater than
amplitude of FBH 1.6 mm shall be
considered as defect.
No, this mill hydrotest pressure is
11 8 is it a typo?? FAN calculated based on PLR 215 chapter
10.2.6.

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 4 of 11

REVIEW CHECKLIST

No. Name Department Signature

1 Jarot Wahyudianto ECP

2 Erista Analia ECP/STD

3 Bagus Putranto ECP/SVC

4 Siswo Prayitno ECP/CST

5 Nicasius Haryo Baskoro ECP/QSE

6 Suryani RPE

7 Ardian Fandika RPE/MAT

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 5 of 11

LIST OF CONTENT

1.  INTRODUCTION ............................................................................................................................ 6 

2.  PURPOSE ...................................................................................................................................... 7 

3.  DEFINITIONS AND ABBREVIATIONS ......................................................................................... 7 


3.1.  Definitions........................................................................................................................................... 7 
3.2.  Abbreviations ..................................................................................................................................... 7 

4.  REFERENCES ............................................................................................................................... 8 


4.1.  Standard Codes ................................................................................................................................. 8 
4.2.  National Regulations ......................................................................................................................... 8 
4.3.  PHM General Specifications ............................................................................................................. 8 
4.4.  Project Documents ............................................................................................................................ 8 

5.  LINEPIPE DATASHEET FOR 6.625” OD PIPELINE SYSTEM .................................................... 9 

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 6 of 11

1. INTRODUCTION
As part of Mahakam Development 2020 and beyond (Tunu Shallow 5 & 6, Tunu 13E & F) drastic
optimization measures shall be taken to ensure that the well connection remains economical. Part of
the optimization is have 2 pipeline network based on flowrate requirement. High flowrate pipeline will be
equipped with 8” pipeline and low flowrate pipeline will be equipped with 6” pipeline. Preliminary study
has been performed and shows that there will be roughly 1 : 9 ratio between 8” and 6” pipeline
requirement.

Figure 1-1: TUNU Area

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 7 of 11

2. PURPOSE
The purpose of this datasheet is to summarize the requirement for 6.625” OD linepipe for pipeline
sealine section of TUNU Development Project.
This datasheet is a supplementary document of the Project Particular Specification Linepipe, Document
Number ID-SPU-ALL-1080-552002 which defined as the Project Particular Specification Linepipe
Specification (HFW).

3. DEFINITIONS AND ABBREVIATIONS


3.1. Definitions
For the purpose of this specification, the following definitions shall be considered:
COMPANY : PERTAMINA HULU MAHAKAM
MANUFACTURER : The MANUFACTURER or VENDOR of materials, his representative or
agent
SUPPLIER : Organization(s) responsible for the supply of materials, equipment or
services as described within this document.
Shall : Indicates mandatory requirement. No deviation shall be allowed.
Should : Indicates a preferred requirement. Deviation shall be sent by SUPPLIER
to COMPANY for approval.
Approval : Authorizations in writing given by the COMPANY to the SUPPLIER on a
procedure or to proceed with the performance of a specific part of the
work without releasing in any way the SUPPLIER from any of his
obligations or liabilities under the Contract or at Law. The word Approve,
Approved and Approval shall be construed accordingly.

3.2. Abbreviations
API : American Petroleum Institute
BM : Base Metal
CVN : Charpy V-Notch
ECA : Engineering Criticality Assessment
EMI : Electromagnetic Inspection
HAZ : Heat Affected Zone
HFW : High Frequency Welded
NDT : Non Destructive Test
OD : Outside Diameter
PPS : Project Particular Specification
PWHT : Post-Weld Heat Treatment
SMLS : Seamless
UT : Ultrasonic Testing
WM : Weld Metal
WT : Wall Thickness

