Professional Documents
Culture Documents
B.V
ThePettCo
NEW CONSTRUCTION
component catalogue
Status: 04/01/2022
advance deduction
Changes:
advance deduction
1. Preliminary Remarks
As part of the construction project ThePettCo is on the property Pettenkofer Straße 16-19 in 10247 Berlin
the new construction and the extension of commercial buildings are planned. The planned new buildings are
divided into the buildings NA, NB, NC,ND, NE and the existing buildings BA, BD and B-WB. An overview of the
parts of the building can be seen in the following picture.
advance deduction
The new buildings are to be erected in a timber hybrid construction method. The existing buildings are masonry
structures. The facades of the existing BA building are plastered. The existing building BD, on the other hand, has
exposed masonry with glazed bricks. Building B-WB also has exposed brickwork on the ground floor of the street
facade, otherwise a plaster facade. Structural extensions are planned for some of the existing buildings.
With the exception of building B-WB, the buildings are used for commercial purposes (non-residential buildings).
Building B-WB is a residential building.
Within the framework of the available building physics component catalogue, the relevant external components are
presented for the new buildings and the necessary thermal insulation measures are specified and the heat transfer
coefficients are determined.
When determining the thermal insulation measures, it was taken into account that the client is aiming for the EG40/
KfW-40 standard for the new buildings. In this regard, it must be stated that federal funding for new buildings is
currently suspended and it is not known what requirements will be placed on a possible renewed funding. The
measures listed below are therefore based on the status of the funding conditions of December 2021.
2. Requirements EG 40
According to the statements in Section 1, the new buildings should comply with the EG40 efficiency house
standard. According to the latest version of the guideline for federal promotion of efficient non-residential buildings,
the annual primary energy requirement must be well below the legal requirements according to GEG. Furthermore,
the transmission-transmitting external components must meet the requirements for structural thermal insulation.
The requirements for the annual primary energy requirement must be verified as follows within the framework of
an energy balance according to GEG and DIN V 18599.
The following requirements must always be taken into account for structural thermal insulation.
advance deduction
3. Parts catalogue
In the following, for each relevant component of the thermal building envelope, the component structure, the
suitable thermal insulation material, the thickness of the thermal insulation, the design value of the thermal
conductivity of the thermal insulation as well as the heat transfer coefficient (U-value) and the thermal resistance (R-
value) of the construction are given. Furthermore, the individual component verification according to DIN 4108-2 is
carried out for compliance with the requirements for the hygienically required minimum thermal insulation.
The thermal transmittance coefficient is determined on the basis of the rated values for thermal conductivity (ÿ
values) of the relevant building materials/thermal insulation in accordance with DIN EN ISO 6946. Upper limits (e.g.
ÿ ÿ 0.035 W/(mK)) are used for the rated values for thermal conductivity of the insulating materials. specified, on
the basis of which the heat transfer coefficient was determined.
When choosing a product, it should be noted that individual manufacturers specify the nominal value of thermal
conductivity ÿD or the limit value of thermal conductivity ÿlimit , which must not be used to determine the heat
transfer coefficient. According to DIN V 4108ÿ4, these values must be converted into the rated value of the thermal
conductivity ÿ. Alternatively, the design value of the thermal conductivity ÿ according to a building inspectorate
approval can be used as a basis.
advance deduction
In the context of the tender, the design values for thermal conductivity must always be specified.
3.2.External Walls
The building is to be erected as a timber hybrid construction. Since there is currently no specific information on the
design of the outer walls/facades, options for designing the facades are shown below, which are to be specified in
the context of further planning.
advance deduction
Exterior wall construction in timber panel construction
The concrete design of the wall construction must be coordinated with the structural engineer. The wall structure represents a basic wall
structure.
To determine the heat transfer coefficient, the proportion of wood was estimated at 15%.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 plasterboard cladding 1.25
- - - -
02 substructure/installation 03 OSB panel, airtight 04 e.g. 4.00
wood fiber insulation 05 underlay panel 2.40 610 14.6 0.130 0.18
24.00 20 4.8 0.038 6.32
6.00 180 10.8 0.047 1.28
- - - -
06 substructure 4.00
- - - -
07 Façade cladding 4.00
rose 0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
frame area
s ÿ ÿ R
Frame part from the inside cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 GK clothing 1.25
- - - -
02 substructure/installation r 4.00
03 OSB board, airtight 2.40 610 14.6 0.130 0.18
04 wood 24.00 500 120.0 0.130 1.85
05 sub-deck panel 6.00 180 10.8 0.047 1.28
- - - -
06 substructure 4.00
- - - -
07 Façade cladding 4.00
rose 0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
advance deduction
.................................................. .................................................. .................................................. .......................
heat transfer coefficient
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013).
