Rev 0
20 Mar 2019
Prepared by
Approved by
Rev & Date Anshul Jain
BPCL
(NACE Certified CP Level 3)
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
Contents
1. Introduction
2. International standards
3. Criteria for cathodic protection
4. Overview of the system
5. Status of CP system
6. Recommendation
Annexure – 1
Monitoring data of CP System – Old Mound
A. Transformer Rectifier Unit
B. Potential readings at REJB
C. Monitoring of Anode Groundbed
D. Monitoring of Cathode Junction Box
E. PSP at 12 o’clock position by portable Cu/CuSO4 reference cell
F. Isolation Joint testing
G. DC Decoupler testing
Annexure – 2
Monitoring data of CP System – New Mound
A. Transformer Rectifier Unit
B. Potential readings at REJB
C. Monitoring of Anode Groundbed
D. Monitoring of Cathode Junction Box
E. PSP at 12 o’clock position by portable Cu/CuSO4 reference cell
F. Isolation Joint testing
G. DC Decoupler testing
Annexure – 3
CP current requirement calculation
A. Old Mound
B. New Mound
Page 2 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
1. Introduction
BPCL has an operational LPG Bottling Plant at Solur, Bangalore. This plant has 2 mounds. Details of
each mound are mentioned below in the table:
ICCP system has been provided to protect these bullets against external corrosion. BPCL has
requested M/s KB Singh and Associates (KBSA) for health check-up of CP system.
Field visit has been made by Mr. Anshul Jain (KBSA) on 17 th-19th Mar 2019. During the visit CP system
for both old and new mounds has been inspected. This report provides monitoring data, status of
cathodic protection and recommendations for improving corrosion protection of mounded bullets.
2. International standards
Page 3 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
4. Overview of CP system
Page 4 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
5. Status of CP system
Sr. New
Parameter Old
No
A. O/P Voltage and O/P DC Volt: 12.0 V O/P DC Volt: 7.12 V
Current O/P DC Current: 2.3 A O/P DC Current: 1.5 A
On and Instant OFF PSP is same On and Instant OFF PSP is same
on protected and unprotected on protected and unprotected
side of all side of all
Monolithic Isolation Joints. Monolithic Isolation Joints.
6. Results
a. Polarized PSP at all permanent reference cell locations of new and old mounds is not
meeting NACE/OISD criterion of -0.850 VCSE Instant OFF.
b. Anode strings for Old mound are healthy.
2 Anode strings out of 8 in New Mound are not drawing CP current.
c. Protected structure of mounded bullets is electrically connected with foreign structures in
Old and New mounds both. Hence there is no electrical isolation.
7. Recommendations
1. Achieve electrical isolation. Most likely areas of electrical short between bullet and foreign
structures are instrumentation cable armor and piping metallic supports.
Detailed inspection shall be performed and all connection points shall be removed.
Page 5 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
ANNEXURE-1
Page 6 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
Observation:
Cu/CuSO4 7
-5.233 -0.855 -5.430 -0.930 -6.630 -0.936
Page 7 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
Cu/CuSO4 8
-6.930 -0.958 -6.540 -0.740 -6.750 -0.962
Cu/CuSO4 9
-6.324 -0.935 -6.560 -0.838 -6.800 -0.799
Zn RE 1 -3.528 +0.176 -3.783 +0.240 -4.026 +0.141
Observations: 9 permanent Cu/CuSO4 reference cells of 27 are not meeting NACE /OISD criterion.
One of the 9 Zn reference cells are not meeting protection criterion of -0.100 V to +0.250 V Instant
OFF.
Page 8 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
mV across
MSV No Current (A)
shunt
C1 0.29
2.2
C2 0.16
C1 0.61
4.5
C2 0.3
C1 0.56
4.0
C2 0.25
2.17
Total 10.7
Observation:
Analysis: Instant OFF PSP of the bullets are meeting NACE/ OISD criterion of -0.850 V CSE Instant OFF.
MSV No 2
LPG inlet/ Outlet -7.660 -1.038 -7.660 -1.038
Page 9 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
MSV No 3
LPG inlet/ Outlet -7.600 -1.018 -7.600 -0.951
Vapor suction -7.600 -1.018 -7.600 -0.951
Vapor return -7.600 -1.018 -7.600 -0.951
Note: All PSP are wrt portable Cu/CuSO4 half cell kept at 12 o’clock position.
G. DC Decoupler testing
Page 10 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
ANNEXURE-2
Page 11 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
Cu/CuSO4 7
-2.160 -0.957 -1.289 -0.314 -2.536 -0.932
Cu/CuSO4 8
-2.446 -0.890 -2.596 -0.940 -2.707 -0.790
Page 12 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
Cu/CuSO4 9
-2.568 -0.960 -1.296 -0.322 -2.874 -0.934
Zn RE 1 -1.301 +0.016 -1.474 +0.026 -1.873 -0.011
Observations: 6 permanent Cu/CuSO4 reference cells of 27 are not meeting NACE /OISD criterion.
All 9 Zn reference cells are meeting protection criterion of -0.100 V to +0.250 V Instant OFF.
Page 13 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
C1 0.6 0.08
Bullet 5
C2 0.3 0.04
C1 3.3 0.44
Bullet 6
C2 1.3 0.17
1.40
Total
Observation: Instant OFF PSP for the bullets are meeting NACE/ OISD criterion of -0.850 V CSE Instant
OFF.
MSV No 5
LPG inlet/ Outlet -2.826 -1.041 -2.781 -1.049
Vapor suction -2.826 -1.041 -2.781 -1.049
Vapor return -2.826 -1.041 -2.781 -1.049
Page 14 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
MSV No 6
LPG inlet/ Outlet -3.046 -1.001 -2.826 -0.976
Vapor suction -3.046 -1.001 -2.826 -0.976
Vapor return -3.046 -1.001 -2.826 -0.976
Note: All PSP are wrt portable Cu/CuSO4 half cell kept at 12 o’clock position.
G. DC Decoupler testing
Page 15 of 17
Site visit report on cathodic protection system
of mounded bullets at BPCL LPG Bottling plant,
Solur, Bangalore
KB Singh and LPG Bottling plant,
Associates, Noida Bangalore
Annexure – 3
Elastomeric
Polyurethane
Dia of Bullet 5 m
Length of Bullet (tl to tl) 32.5 m
Surface area of the Bullet 588.75 sqmtrt
No of Bullets 3
Total Surface Area 1766.25 sqmtrt
% of Bare steel at the end of design life 5%
Current density for Bare steel 10 milliamp/m2
Microamp /
CP Current density for coated steel 25 m2
Current required by bare steel 0.88313 Amp
Current required by coated steel 0.04195 Amp
Total current required 0.93 Amp
Safety Factor 1.3 Amp
CP current required with Safety factor 1.20 Amp
Note: In the design document of CP system for old mound, CP current density for bare steel has
been considered as 25 microamp/m2. This is very low current density and will not be able to polarize
bullet structures cathodically.
Page 17 of 17