Actions and Data Required

om
Before the Kill
l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

SIDPP SICP
Shut in data

• SIDPP - Shut In Drillpipe Pressure


• SICP - Shut In Casing Pressure
• PIT GAIN

om
• SIDPP - Tells you how much the formation pressure is
greater than mud hydrostatic in drillpipe.
(Underbalance in String)

l.c
• SICP - Tells you how much the formation pressure is
oi
greater than hydrostatic in the annulus.
(Underbalance in Annulus)

• PIT GAIN - size of influx at shut in

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Pressure stabilisation
TIME SIDPP SICP
1. 100 400
2. 200 600

om
3. 300 800
4. 350 850
5. 400 900

l.c 6.
7.
450
500
950
1000
oi
8. 500 1000
9. 500 1000
10. 500 1000

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Pressure stabilisation

SIDPP

1000

om
800

pressure
600
400

l.c 200
Stabilisation
oi
0
0 2 4 6 8 10 12 14 16 18 20
minutes

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

What Effects Shut in Pressures

om
l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

What Effects Shut in Pressures

om
l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Pressure stabilisation
How long for shut in pressure
to stabilise? FAST
900 700

om
Pressure
PSI PSI

HIGH LOW
l.c Time

SLOW
oi
PERMEABILITY PERMEABILITY

Pressure

Time

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Shut in Horizontal well

om
l.c
oi
Influx
Height {

Little or No loss in Hydrostatic

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Gas Circulated into


Vertical Section

om
Influx
Height {
l.c
oi
Influx
Height {

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Shut In Pressures - Gas in


Horizontal Section

Casing

Drillpipe

om
l.c
oi
Influx
Height {

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Shut In Pressures- Gas


in Vertical Section

Casing

om
Drillpipe

Influx
Height
l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Gas migration
• Gas is lighter than the mud and
will try to migrate up the hole.
• The speed of migration will

om
depend on;
– mud properties- weight and viscosity
– hole angle

l.c• The gas cannot expand so will


carry Formation Pressure upwards
oi
causing ;
SICP to increase
BHP to increase
SIDPP to increase (if no Float)

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

How Can You See Gas migration


Shut In Pressure

1000

800

om
pressure
600

400

l.c 200

0
oi
Time

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

How Can You See Gas migration


Shut In Pressure

1000

800

om
pressure
600 Stabilisation

400

l.c 200

0
oi
Time

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

How Can You See Gas migration


Shut In Pressure

1000

800

om
pressure
600

400

l.c 200

0
oi
Time

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

How Can You See Gas migration


Shut In Pressure

1000

800

om
pressure
600

400

l.c 200

0
oi
Time

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

How Can You See Gas migration


Shut In Pressure

1000

800

om
pressure
600

400

l.c 200

0
oi
Time

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Gas migration - how to deal with it


500 600 500

om
l.c
oi

Well shut in - stabilised Gas migrates - SIDPP increases Bleed mud through choke, allowing
gas to expand, keeping SIDPP at
original value
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Float in drill string

Zero SIDPP How to find SIDPP


0
- Pump slowly down drillpipe and watch
600
build up

om
- Correct SIDPP is as soon as SICP starts
to increase

l.cSIDPP

600
SICP
oi
500

Time Time

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
Circulating system
(Slow Circulation Rate)

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Circulating system

• Circulating out a kick With Slow Rate.


• Why?

om
– minimize annular pressure loss
– reaction time when manipulating choke
– mud mixing


l.c
limitations of surface lines & MGS
mud pump maximum pressure limit
oi
• What pump rate do we use?
Normally 2 - 5 barrels per minute

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Circulating system
• How?
– Bit just off bottom

om
– use drill pipe gauge on choke panel
– rotate?
• When?
l.c
– At beginning of every shift
– mud property changes
oi
– every 500 feet
– bit, BHA etc. changes

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Circulating system

What factors determine the SPM chosen to kill the well

om
•Maximum pressure the pump can handle

•Ability to mix kill mud


l.c
•Size of choke and choke line
oi
•Viscosity of the mud

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Circulating system
• What will the APL be at 30 spm?
APL100SPM = 200 psi

om
2
 30 
APL30SPM = 200  
 100 
APL30SPM l.c
= 18 psi
oi
\ WE CAN NORMALLY IGNORE APL
AT THE SLOW CIRCULATING RATE

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
Fractures and MAASP

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Formation tests

• Leak Off Tests


PSI PSI

om
l.c
oi
Formation Integrity
Tests

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Leak off tests

PSI Purpose
• To measure the fracture
pressure of the formation at

om
the shoe
• To test the cement job
l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
ACCURATE FORMATION
STRENGTH (LEAK OFF TEST)
1-DRILL OUT THE CASING SHOE AND APPROXIMATELY
15 FEET IN NEW FORMATION (RAT HOLE).

2-TEST SURFACE LINES.

om
3-CIRCULATE TO GET UNIFORM MUD IN THE HOLE
MUT IN = MUD OUT.

l.c
4-EXACT VERTICAL DEPTH (TVD) OF CASING SHOE.
oi
5-USE CEMENT PUMP.

6-ACCURATE PRESSURE GAUGE.

7-RECORD MUD VOLUME PUMPED TILL LEAK-OFF


STARTS.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)

om
l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)

om
Pump Pressure

FRACTURE PRESSURE
= MUD psi + L.O.T. psi

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)

om
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
TREND LINE

om
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
TREND LINE

om
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
TREND LINE

om
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
TREND LINE

om
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
TREND LINE

om
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
Point of Leak Off TREND LINE

om
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
Point of Leak Off TREND LINE
Leak Off

om
Pressure
Pump Pressure

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

HOW IS FORMATION STRENGTH


MEASURED?
1/ LEAK OFF TEST (L.O.T)
Point of Leak Off TREND LINE
Leak Off

om
Pressure
Pump Pressure

FRACTURE PRESSURE
= MUD psi + L.O.T. psi

l.c
oi
Volume Pumped

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Fracture pressure

PFRAC = (MWHOLE x TVDSHOE x0.052) + PLOT

om
l.c
Maximum mud weight
oi
MWMAX = (PLOT  TVDSHOE  0.052) + MWHOLE

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

MAASP
• Maximum Allowable Annular Surface Pressure

om
• Definition
– the surface pressure, above mud hydrostatic which will

l.c
cause the formation at the shoe to take mud (losses)
• MAASP versus LOT
oi
– just after the LOT, the LOT pressure is the MAASP
• As the mud weight increases, the MAASP will
decrease

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

MAASP
Calculation

om
MAASP = (MWMAX - MWHOLE) x TVDSHOE x 0.052

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
PRINCIPLES OF
KILL METHODS
l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

PRINCIPLE OF KILL METHOD


RESTORE PRIMARY CONTROL
HOW?
CLEAN OUT INFLUX

om
REPLACE OLD MUD WITH KILL MUD
ALL THE TIME

l.c
MAINTAIN CORRECT BOTTOM HOLE PRESSURE.
oi
HOW?
USE INDUSTRY APPROVED KILL METHOD

ONE THAT MAINTAINS CORRECT AND CONSTANT BOTTOM


HOLE PRESSURE
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

BOTTOM HOLE PRESSURE

• PRESSURE EXERTED ON THE BOTTOM OF THE HOLE.

om
BHP = MUD HYDROSTATIC
+
BACK PRESSURE HELD AT REMOTE CHOKE
+
l.c
ANNULAR PRESSURE LOSS (APL)
oi
• MOST TIMES APL IS SMALL AND CAN BE IGNORED.

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

ROLE OF CHOKE

•THE CHOKE (REMOTE OR MANUAL) IS A DEVICE FOR


ADJUSTING BACK PRESSURE.

•A KICK IS DUE TO LACK OF MUD HYDROSTATIC.

om
•THE CHOKE PROVIDES A BACK PRESSURE TO COMPENSATE

l.c
FOR LACK OF MUD HYDROSTATIC.
oi
•WHEN HEAVY MUD IS PUMPED THE OPERATOR REDUCES
BACK PRESSURE.

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

START UP PROCEDURE

• THIS PROCEDURE STARTS THE KILL CORRECTLY.

• IT ENSURES THAT BHP IS CORRECT FOR THE KILL.

om
• IF CARRIED OUT CORRECTLY IT WILL GIVE YOU THE TRUE
CIRCULATING PRESSURE.

HOW? l.c
oi
BRING PUMP UP TO SPEED HOLDING CASING PRESSURE
CONSTANT.