Increased requirements for light components with a total mass per unit area < 100 kg/m²
The concrete design of the wall construction must be coordinated with the structural engineer. The wall structure represents
a basic wall structure.
advance deduction
To determine the heat transfer coefficient, the proportion of wood was estimated at 15%.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 GK clothing 1.25
- - - -
02 substructure/installation r 4.00
03 OSB board, airtight 2.40 610 14.6 0.130 0.18
04 mineral wool MW 032 24.00 20 4.8 0.032 7.50
05 sub-deck panel 6.00 180 10.8 0.047 1.28
- - - -
06 substructure 4.00
- - - -
07 Façade cladding 4.00
rose 0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
frame area
s ÿ ÿ R
Frame part from the inside cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 GK clothing 1.25
- - - -
02 substructure/installation r 4.00
03 OSB board, airtight 2.40 610 14.6 0.130 0.18
04 wood 24.00 500 120.0 0.130 1.85
05 sub-deck panel 6.00 180 10.8 0.047 1.28
- - - -
06 substructure 4.00
- - - -
07 Façade cladding 4.00
rose 0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
advance deduction
.................................................. .................................................. .................................................. .......................
heat transfer coefficient
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013).
Increased requirements for light components with a total mass per unit area < 100 kg/m²
Component: Solid wood exterior wall with rear-ventilated facade cladding (AW02-01)
The concrete design of the wall construction must also be coordinated with the structural engineer. The wall structure represents
advance deduction
a basic wall structure.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 GK clothing 1.25
02 solid wood element 8.00 500 40.0 0.130 0.62
03 STEICOflex 036 26.00 60 15.6 0.038 6.84
- - -
04 Façade film, open to diffusion 0.06 0.2
- - - -
05 substructure/rear ventilation 4.00
- - - -
06 Façade cladding 4.00
rose 0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
compartment
= 0.13 W/(m²K)
frame area
s ÿ ÿ R
Frame part from the inside cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 GK clothing 1.25
02 solid wood element 8.00 500 40.0 0.130 0.62
03 substructure 26.00 500 130.0 0.130 2.00
- - -
04 Façade film, open to diffusion 0.06 0.2
- - - -
05 substructure/rear ventilation 4.00
- - - -
06 Façade cladding 4.00
rose 0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
advance deduction
heat transfer coefficient
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013).
Increased requirements for light components with a total mass per unit area < 100 kg/m²
Component: Solid wood exterior wall with rear-ventilated facade cladding (AW02-02)
The concrete design of the wall construction must also be coordinated with the structural engineer. The wall structure represents
a basic wall structure.
advance deduction
Thermal insulation: eg Steico special dry from Steico
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 GK cladding 02 solid 1.25
wood element 03 STEICOspecial 10.00 500 50.0 0.130 0.77
dry 04 facade foil, if necessary, 24.00 140 33.6 0.039 6.15
- - -
diffusionof 05 substructure/rear ventilation 06 facade 0.06 0.2
- - - -
cladding Rse 4.00
- - - -
4.00
0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
.020 fasteners
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013). Increased requirements
for light components with a total mass per unit area < 100 kg/m²
advance deduction
Component: Solid wood exterior wall with rear-ventilated facade cladding (AW02-03)
The concrete design of the wall construction must also be coordinated with the structural engineer. The wall structure represents
advance deduction
a basic wall structure.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 GK clothing 1.25
02 solid wood element 10.00 500 50.0 0.130 0.77
03 mineral wool MW 033 20.00 20 4.0 0.033 6.06
- - -
04 if necessary facade foil, diffusionof 05 substructure/rear 0.06 0.2
- - - -
ventilation 06 facade cladding Rse 4.00
- - - -
4.00
0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
.020 fasteners
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013). Increased requirements
for light components with a total mass per unit area < 100 kg/m²
advance deduction
Component: Reinforced concrete outer wall with rear-ventilated facade cladding (AW03-01)
advance deduction
"External wall" component type
with the heat transfer resistances Rsi = 0.13 and Rse = 0.13 m²K/W
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 interior plaster/filling, if necessary 02 1.00
reinforced concrete 03 mineral wool MW 30.00 2300 690.0 2.300 0.13
033 20.00 20 4.0 0.033 6.06
- - -
04 if necessary facade foil, diffusionof 05 substructure/ 0.06 0.2
- - - -
rear ventilation 06 facade cladding Rse 4.00
- - - -
4.00
0.13
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
.020 fasteners
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013).
