REFERENCE TO SPECIFICATION/ DOCUMENT/DRAWING:
ALL IFC DRAWING FOR HCIS CAT II, Ill & IV FENCES
Ill
0c
u MATTER / DESCRIPTION:
a::
...
.
...I
0 WITH REFERENCE DRAWING NO. CIV-DWG-015 GCS WOULD LIKE TO CONSIDER SIKA GROUT 114 AS FILL MATERIAL
ONLY FOR HCIS CATEGORY IIGROOVE ON BEAM WITH SOMM WIDTH AND SOMM DEPTH AS IT FALLS UNDER SAES-Q-
!0
! 001,7.21
tl CONCRETE REPAIR WHICH IT WILL SERVE AS TO FILL THE GROOVE AND TO LEVEL THE TOP SURFACE]
c
0
u
..D
::J
!!!. R ECOMME N DATIO N:
0a
GCS WILL USE SIKA 114 TO FILL THE GROOVE ON HCIS CATEGORY II BEAM AS PER SAES-Q-001 7.21.
z FIRST WILL CLEAN
Ci AND REMOVE ALL UNWANTED MATERIALS SUCH AS SAND, SOIL, PLASTIC, DUST AND SOAKEDWITH BURLAPS FOR
C2 HOURS PRIOR TO GROUTING. AFTER GROUTING (THE NEXT DAV) GCS WILL PERFORM THE 24 ED CURING
0
CJ REQUIR PROCEDURES NOT LESS THAN 7 DAYS.
I;;
::cI
>
CCI SKETCHES ARE ATTACHED ATTACHED SKETCHES CODE: OTHER ATTACHED DOCUMENTATION: IFC DRAWING
0
I __L,,i (YES or NO):
u:::
ILi
CCI
0
-- - -·> .
ORIGINATOR: NAME: YAKHOOB KHAN
.:::; .,
-
DATE: 22/December/2021 SIGNATURE: ---------------------------
:::l e i:;
:::>
"' z
8 CONSTRUCTION SUPERINTENDENT: NAME: SITE CONSTRUCTION MANAGER OR AUTHOURIZED PERSON: NAME:
_ fifi
y.
.§er
... z c Proposal is accepted. GCS is advised to proceed.
F-ITG-005-021-1 Rev 1
Ill i; ..
0 z .c
... ... 311
F-ITG-005-021-1 Rev 1
HARADH & HAWIYAH FIELD GAS
COMPRESSION PROJECT
TEC:N!CAS fUN!Dt S SITE TECHNICAL QUERY
SUBCONTRACTOR DISCIPLINE ENGINEERING PROJECT CONSTRUCTION SITE QUALITY SITE COST SUBCONTRACTS
LEADER MANAGER ENG./AREA SUPERVISOR CONSTRUCTION CONTROL ADMINISTRATOR
AND FIELD MANAGER MANAGER
ENGINEERING
MANAGER
YES NO
ISUGGEST THIS STQ RAISES A LESSON LEARNED (indicate YES or NO)
x
NOTE :NONE ENGINEERING RESPONSE Will EVER BE CARRIED OUT UNLESS THE SITE ENGINEERING MANAGER OR DELEGATED PERSON SIGNES IT
F-ITG-005-021-1 Rev 1