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
KILLING METHODS

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Wait and weight method


• One circulation

om
• Kill mud pumped at the same time as the influx is
removed

l.c
oi

https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

500
900
method
0 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c
oi
300 psi

TVD 10000’

https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

800
900
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c
oi
300 psi

TVD 10000’

https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

700
950
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c • Allow drill pipe pressure to fall.
ICP = 800
to
oi
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit

TVD 10000’
https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

500
1000
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c • Allow drill pipe pressure to fall.
ICP = 800
to
oi
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit

TVD 10000’
https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

400
1100
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c • Allow drill pipe pressure to fall.
ICP = 800
to
oi
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit

TVD 10000’
https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

330
1100
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c • Allow drill pipe pressure to fall.
ICP = 800
to
oi
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit

TVD 10000’

https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

330
1300
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c • Allow drill pipe pressure to fall.
ICP = 800
to
oi
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit

TVD 10000’
https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

330
1500
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c • Allow drill pipe pressure to fall.
ICP = 800
to
oi
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit

TVD 10000’
https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

330
1000
method
30 SPM Single circulation
• Bring pump to kill rate,
HOLDING CASING PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
Mud wt KMW • Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
10 ppg 11 ppg = 300 + 500
= 800 psi

SCR
30 spm
l.c • Allow drill pipe pressure to fall.
ICP = 800
to
oi
300 psi FCP = 300 x 11 = 330 psi
10
as kill mud is pumped to the bit
• Hold FCP until kill mud reaches surface

TVD 10000’
https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

330
0
method
30 SPM Single circulation
• Bring pump to kill rate, HOLDING CASING
PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
• Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
= 300 + 500 = 800 psi
• Allow drill pipe pressure to fall.

l.c ICP = 800


to
FCP = 300 x 11 = 330 psi
oi
10
as kill mud is pumped to the bit
• Hold FCP until kill mud reaches surface
• When kill mud at the surface SICP will be
ZERO.

https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

0
0
method
0 SPM Single circulation
• Bring pump to kill rate, HOLDING CASING
PRESSURE CONSTANT
• Once at kill rate,switch to drill pipe
pressure

om
• Drill pipe pressure should be
I.C.P. = SCRP + SIDPP
= 300 + 500 = 800 psi
• Allow drill pipe pressure to fall.

l.c from ICP = 800 to


FCP = 300 x 11 = 330 psi
10
oi
as kill mud is pumped to the bit
• Hold FCP until kill mud reaches surface
• When kill mud at the surface SICP will be
ZERO.
• When pump shut off Both pressures will
be ZERO

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Wait and weight method


• Single circulation

om
• Circulate mud as soon as available, following step down.
Drillpipe Pressure Casing Pressure
1500

1000
l.c
oi
500

0
0 1 2 3 4 5 6 7 8 9 10 11

Stks x 100
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
Drillers method

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Drillers method
2 circulations

om
• First circulation to remove influx

l.c
• Second circulation to circulate kill mud
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

500
Drillers method
900
0 SPM

Well is Shut In

om
Mud wt
10 ppg

l.c
SCR
oi
30 spm
300 psi

TVD 10,000’

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

500
Drillers method
900
30 SPM
First circulation
• Bring pump to kill rate, opening choke HOLDING
CASING PRESSURE CONSTANT
• Once at kill rate, look at drill pipe pressure

om
Mud wt
10 ppg

l.c
SCR
oi
30 spm
300 psi

TVD 10000’

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

800
Drillers method
900
30 SPM
First circulation
• Bring pump to kill rate, opening choke HOLDING
CASING PRESSURE CONSTANT
• Once at kill rate, look at drill pipe pressure
• Drill pipe pressure should be the sum of the SCR

om
and SIDPP.
Mud wt E.g. =ICP
10 ppg = 300 + 500
= 800 psi

l.c
SCR
oi
30 spm
300 psi

TVD 10000’

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

800
Drillers method
1000
30 SPM
First circulation
• Bring pump to kill rate, opening choke HOLDING
CASING PRESSURE CONSTANT
• Once at kill rate, look at drill pipe pressure
• Drill pipe pressure should be the sum of the SCR

om
and SIDPP.
Mud wt E.g.
10 ppg = 300 + 500
= 800 psi
• Hold this pressure constant until the influx is

l.c
SCR
removed.
• Casing pressure will continue to INCREASE
because of gas expansion.
oi
30 spm
300 psi

TVD 10000’

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

800
Drillers method
1500
30 SPM
First circulation
• Bring pump to kill rate, opening choke HOLDING
CASING PRESSURE CONSTANT
• Once at kill rate, look at drill pipe pressure
• Drill pipe pressure should be the sum of the SCR

om
and SIDPP.
Mud wt E.g.
10 ppg = 300 + 500
= 800 psi
• Hold this pressure constant until the influx is

l.c
SCR
removed
• Casing pressure will continue to INCREASE and
INCREASE because of gas expansion.
oi
30 spm
300 psi
TVD 10000’

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

800
Drillers method
500
30 SPM
First circulation
• Bring pump to kill rate, opening choke HOLDING
CASING PRESSURE CONSTANT
• Once at kill rate, look at drill pipe pressure
• Drill pipe pressure should be the sum of the SCR

om
and SIDPP.
E.g.
= 300 + 500
= 800 psi
• Hold this pressure constant until the influx is

l.c removed
• Casing pressure will decrease as gas is pumped
through the choke, and finally will be equal to
oi
SIDPP when all gas is pumped out of the well.
• Shut down HOLDING CASING PRESSURE
CONSTANT