Minimum requirements according to Tab.3.
advance deduction
advance deduction
In the area of the underground car park, it is assumed that the ETICS will be bonded. If the ETICS is anchored, the anchors must
be insulated.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 Interior plaster/filling, if necessary 02 1.00
Reinforced concrete 25.00 2300 575.0 2,300 0.11
03 glue 1800 - -
0.50 9.0
04 Mineral fiber insulation 16.00 20 3.2 0.035 4.57
- - - -
05 Exterior plaster 1.00
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013).
Minimum requirements according to Tab.3.
It is pointed out that, depending on the dimensional/perpendicular deviations and the other facade designs, greater insulation
advance deduction
thicknesses may be required, especially in the case of superstructures.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
- - - -
01 Interior plaster/filler, if necessary 02 Reinforced 1.00
concrete 03 Joint plate 04 Existing wall 05 25.00 2300 575.0 2.300 0.11
4.00 20 0.8 0.040 1.00
38.00 1800 684.0 0.810 0.47
- - - - -
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Walls of heated rooms against outside air, ground, underground garages (DIN 4108-2:2013).
Minimum requirements according to Tab.3.
advance deduction
The formation of zero-pitch roofs requires special measures and must be agreed with the client. The duration of the flooding is to
be limited in time.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 solid wood ceiling 15.00 500 75.0 0.130 1.15
- - - -
02 vapor barrier 0.50
03 EPS thermal insulation 20.00 20 4.0 0.032 6.25
- - - -
04 Sealing according to DIN18531 0.40
- - - -
05 Green roof structure according to plan 14.00
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Increased requirements for light components with a total
mass per unit area < 100 kg/m²
Suitable thermal insulation: PUR/PIR thermal insulation as a compact roof - zero slope roof
eg BauderPIR M/MF or Bauder PIR compact from Bauder or similar.
The formation of zero-pitch roofs requires special measures and must be agreed with the client. With a compact roof, the layers of
the roof structure are bonded with bitumen.
The duration of the flooding is to be limited in time.
advance deduction
"Roof ceiling" component type
with the heat transfer resistances Rsi = 0.10 and Rse = 0.04 m²K/W
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 solid wood ceiling 15.00 500 75.0 0.130 1.15
- - - -
02 vapor barrier 0.50
03 PUR/PIR rigid foam 16.00 30 4.8 0.026 6:15
- - - -
04 Sealing according to DIN18531 0.40
- - - -
05 Green roof structure according to plan 14.00
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Increased requirements for light components with a total
mass per unit area < 100 kg/m²
advance deduction
The formation of zero-pitch roofs requires special measures and must be agreed with the client. The duration of the flooding is to
be limited in time.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 solid wood ceiling 15.00 500 75.0 0.130 1.15
- - - -
02 vapor barrier 0.50
03 EPS thermal insulation 20.00 20 4.0 0.032 6.25
- - - -
04 Sealing according to DIN18531 0.40
- - - -
05 Green roof structure according to plan 29.00
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Increased requirements for light components with a total
mass per unit area < 100 kg/m²
Suitable thermal insulation: PUR/PIR thermal insulation as a compact roof - zero slope roof
eg BauderPIR M/MF or Bauder PIR compact from Bauder or similar.
