This document provides a costing summary for the pad footing formwork, concrete, reinforcement, and earth excavation for a construction project with 9 pad footings (P1-P9). It includes the quantities, volumes, areas, weights, and costs for the raw materials and placement of each item by pad footing. The totals are provided at the bottom of each section.
This document provides a costing summary for the pad footing formwork, concrete, reinforcement, and earth excavation for a construction project with 9 pad footings (P1-P9). It includes the quantities, volumes, areas, weights, and costs for the raw materials and placement of each item by pad footing. The totals are provided at the bottom of each section.
This document provides a costing summary for the pad footing formwork, concrete, reinforcement, and earth excavation for a construction project with 9 pad footings (P1-P9). It includes the quantities, volumes, areas, weights, and costs for the raw materials and placement of each item by pad footing. The totals are provided at the bottom of each section.
Job Description : CAFE UPSI Designed by : LIANA ABDUL WAHAB Date & Time : Friday, August 19, 2022 11:47:35 AM (License Number: Timer-SN672-C0-1) _____________________________________________________________________