HARADH & HAWIYAH FIELD GAS

COMPRESSION PROJECT -!iiJ..·'.r:. -- · -j .- ..>


. .. - - -- - - ------ ···
-1' <C'>J.'MIU !IH.:UM• ""

TEZ:.NICAS REUNIOl\S SITE TECHNICAL QUERY

SITE TECHNICAL QUERY


SUB-CONTRACTOR NAME: Subcontrac Issuance Date CODE:
Gulf Cooperation Symbols Contracting Co. tor N!! December 25, GCS-CIV-STQ-10130-0036
10130-25160 2021

UNIT : I LOCATION : ORIGINATOR: DICIPLINE:


c FENCE ALL GCP, OSB, LSS YAKHOOB KHAN CIVIL

Subject:
. . .:
::J
REFERENCE TO SPECIFICATION/ DOCUMENT/DRAWING:
ALL IFC DRAWING FOR HCIS CAT II, Ill & IV FENCES
Ill
0c
u MATTER / DESCRIPTION:
a::
...
.
...I
0 WITH REFERENCE DRAWING NO. CIV-DWG-015 GCS WOULD LIKE TO CONSIDER SIKA GROUT 114 AS FILL MATERIAL
ONLY FOR HCIS CATEGORY IIGROOVE ON BEAM WITH SOMM WIDTH AND SOMM DEPTH AS IT FALLS UNDER SAES-Q-
!0
! 001,7.21
tl CONCRETE REPAIR WHICH IT WILL SERVE AS TO FILL THE GROOVE AND TO LEVEL THE TOP SURFACE]
c
0
u
..D
::J
!!!. R ECOMME N DATIO N:
0a
GCS WILL USE SIKA 114 TO FILL THE GROOVE ON HCIS CATEGORY II BEAM AS PER SAES-Q-001 7.21.
z FIRST WILL CLEAN
Ci AND REMOVE ALL UNWANTED MATERIALS SUCH AS SAND, SOIL, PLASTIC, DUST AND SOAKEDWITH BURLAPS FOR
C2 HOURS PRIOR TO GROUTING. AFTER GROUTING (THE NEXT DAV) GCS WILL PERFORM THE 24 ED CURING
0
CJ REQUIR PROCEDURES NOT LESS THAN 7 DAYS.
I;;
::cI
>
CCI SKETCHES ARE ATTACHED ATTACHED SKETCHES CODE: OTHER ATTACHED DOCUMENTATION: IFC DRAWING
0
I __L,,i (YES or NO):

u:::
ILi
CCI
0

-- - -·> .
ORIGINATOR: NAME: YAKHOOB KHAN
.:::; .,

POSITION: Project Manager ...,_ '' ,,r-

-
DATE: 22/December/2021 SIGNATURE: ---------------------------

> Z RESPONSE TO STQ BY CONSTRUCTION


"' Q

:::l e i:;
:::>

"' z
8 CONSTRUCTION SUPERINTENDENT: NAME: SITE CONSTRUCTION MANAGER OR AUTHOURIZED PERSON: NAME:

DATE: SIGNATURE: --------------------- DATE: SIG NATURE: -------------------------

c ENGINEERING RESPONSE {whenever requested by Construction)


>
Ill "' "'O
-

_ fifi
y.
.§er
... z c Proposal is accepted. GCS is advised to proceed.
F-ITG-005-021-1 Rev 1
Ill i; ..
0 z .c
... ... 311

F-ITG-005-021-1 Rev 1
HARADH & HAWIYAH FIELD GAS
COMPRESSION PROJECT
TEC:N!CAS fUN!Dt S SITE TECHNICAL QUERY

RECOMMENDATION ACCEPTED: RECOMMENDATION REJECTED:


(CHECK WITHAN X) ( CHECi( WITH AN X J
FIELD ENGINEERING MANAGER OR DELEGATED FIGURE:
ACCOUNTABLE DISCIPLINE:

NAME: Guin I. GumapacSIGNATURE: --+-+--->,,=l'-""-C". - NAME: Antonio Nieto

POSITION: Civil/Building Engineer / DATE: 06/JAN/2022 POSITION: Field Engineering Manager

INTERNAL DISTRIBUTION TO: (check the appropriate boxes) :

SUBCONTRACTOR DISCIPLINE ENGINEERING PROJECT CONSTRUCTION SITE QUALITY SITE COST SUBCONTRACTS
LEADER MANAGER ENG./AREA SUPERVISOR CONSTRUCTION CONTROL ADMINISTRATOR
AND FIELD MANAGER MANAGER
ENGINEERING
MANAGER

YES NO
ISUGGEST THIS STQ RAISES A LESSON LEARNED (indicate YES or NO)
x
NOTE :NONE ENGINEERING RESPONSE Will EVER BE CARRIED OUT UNLESS THE SITE ENGINEERING MANAGER OR DELEGATED PERSON SIGNES IT