The formation of zero-pitch roofs requires special measures and must be agreed with the client. With a compact roof, the layers of
the roof structure are bonded with bitumen.
advance deduction
The duration of the flooding is to be limited in time.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 solid wood ceiling 15.00 500 75.0 0.130 1.15
- - - -
02 vapor barrier 0.50
03 PUR/PIR rigid foam 16.00 30 4.8 0.026 6:15
- - - -
04 Sealing according to DIN18531 0.40
- - - -
05 Green roof structure according to plan 14.00
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Increased requirements for light components with a total
mass per unit area < 100 kg/m²
Suitable thermal insulation: PUR/PIR thermal insulation as a compact roof - zero slope roof
eg BauderPIR M/MF or Bauder PIR compact from Bauder or similar.
The formation of zero-pitch roofs requires special measures and must be agreed with the client. With a compact roof, the layers of
the roof structure are bonded with bitumen.
If the roof terraces are designed with a gradient, compliance with the requirements for the heat transfer coefficient must be
advance deduction
verified by the insulation manufacturer/executive company using the gradient plan.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 Solid wood ceiling 02 Vapor 15.00 500 75.0 0.130 1.15
- - - -
barrier 03 PUR/PIR hard foam 0.50
04 Sealing according to DIN18531 05 16.00 30 4.8 0.026 6:15
- - - -
Building protection mat or similar. 1.00
- - - -
1.00
- - - -
06 terrace covering Rse 15.00
0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Increased requirements for light components with a total
mass per unit area < 100 kg/m²
The formation of zero-pitch roofs requires special measures and must be agreed with the client.
advance deduction
If the roof terraces are designed with a gradient, compliance with the requirements for the heat transfer coefficient must be
verified by the insulation manufacturer/executive company using the gradient plan.
Rsi 0.10
01 Solid wood ceiling/reinforced concrete 15.00 500 75.0 2,300 0.07
- - - -
02 Emergency sealing 0.50
03 FOAMGLAS T4+ 22.00 115 25.3 0.042 5.24
- - - -
04 Sealing according to DIN18531 05 1.00
- - - -
Building protection mat or similar 1.00
- - - -
06 terrace covering Rse 15.00
0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Minimum requirements according to
Tab.3.
Load distribution plate and the covering as specified by the property planner/structural engineer
advance deduction
"Roof ceiling" component type
with the heat transfer resistances Rsi = 0.10 and Rse = 0.04 m²K/W
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 reinforced concrete 16.00 2300 368.0 2,300 0.07
- - - -
02 emergency sealing 0.50 03 FOAMGLAS S3 16.00 04 sealing 1.00 05
building protection mat or similar 1.00 06 pressure distribution plate, driving
load 130 20.8 0.046 3.48
- - - -
14.00
- - - -
- - - -
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Minimum requirements according to
Tab.3.
advance deduction
"Roof ceiling" component type
with the heat transfer resistances Rsi = 0.10 and Rse = 0.04 m²K/W
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 reinforced concrete 16.00 2300 368.0 2,300 0.07
- - - -
02 emergency sealing 03 0.50
FOAMGLAS T4+ 04 sealing 16.00 115 18.4 0.042 3.81
- - - -
05 building protection mat 1.00
- - - -
or similar 1.00
1550 - -
06 terrace covering Rse 14.00 217.0
0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Minimum requirements according to
Tab.3.
Load distribution plate and the covering as specified by the property planner/structural engineer
advance deduction
"Roof ceiling" component type
with the heat transfer resistances Rsi = 0.10 and Rse = 0.04 m²K/W
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.10
01 reinforced concrete 16.00 2300 368.0 2,300 0.07
- - - -
02 Emergency sealing 0.50
03 FOAMGLASS S3 8.00 130 10.4 0.046 1.74
- - - -
04 Sealing 1.00 05 Building protection mat or similar 1.00 06 pressure
- - - -
distribution plate, driving load 14.00
- - - -
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings of heated rooms upwards against outside air (DIN 4108-2:2013). Minimum requirements according to
Tab.3.
advance deduction
eg passages
s ÿ ÿ R
from inside cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.17
- - - -
01 flooring 1.00
- - - -
02 raised floor 5.00
- - - -
03 raised floor 17.00
04 concrete 16.00 2300 368.0 2.300 0.07
05 CLT ceiling 22.00 500 110.0 0.130 1.69
06 mineral wool MW 033 18.00 20 3.6 0.033 5.45
- - - -
07 air layer ventilated 4.00
- - - -
08 Clothing 1.50
rose 0.08
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings against outside air, garages (including heated ones), driveways and ventilated crawl spaces (DIN 4108-2:2013.