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 8 of 11

4. REFERENCES
4.1. Standard Codes
[1] API SPEC 5L, Specification for Line Pipe, 45th Edition, 2015
[2] ASME B31.8, Gas Transmission and Distribution System, 2016
[3] ASTM A370 rev A, Standard Test Methods and Definitions for Mechanical Testing of Steel
Products, 2017
4.2. National Regulations
[4] KepMen No. 300K/38/M.PE/1997, Keputusan Menteri Pertambangan dan Energi mengenai
Keselamatan Kerja Pipe Penyalur Minyak dan Gas Bumi (Decree of the Minister of Mines and
Energy Regarding Oil and Gas Pipeline Occupational Safety), 1997
[5] PerMen ESDM No. 17/2018, Peraturan Menteri Energi dan Sumber Daya Mineral Republik
Indonesia Tentang Impor Barang Operasi untuk Kefiatan Usaha Hulu Minyak dan Gas Bumi
(Rule of the Minister of Mines and Energy Regarding Import of Material for Upstream Oil and Gas
Industries), 2018
4.3. PHM General Specifications
[6] MHK-COMP-SPE-EP-PLR-0100, Submarine Pipeline System
[7] MHK-COMP-SPE-EP-PLR-0215, Line Pipe (HFW Carbon Steel)
[8] MHK-COMP-SPE-EP-PLR-0205, Carbon steel, clad and lined pipe manufacturing for linepipe
applications according to API SPEC 5L and DNV-OS-F101 (sweet and sour service, onshore and
offshore)
4.4. Project Documents
[9] ID-SPU-ALL-0108-552001, Wall Thickness Calculation
[10] ID-SPU-ALL-0108-552002, Project Particular Specification Linepipe Specification (HFW)
[11] ID-SPU-ALL-0108-552004, Pipeline Basis of Design

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 9 of 11

5. LINEPIPE DATASHEET FOR 6.625” OD PIPELINE SYSTEM

Table 5-1: Linepipe Datasheet for 6.625” OD Pipeline System of TUNU Development Project

Project : TUNU Development Project


Client : Pertamina Hulu Mahakam
Location : TUNU Development Cluster Area (6.625” OD Pipeline System)
1 GENERAL DESIGN DATA
COMPANY Specification MHK-COMP-SPE-EP-PLR-0215
Project Particular Specification ID-SPU-ALL-0108-552002
Design Standard API SPEC 5L, 45th Edition, 2015
ASME B31.8, 2016
Environment Offshore
Burial Status Buried
Design Pressure 20.0 MPa
Design Maximum 95 oC
Temperature Minimum 0 oC
Design Life 10 years
Service Sweet Service - (Gas and Condensate Hydrocarbon)
2 DIMENSION
Outside Nominal Wall Corrosion
Approximate
Section Diameter Thickness Allowance
Length (m) (2)
(mm) (mm) (mm)
Refer to MTO
Sealine (1) 168.3 9.53 (3) 2 (4)
document
Joint Length (Average) 12.2 m, -0.4m / +0.3m (Shorter pipes < 11.6m is not permitted)
End Preparation both ends bevelled to an angle of 30o +50o, -0o with a root face
1.6mm ± 0.8mm
Dimensional Tolerance In accordance with ID-SPU-ALL-0108-552002 (Ref [10].)
Pipe Diameter (body) ± 0.0075 D
Pipe Diameter (ends) - 0.4 to + 1.6 mm
Wall Thickness - 5% / + 10%
Straightness (over total length) Max 0.15%
Straightness (last meter) Max. 3 mm
3 MATERIALS
Steel Grade Carbon Steel, API Spec. 5L Grade X65 MO PSL 2
Chemical Composition In accordance with ID-SPU-ALL-0108-552002.
Process of Manufacture HFW
SMYS 450 MPa
SMTS 535 MPa
Young’s Modulus 198000 MPa
Density 7850 kg/m3
Poisson’s Ratio 0.3

