Contractor Planning /
Maintenance Selection / Work Request Scheduling of JSA / Work
Scoping of job SWP Tool Box Talk SWA
WR process Competency raising stage job / WO Handover
Test processing
Maintenance Contractor Supervisor Work Request Scoping Planning and Scheduling JSA Approving Authority – Head Tool Box Talk Use of SWA
procedure (EMPAC JSA is not at done at Operator
WR process) No process for PMD No provision in EAM No SME (OPD) input Work Request not scoping stage by the JSA and controls are not TBT not specific Metal Trade Workers
alignment with Risk related Live system mentioned if the job reviewed person who scoped reviewed and verified to the job were not aware of
Assessment Standard trade testing. is on live or dead line No hazard the Job. SWA.
identification at JSA / WR approved Issuing Authority – Area Outside
Most JSA / RAMS are Not interviewed by No concern. RAMS without any Hazard Operator Not used by Job
prepared only after PMD. No Situational identification Communication failure SWP - JSA controls were not Supervisor against
issuing WO. Awareness. Work between Bapco discussed. Job not explained Issuing Authority.
and Contractor
Receiving Authority – Contractor
Supervisor
SWP Process not followed