Minimum requirements according to Tab.3.
advance deduction
eg passages
advance deduction
Thermal insulation: eg Fixrock 033 VS from Rockwool
s ÿ ÿ R
from inside cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.17
- - - -
01 flooring 1.00
- - - -
02 raised floor 5.00
- - - -
03 raised floor 17.00
04 reinforced concrete 25.00 2300 575.0 2.300 0.11
05 mineral wool MW 033 22.00 20 4.4 0.033 6.67
- - - -
06 air layer ventilated 4.00
- - - -
07 Clothing 1.50
rose 0.08
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings against outside air, garages (including heated ones), driveways and ventilated crawl spaces (DIN 4108-2:2013.
Minimum requirements according to Tab.3.
advance deduction
thermal insulation:
1st layer: Topdeck universal from Isover
2nd layer: e.g. Topdeck DP 1 white from Isover or similar.
advance deduction
Component type "Ceiling down against the outside air"
with the heat transfer resistances Rsi = 0.17 and Rse = 0.04 m²K/W
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.17
- - - -
01 flooring 1.00
- - - -
02 raised floor 5.00
- - - -
03 raised floor 17.00
04 reinforced concrete 25.00 2300 575.0 2.300 0.11
05 mineral wool MW 035 8.00 20 1.6 0.035 2.29
06 mineral wool MW 035 10.00 20 2.0 0.035 2.86
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings against outside air, garages (including heated ones), driveways and ventilated crawl spaces (DIN 4108-2:2013.
Minimum requirements according to Tab.3.
thermal insulation:
Eg Topdeck DP 1 white from Isover or similar.
advance deduction
with the heat transfer resistances Rsi = 0.17 and Rse = 0.04 m²K/W
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.17
- - - -
01 flooring 1.00
- - - -
02 raised floor 5.00
- - - -
03 raised floor 17.00
04 reinforced concrete 25.00 2300 575.0 2.300 0.11
05 mineral wool MW 035 12.00 20 2.4 0.035 3.43
rose 0.04
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Ceilings against outside air, garages (including heated ones), driveways and ventilated crawl spaces (DIN 4108-2:2013.
Minimum requirements according to Tab.3.
In the present case, XPS 700 insulation was chosen. The permissible compressive stresses must be checked by the structural engineer.
advance deduction
E.g. Ravatherm XPS 700 SL from Ravago or similar.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.17
- - - -
01 Floor construction according to the property plan 6.00
02 waterproof concrete 50.00 2300 1150.0 2,300 0.22
- - - -
03 if necessary FBV system 04 0.50
perimeter insulation 05 blinding 12.00 25 3.0 0.038 3:16
layer - - - -
5.00
rose 0.00
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Base slabs, directly adjacent to the ground up to a room depth of 5 m (DIN 4108-2:2013. Minimum requirements
according to Tab.3.
advance deduction
In the present case, XPS 500 insulation was chosen.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
01 waterproof 30.00 2300 690.0 2,300 0.13
- - - -
concrete 02 if necessary 0.50
FBV system 03 perimeter 16.00 25 4.0 0.039 4.10
insulation Rse 0.00
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Base slabs, directly adjacent to the ground up to a room depth of 5 m (DIN 4108-2:2013. Minimum requirements
according to Tab.3.
advance deduction
E.g. Ravatherm XPS 500 SL from Ravago or similar.
s ÿ R
from inside ÿ cm kg/m³ kg/m² W/(mK) m²K/W
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Rsi 0.13
01 waterproof concrete 30.00 2300 690.0 2,300 0.13
- - - -
02 if necessary FBV system 0.50
03 perimeter insulation Rse 8.00 25 2.0 0.039 2.05
0.00
ÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿÿ
Base slabs, directly adjacent to the ground up to a room depth of 5 m (DIN 4108-2:2013. Minimum requirements
according to Tab.3.
The heat transfer coefficient for window constructions is to be determined according to DIN EN ISO 10 077 or for
curtain walls according to DIN EN ISO 12 631. Basically, the overall heat transfer coefficient of a windowhimself the
consists
of the individual heat transfer coefficients of the glazing (Ug), the heat transfer coefficient of the frame (Uf) and the
length-related heat transfer coefficient (ÿg) due to the thermal influence of the pane edge compound. Therefore, to
determine the thermal transmittance coefficient of the window / curtain wall, technical information is required that is
only available with knowledge of the actual window construction.
