Professional Documents
Culture Documents
com/
om
WELL CONTROL COURSE
l.c
25-29 Sep. 2005
oi
For Precision Drilling and Agiba
Supervisors
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
SECTION A
KEY DEFINITIONS
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Drilling Ahead
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
WHAT IS A KICK?
IT IS AN INFLUX OF FORMATION FLUID
THAT CAUSES THE WELL TO FLOW.
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
WHAT IS A BLOWOUT?
AN UNCONTROLLED EXIT OF THE FORMATION FLUIDS
AT THE SURFACE
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
MUD HYDROSTATIC -1
VERTECAL WELL
om
MUD HYDROSTATIC HP = 0.052 X MUD WEIGHT X DEPTH
l.c
oi
MUD GRADIANT = 0.052 X MUD WEIGHT PSI\FT.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
Pressure Gradient (psi/ft) =Pressure, psi TVD, ft
Mud Weight, ppg = Pressure Gradient .052
l.c
Mud Weight (ppg) = Pressure TVD .052
TVD (ft) = Pressure (psi) Mud Weight (ppg) 0.052
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FORMATION FLUID
om
l.c
oi
Fluid present in the pore space of the rock.
FORMATION PRESSURE
The pressure of the formation fluids.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
PSI
l.c
oi
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
OR
l.c
2/ SHUTTING IN THE WELL AFTER A
KICK HAS BEEN TAKEN
oi
= SECONDARY BLOW OUT PREVENTERS
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Primary control
MUD HYDROSTATIC
IN WELLBORE
FORMATION FLUID
PRESSURE
om
MUD 4800
HYDROSTATIC
5000
PSI
l.c PSI
oi
MUD HYDROSTATIC PREVENTS FORMATION FLUIDS
ENTERING THE WELLBORE
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Secondary Control
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Blowout Preventers
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FORMATION
PRESSURE
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FORMATION
PRESSURE
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FORMATION
PRESSURE
om
OR
l.c
oi
MUD
HYDROSTATIC
FORMATION
PRESSURE
om
OR
l.c
oi
MUD
HYDROSTATIC
HP
om
Always Remember that HP and
FP are two opposite forces.
l.c FP
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
CAUSES OF KICKS
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
Rig Floor
Mud Level 300 ft {
l.c Height (Length)
oi
True Vertical
Mud Wt = 11 ppg
Level Drop = 300 ft
What is loss of hydrostatic pressure?
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
CAUSES OF KICKS
l.c
(REDUCTION IN MUD WEIGHT)
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
• DRILLED GAS
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
8 16
om
2
l.c
oi
1
0 0 0 0 0 0
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
swabbing
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
What is swabbing?
Swabbing is a temporary
om
drop in BHP as the
string is pulled upwards.
l.c
oi
PSI https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Swabbing
Main causes;
– Pull pipe too fast
om
– Balled bit/BHA
– Viscous mud
– Narrow annulus
l.c
All these make it more difficult for mud
oi
to move past the bit to fill space created
by pulling drill string.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
– incorrect hole fill
l.c
• Monitoring the trip tank is of vital
importance
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
– Flow check
– If negative, run back to bottom
l.c
– Circulate bottoms up (consider taking
returns via the choke)
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Swab Pressure
Bottom Hole Pressure
om
Mud Hydrostatic
l.c -
Swab Pressure
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Surging
om
another
l.c
oi
Temporary increase of fluid
hydrostatic while tripping 4800 5000
in as mud tries to move up
around the bit
https://oil-com.blogspot.com/ PSI
https://oil-com.blogspot.com/
Surge Pressure
om
= Mud Hydrostatic
+
l.c Surge Pressure
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
LINE
BACKFLOW TO
TRIP TANK
= VOLUME OF
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
0
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
0 0
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
l.c
oi
0 0 0
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
CAUSES OF KICKS
l.c
(REDUCTION IN MUD LEVEL)
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
Rig Floor
Mud Level 300 ft {
l.c Height (Length)
oi
True Vertical
Mud Wt = 11 ppg
Level Drop = 300 ft
What is loss of hydrostatic pressure?