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 10 of 11

Project : TUNU Development Project


Client : Pertamina Hulu Mahakam
Location : TUNU Development Cluster Area (6.625” OD Pipeline System)
4 TESTING
Destructive Testing
Tensile Testing Min. Yield 450 MPa
Min. Tensile 535 MPa
Charpy Impact Test (Full Size) Test Temperature: 0oC
Absorbed Impact Energy Requirement:
• Minimum average value: 54 Joules
• Minimum individual value: 45 Joules
Shear Area Requirement:
• Minimum average value: 85 %
• Minimum individual value: 75 %
Hardness Test (BM / WM /
Max 270 / 300 / 300 HV5
HAZ)
Residual Stress (Ring Split
Residual Stress shall not exceed 20% SMYS
Test)
Non Destructive Testing
Dimensional Inspection Yes, In accordance with API 5L 45th Edition, Section 9.11
Ultrasonic Testing Yes, In accordance with MHK-COMP-SPE-EP-PLR-0215, Annex
E and API 5L 45th Edition, Annex K
Residual Magnetism Yes, residual magnetism shall not exceed 20 Gauss.
Threshold for NDT Acceptance / For surface connected flaw:
Rejection As standard reflector, notch N5 (0.47 mm) with maximum length
50 mm shall be used. Any flaw amplitude greater than amplitude
of notch N5 (0.47 mm) shall be considered as defect.
For embedded flaw:
As standard reflector, FBH 1.6 mm shall be used. Any flaw
amplitude greater than amplitude of FBH 1.6 mm shall be
considered as defect.
Mill Hydrotest
Hydrotest Pressure Generating a hoop stress equal to 96% SMYS as per MHK-
COMP-SPE-EP-PLR-0215, Section 10.2.6 (51.9 MPa)
Hold Period Not less than 10 seconds
5 REPAIR (5)
Before Hydrotest Grinding wheel or flap wheel
After Hydrotest Only flap wheels (cosmetic grinding)
6 DOCUMENTATION
All Material In accordance with MHK-COMP-SPE-EP-PLR-0205, Section 15
Certification Type 3.2 according to EN 10204
7 MARKING
General In accordance with ID-SPU-ALL-0108-552002, Section 11

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1
Document Number
PROJECT PARTICULAR SPECIFICATION 6 IN
ID-SPU-ALL-0108-552013
PIPELINE DATASHEET (HFW)
Revision: 0.1 Status : AFD
Document type : DTS System/Subsystem :N/NN Discipline : PLR Rev Date : 6-Feb-2019
Originator document number : NA Page : 11 of 11

Project : TUNU Development Project


Client : Pertamina Hulu Mahakam
Location : TUNU Development Cluster Area (6.625” OD Pipeline System)

Hard Stamp Pipe number shall be hard stamped on bevelled face at one pipe
end.
Paint Stencilling Longitudinal paint stencilling shall be used for marking. The
location of paint stencil is on the outside surface starting at a
point between 450mm and 760mm from the end of the pipe
8 HANDLING, TRANSPORT & STORAGE
Handling, Transport & Storage In accordance with MHK-COMP-SPE-EP-PLR-0215, Section 14.
Linepipes shall be packed for marine transportation and six
months preservation minimum
Bevel Protector Polyethylene bevel protector shall be used to protect the bevel
end as per Attachment 3 of Ref. [10].
Notes: (1) Section break sealine: Offshore pipeline from KP 0.00 – End of sealine
(2) Refer to Material Requisition and MTOs for Linepipe and Mother Pipe for detailed quantity including spares and contingency
(3) The minimum required wall thickness refers to Wall Thickness Calculation, Document No. ID-SPU-ALL-0108-552001
(4) The corrosion allowance for pipeline system is 2mm based on ECA result.
(5) Defects shall only be removed by grinding provided that the wall thickness is not reduced locally below the minimum
specified wall thickness.
After grinding the pipe shall be inspected by the process which detected the defect (UT or EMI), completed by wet MPI, to
ensure that the defect is completely removed and that the repair is acceptable. Wall thickness measurements shall be made
by UT in the ground areas. The results shall be recorded.

This document is the property of PHM and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: ID-SPU-ALL-0108-552013_Rev 0.1