A frame portion of up to 30% was initially assumed for the windows. If, in the course of the planning update, there
are larger frame portions for individual elements, a thermally improved profile system must be selected. Due to the
increased glazing weight, double insulating glazing is initially considered for glazed external doors.
After determining the actual window dimensions and the frame materials, the following information must be checked.
advance deduction
The window construction requirements resulting from the verification can be achieved, for example, with the following properties.
Evidence of compliance must be provided by the manufacturer.
Glazing:
Frame:
advance deduction
Component: mullion and transom facade with triple insulating glazing (PRF-01)
The requirements for the facade construction resulting from the verification can be achieved with the following properties, for
example. Evidence of compliance must be provided by the manufacturer.
Glazing:
Frame:
External doors:
In addition, compliance with the DGNB criteria must be verified in connection with the windows or the curtain wall
Thermally separated constructions with multiple insulating glazing/multiple chambers or insulated panels
advance deduction
According to the requirements of the Building Energy Act, the requirements for summer
Meet thermal protection according to DIN 4108-2. The underlying control procedure is this
Verification method for limiting the solar input parameters. In addition, however, there is also the
Possibility of a (room-related) thermal simulation for critical room areas under specified
Boundary conditions to be carried out according to DIN 4108-2. It must be proven that according to DIN
4108-2 specified limit values of excess temperature degree hours are not exceeded. As part of the
Proof of summer heat protection according to DIN 4108-2 may only be considered for cooling
to generate cold (the expenditure for auxiliary energy is excluded from this).
In addition to the size of the room, the following key data are used in the investigations into thermal insulation in summer
a:
• Storable mass
According to DIN 4108-2, there is a choice between a light, a medium and a heavy design
advance deduction
differentiated. Increased storable masses have a favorable effect on the summer
thermal protection off
The total energy transmittance of the glazing (g value) indicates how much (solar) energy is absorbed by
"Outside" to "inside" comes through the transparent component. The g value is between 0
and 1. A g value of 0.6, for example, indicates that 60% of the incident energy is transmitted through the
The information on the total energy transmittance is given by the product manufacturers and
depend, among other things, on the structure of the pane and the coatings on the glass. Man
distinguishes between thermal insulation glazing in terms of the total energy transmittance
with a total energy transmittance of g > 0.4 and sun protection glazing with a
Sun protection devices reduce the energy input into the building. The reduction will
described by the reduction factor Fc. The reduction factor is determined by the nature of the
Sun protection device determined. In DIN 4108-2, depending on the glazing of the
product-specific reduction factors are applied if they are used for construction work
The possibility of increased night ventilation usually has a favorable effect on the summer
thermal protection off. In general, especially in office buildings, the implementation of an increased
Night ventilation via the windows not or only with for security reasons
corresponding "ventilation window sashes" possible. In the case of residential buildings, opening the
windows, an increased night air exchange can be applied, provided no special ones
Noise protection requirements are to be taken into account, especially for the night time period.
