Professional Documents
Culture Documents
Bumat MD398 16
Bumat MD398 16
MATERIALS DIVISION
MEMORANDUM
SUPERSEDES:
EFFECTIVE DATE
This memorandum is effective starting with contracts advertised in 2016, in conjunction with
revisions to VDOT Road and Bridge Specification 232, and Approved List No. 14.
PURPOSE/NEED/SCOPE/REQUIREMENTS
VDOT re-evaluated its pipe selection procedures. As part of that process, pipe joint and
connection design was evaluated, and Approved List No. 14 now will include waterstops for
pipe-to-structure connections. The Manual of Instructions (MOI) Section 204.19(k) has been
revised to clarify that Waterstops in that section are for non-pipe applications.
PROCEDURES
NOTES
REFERENCES
COPY DISTRIBUTION: