Workpack Execution - Angsi BSDPA Riser Maintenance SOW
Workpack Execution - Angsi BSDPA Riser Maintenance SOW
Paint Chalking
Others:
Recommendation:
Painting: 1C system
Finding:
General Rusting
Recommendation:
2. Riser clamp
Power Tools ST 3.0
Painting: 4B system
Finding:
General Rusting
Spot Rusting
Painting: 4B system
Surface area estimation:
2.5m2
Finding:
General Rusting
Others:
Other view of
4.
riser clamp Recommendation:
Power Tools ST 3.0
Painting: 4B system
Finding:
General Rusting
Spot Rusting
Painting: 4B system
Finding:
General Rusting
Spot Rusting
Painting: 4B system
Finding:
General Rusting
Spot Rusting
Corrosion at Recommendation:
3. Boat Landing
Power Tools ST 3.0
support, clamp
and flange Painting: 4B system
Finding:
General Rusting
Spot Rusting
4. Corrosion at Recommendation:
conductors
Power Tools ST 3.0
Painting: 4B system
Finding:
General Rusting
Spot Rusting
Painting: 4B system