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
LOSSES
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
LOSSES
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
LOSSES
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
LOSSES
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
STAND
RIG FLOOR
om
FLOWLINE
l.c
oi
TOOL JOINT
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
RIG FLOOR
om
FLOWLINE
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
RIG FLOOR
om
l.c FLOWLINE
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
PULLING COLLARS
RIG FLOOR
om
FLOWLINE
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
PULLING COLLARS
RIG FLOOR
om
FLOWLINE
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
PULLING COLLARS
RIG FLOOR
om
FLOWLINE
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
RIG FLOOR
om
FLOWLINE
MUD LEVEL
l.c
oi
FLOAT COLLAR
CASING SHOE
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
RIG FLOOR
om
FLOWLINE
MUD LEVEL
l.c
oi
FLOAT FAILS
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
RIG FLOOR
om
FLOWLINE
l.c
oi
MUD LEVEL
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
CAUSES OF KICKS
l.c
(ABNORMAL PRESSURE)
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Porosity
SOLID PARTICLES
om
PORE
SPACE
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
What is Permeability?
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Permeability
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FORMATION PERMEABILITY
Ability of rock to allow fluid to move between pore spaces
om
HIGH LOW
l.c
PERMEABILITY PERMEABILITY
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
CAUSES OF KICKS.
REVISION:
om
“ UNDERBALANCE ”
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
CAUSES OF KICKS.
REVISION:
om
“ UNDERBALANCE ”
l.c
UNDERBALANCE IS CAUSED BY :
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
CAUSES OF KICKS.
REVISION:
om
“ UNDERBALANCE ”
l.c
UNDERBALANCE IS CAUSED BY :
oi
1. MUD WEIGHT REDUCTION.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
CAUSES OF KICKS.
REVISION:
om
“ UNDERBALANCE ”
l.c
UNDERBALANCE IS CAUSED BY :
oi
1. MUD WEIGHT REDUCTION.
2. DROP IN MUD LEVEL.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
CAUSES OF KICKS.
REVISION:
om
UNDERBALANCE IS CAUSED BY :
1. MUD WEIGHT REDUCTION.
l.c
2. DROP IN MUD LEVEL.
oi
3. INCREASE IN FORMATION PRESSURE.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
• 99.99+% OF FORMATION FLUIDS ARE WATER
l.c
• FORMATION WATER EQUALS
8.9 PPG (AVERAGE) = .465 PSI/FT
oi
• IF FORMATION FLUIDS ARE SQUEEZED THEN
FLUID PRESSURE INCREASES.
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
1/ UNDER COMPACTION
2/ FAULTING
om
3/ SALT DOME
4/ ARTESIAN
l.c
5/ GAS CAP
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Compaction
= Dewatering
om
Soft
sediments
Increasing Depth
and Compaction l.c
oi
Compacted
Sedimentary Rock
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
om
Normal
Pressure Abnormal
Pressure
l.c gradient
oi
Abnormal
Pressure
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
Sand Lens
om
Normal
l.c Pressure
oi
Abnormal
Pressure
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FAULTING
om
0
l.c
oi
SAND A
0
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FAULTING
om
0
l.c
oi
SAND A
SAND A
0
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
FAULTING
om
0 SAND A
0
l.c
oi
SAND A
0
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
SALT DOMES
om
l.c
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
ARTESIAN EFFECTS
Rain
Underground
water level
om
Spring 1000’
0’
l.c 500’
oi
https://oil-com.blogspot.com/
https://oil-com.blogspot.com/
ARTESIAN EFFECTS
Rain
Underground
water level
om
Spring 1000’
0’
l.c 500’
oi
CALCULATE MUD WEIGHT TO BALANCE?
ARTESIAN EFFECTS
Rain
Underground
water level
om
Spring 1000’
0’
l.c 500’
oi
CALCULATE MUD WEIGHT TO BALANCE?
om
l.c 7000’
oi
8000’
.465 PSI/FT
NORMAL PRESSURE
https://oil-com.blogspot.com/