If a ventilation system is available, the ventilation system can also be used for an increased
Night air exchange can be used. The simplified procedure for limiting the
However, solar input parameters only take into account a 2-fold or 5-fold air change. at
advance deduction
• Passive cooling
According to the requirements of DIN 4108-2, cooling in the proof of the summer
Thermal protection can only be approached when there is no energy to produce the cold
The proof of the summer heat protection must be due to the predominant light construction here
as well as the high proportion of glazing can be carried out using thermal simulations. After determining the
In principle, the following sun protection and accompanying measures can be assumed:
4
4.35 4.35 4.35 4.99 8.70 4.35 8.85 13.30 7.47 5.18 4.35 4.35 4.35 4.35 4.35 15
3 5
1.35 1.70 6:14 80 8.06 9.69 17.66 7.70 45 8.85 77 16.77
3 5
1.50 1.40 15:15 35.65 4.20 15 4.20 1.07 16.47
0.80 0.80 0.80
0.80 0.80
20 30 30 20 30 20
5
5 44 8 90 15 1.40 15 6:14 15 65 40 7.22 40 19.70 20 1.34 20 5:11 30 4.38 50 6.84 50 4:17 30 9.36 20 7.22 30
walls / supports walls / supports
total
In Axles
G f columns
walls/ dimension
axis dimension
opening
E dimension
overall
A B C dimension
opening
supports
walls /
Axles total
In
3.00
3.22
dimension
opening 3.00
9 40
20
7 1.56 30
1.55
2.34
TH8 1.52
Technology
hours
15
19.62m² 19.73m
VF-R
K
. -1 . NE.-1.3 2.70
142.32m² 58.33m
-3.81
0.80
1.40
tf 4.86
11 1.20
1.20
30
hours 17.5/29
4.05 4.05
2
11
hours 17.5/29 LS
1.20
81
65
15
27
40
91
25
15 J
27
4.05
H 13.80
3.90 4.05
H
4
TH4 20
16.67 . 01 . NE.-1.5
18.97 sqm 30 4.38 50 6.68 50 4.34 30 5715 16.47 15
35.67m² 28.39m 11
NUF7: storage room 18.69 sqm
hours 17.5/29 NUF7: storage room
VF-R
7.07
I-4 7 I-4
26 5.44
1
12.92
-3.81
lift
4.42m² 2.98m²
8.10
VF-R tf
1.70
25
25
4.80 4.80
8.80 sqm 1.92 0.97
I-2
2.69
4
7.56
5
11
5
30 1.90 25 5.35
I-2
9.19 sqm
1 hour
h=16
28.84 sqm
NUF7: storage room 3 24 175/255
hours
9
I
TF8: Elevator system
5.09 30 pitches 7.69
H-3 corridor
7.70
2 . -1 . NE.-1.4 -3.81
16.09m² 20.74m 35.61 4
23
6.72
VF-R 6.34
12.67
57.51 sqm
NUF7: storage room usable
area
the
no
in marking
routefloor
escape
Technology 5
. -1 . NE.-1.1
38.31 sqm
89.50m² 48.47m 3.88
VF9: Hallway
H-2 4.51 sqm
tf TF8: shaft
40 8 9.94 5 7.56 2.45 5.35
5
1.16 sqm
5 TF8: shaft 22
40
11 11
5 40 H
42.93
9.47
27.22 sqm
10:43 10:43
7.08
Technology underground
parking
for
ventilation
grille
4.91 sqm
4.07
. -1 . NE.-1.2 21
NUF7: storage room 6
164.51m² 79.76m 5.07 5.07
tf
30
6.99
13.84 sqm
advance deduction
NUF7: storage room 7.70
G
20 20
3
40 17.61 30 7.40 40 9:22 29 56 2.38 50 2.58 40 5.24 54 4.25 75 23 30 21
7
F-2 F-2 12.32 sqm
VF9: Hallway
4.05
1.50m
line 15 hours
2.79
6
18/27 37
55.89
4.05
8th
f 11.57 sqm
NUF7: storage room
1 hour
h=13
19
40
D 2.30
f
5.20 6.00 5.20
4 9
1:11 1.40 15.45
opening dimension
0.80 T30 RS
E-2
h=173
hours
50
6
4.05 30 4.05
9
18
6 6 42.82 sqm 26.34 sqm
VF9: Hallway NUF7: storage room
4.05
-3.81
11:13 11:13
16.53
E 19.70 sqm
NUF7: storage room
7.70