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

500
Drillers method
500
0 SPM
End of first circulation
• Bring pump to kill rate, opening choke HOLDING
CASING PRESSURE CONSTANT
• Once at kill rate, look at drill pipe pressure
• Drill pipe pressure should be the sum of the SCR

om
and SIDPP.
E.g.
= 300 + 500
= 800 psi
• Hold this pressure constant until the influx is

l.c removed
• Shut down HOLDING CASING PRESSURE
CONSTANT
oi
• SICP should equal original SIDPP

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

THINGS TO WATCH FOR


• FOLLOWING A CHOKE ADJUSTMENT THE DRILLPIPE
GAUGE TAKES LONGER TO REACT DUE TO LENGTH
OF SYSTEM

om
• KILL MUD ONLY DOES GOOD WHEN GOING
DOWNHOLE. THEREFORE RE-ZERO STROKE
COUNTER
l.c
• CALCULATED ICP IS ONLY A GUIDELINE. ACTUAL
oi
(TRUE) ICP IS SEEN AT START UP

• IF ACTUAL ICP IS DIFFERENT THEN RECALCULATE


GRAPH OR STEP DOWN

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Gas behaviour
• Gas expands as it is circulated up the hole

om
• Gas expansion reduces hydrostatic
• Casing (back) pressure increases to compensate for reduction in
hydrostatic

l.c
If kill is carried out correctly;
oi
Pressure at any point above gas influx will be increasing

GAS As gas passes then pressure drops

Pressure at any point below gas influx will be constant

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
Differences between methods

l.c
oi

https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

method
30 SPM

• Kill mud pumped from start


• If kill mud enters the annulus
before the gas reaches the
shoe:-

om
– will result in lower casing shoe
pressure than Drillers Method

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Drillers method
30 SPM

• Kill mud not pumped until influx


removed
• Casing shoe pressure will be
higher than Wait and Weight

om
l.c
oi

https://oil-com.blogspot.com/
Wait and weight
https://oil-com.blogspot.com/

method
30 SPM

• Kill mud pumped from start


• If the gas reaches the shoe
before the kill mud enters the
annulus:-

om
– Will result in the same shoe
pressure as the Drillers Method

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
l.c
oi
Drillers Wait and Weight

If the drill string volume is less than the open hole


volume, the Wait and Weight method will result in
lower casing shoe pressures
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
l.c
oi
Drillers Wait and Weight

In all cases the wait and weight method will result


in lower surface pressures
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

INFLUX SIZE v’s SHOE PRESSURE

SICP
SICP
600

om
300
psi
10 ppg 10 ppg
psi

2900 3200

psi
l.c
5000 ft

psi
5000 ft
oi
SHOE SHOE
PRESSURE PRESSURE

INFLUX

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Casing shoe pressure


• Shoe is assumed to be the weak point
• Pressure on shoe at shut in
= Mud hydrostatic + SICP

om
• Bigger the influx
the bigger the SICP
the bigger the shoe pressure
l.c
• If SICP exceeds MAASP at shut in then formation will break
down.
oi
KEEP KICKS SMALL
SHUT IN EARLY

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Problems during well control

om
operations

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

Well control problem Drillpipe Casing BHP

om
Choke plugging

Choke washout

Nozzle plugging
l.c
oi
String washout

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

CHANGING PUMP SPEED


KILLING A WELL

40 SPM
900 psi DRILL PIPE PRESSURE

om
IF SPM WAS INCREASED TO 50 AND DRILL PIPE
PRESSURE HELD AT 900 psi

l.c
? WHAT HAPPENS TO BHP?
oi

INC DEC STAY SAME

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

om
Volumetric and stripping operations

l.c
oi

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

STRIPPING
Non Return
Valve
psi

Volume to Bleed
= Closed end Displacement

om
psi

l.c
Casing Pressure rises as
you strip into bubble
oi
By how much approx???

https://oil-com.blogspot.com/
https://oil-com.blogspot.com/

VOLUMETRIC
• - WHEN OFF BOTTOM
- WHEN OUT OF HOLE
- WHEN BIT PLUGGED

om
• STEPS
CHOOSE SAFETY FACTOR
CHOOSE WORKING PRESSURE
e.g. - 100 psi
l.c
CALCULATE WORKING VOLUME in bbls
oi
ANNULAR VOLUME is at SURFACE PIPE

https://oil-com.blogspot.com/