You are on page 1of 2

Technical Operation and Engineering Department

First Bay DAILY ACTIVITIES


POWER CORPORATION
Date: August 03, 2022
Technical Operations
I. Meter Readers (7:00am -5:00pm)
Work Description Location Remarks
Meter Reading Manalupang, Sinala 201 completed
Statement of Account
Sinala 202, Magalang-galang, San Pedro, Sampaguita completed
(SOA Deliveries)
 
II. Line Crew (8:00am - 5:00pm)
Crew A & C
(5 manpower and 2 Work Description Work Order No. Location Remarks
casual)
Work Order: Interconnection of
Substation 1 and Substation 2 (section 1 - Balayong-Manghinao
    on-going
from Balayong to Manghinao Bridge) for Proper
Feeder 2
1. Installation of overhead guying for two
       
(2) 55 ft. steel poles.
2. Cable pulling of new span 3 wire #4/0
       
PACSR primary lines.
Crew B
Work Description Work Order No. Location Remarks
(3 manpower)
Clearing branches if trees close and Bagong Silang and
    completed
overlap on primary and secondary line. Magalang-galang
Crew D (2 manpower) Dispatch Customers Name Location Remarks
    1. Temporary Connection Baylon, Abel M. San Andres Proper completed
    2. New Connection Robles, Mila Rose San Andres Proper completed
Ferdinand Joseph C. Blk 3 Lot 19 Boomtown,
    3. Permanent Connection Dimaapi Manghinao Proper
completed
    4. Transfer Meter Marcelino M. Gonzalvo Manalupang completed
Blk 21 Lot 1 Boomtown,
    5. Permanent Connection Sherly Mandigma
Manghinao Proper
completed
Blk 21 Lot 1 Boomtown,
    6. Disconnection Sherly Mandigma
Manghinao Proper
completed
Delos Reyes, Antonina -
    7. Others Alba, Jeffrey Delos Reyes
San Roque - Route 5 completed
    Trouble Customers Name Location Remarks
1. No power due to loose connection of
    service drop wire / Respliced and retapped Leonila Montalbo San Andres 1 completed
of service drop wire.
    Routinary Activity:        
Inspection of substation and recording of Substation (Taño Rd,
       
operational data . Manghinao Proper)
             
Regular OT - 3 manpower
Routinary Activity:        
(5pm - 10pm)
Inspection of substation and recording of Substation (Taño Rd,
       
operational data . Manghinao Proper)
Crew D (2 manpower)
Routinary Activity:        
10:00pm - 8:00am
Inspection of substation and recording of Substation (Taño Rd,
       
operational data . Manghinao Proper)

TOTAL NO. OF REPLACED KWH METER:


Today To Date
0 17,725
TOTAL CUSTOMER TO DATE:
New Connection
A. Residential   B. Commercial  
Total
Today To Date Today To Date
2 8,885 0 1,289 9,872
Total Consumer 23,907 Total Consumer 2,263 25,872