E
29.94 sqm
NUF7: storage room Technology
10 . -1 . NA.-1.5
D-2 17 39.79m² 28.55m
tf
3 hours underground
parking
for
ventilation
grille
75
4.05
h=19 4.05
D 1.85
0.84 8.60
0.80 1.43
. -1 . NB.-1.10
4.07
NUF7: storage room 3.64 4.07
16.04m² 16.50m
12
6.09 VF-R 3.00
-3.81 1.91 30 Project: Component: Planner: LP: plan type: plan content: plan number: Index:
6.19 m2
T30 RS
PTC -BT0 -ARC -3 -GR -UG -001 -V00
C-2 SN6 - basement room S C-2
T30 RS
Ophuls
4.42m²
Site map:
G f E A B C
1st floor left
1.70 T30
R 1.20 30 1.20
tf
1.70
U=5.05m
T30 RS
lift courtyard 3
1.53
30
25 4.42m²
C-1
sluice sluice
C-1 yard 2
5.23m2 _ T30 RS lift
VF-R H H
SN 5 - . -1 . NA.-1.1 . -1 . NA.-1.2
Redi basement room 2.97m² 4.42m²
25.14m² 20.50m 20.30m² 18.94m
1st floor on the right tf Technology TH2 VF-R
yard 6 ND B.A
. -1 . NB.-1.1 . -1 . NB.-1.7 VF-R VF-R
U=9.80m 1.79m² 17.5/29
hours
11
TH3 TH1
17.5/29
hours
11
7.16m2 _ 2.19m2 _ 39.94m² 34.90m 25.19m² 25.22m
tf 16
U=11.70m U=6.2m -3.81 NO BD
lift . -1 . NB.-1.4
11
tf VF-R
-3.81
. -1 . NA.-1.3 NC
-3.81
1.20
1.20
2.71
30
4.64
4.42m² 24.29m² 23.40m 23.29m² 21.78m 4.64
D D
13.56 m2
VF-R VF-R
hours 17.5/29 lift VF-R
30.21 m2 RH 1.96m 2.97m²
U=42.50m 14.29 m2 4.21m² courtyard 1
RH=1.53m U=14.71m VF-R
corridor tf courtyard 5
5.50m2
U=16.1m -3.81 . -1 . NB.-1.2 courtyard 4
1.50 1.49
37.53m² 53.14m 1.20 30 1.20
5.64m2 _ 2.75m² T30
RS 2.00m² T30
RS
VF-R
18:33 18:33
RH=2.08m 15
B =9.6m
U tf tf B
U=10.60m 1.12
1.70
1.70
77
30
30
30
30
B-WB NB
1.49
25
25
N/A
U=19.24m
T30 RS 15.20
WC-D Pettenkofferstrasse
. -1 . NB.-1.8
T30
RS
14.90m² 15.53m Technology
8.10 7.70
GFA=73m2
NUF-R
14
. -1 . NA.-1.4
88.79m² 47.89m 7.70 8.10
ThePettCo New construction and extension of commercial building (office) and loft conversion of an existing building
residential purposes
19.62 m2 13.62 m2 16.57 m2 Technology
T30
RS tf
bicycle storage bicycle storage warehouse Pettenkoferstrasse 16-19, 10247 Berlin
heating 19.35 m2 . -1 . NB.-1.3 -3.81 Stairs . -1 . ND.-1.3
RH=2.00m RH=2.02m RH=2.10m U=17.1m 17.45m2 _ 5.31m² builder
200.25m² 67.41m 31.27m² 23.52m
U=19.72m U=16.6m U=19.5m RH 1.57m U=17.5m
tf
VF-R
NUF-R
-3.81 Trockland XXV Pettenkoferstrasse 16-19 GmbH
20
Hauptstraße 27, staircase E
28 1.50 30 2.60 30 2.67 25 22:12 30 96 30 3.32 30 4.06 30 2.60 30 6.00 50 4.70 30 3.28 25 1.75 25 2.70 30 1.72 25 1.00 3.50 75 30 10827 Berlin
WC-H
T30
RS . -1 . NB.-1.9
TGA STATIC
15.48m² 15.80m specialist planner
TGAX Ltd Knippers Helbig GmbH
NUF-R
Kurfürstenstrasse 195 Zehdenicker Str. 21
13
A 40 40 40 A 10707 Berlin 10119 Berlin
20 20 20 48
dimension
opening total
In Axles
20
28 30 30 35 50 30 25 30
Axles total
In dimension
opening G f E 34.62
A 4.06 4.02 4.53 B 4.70 10.25 C 5.25
walls / supports
18:22 70.22
DEDUCTION
Ground floor plan
1 2 3 4 5 6 7 8th 9 10 11 12 13 14 15 16 17 18
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
4
4.35 4.35 4.35 4.99 8.70 4.35 8.85 13.30 7.47 5.18 4.35 4.35 4.35 4.35 4.35 15
5
12
8th
5
50 3.85 50 3.85 8 96 16.44 5.48 3.85 50 3.85 50 3.85 50 3.41 1.56 3.30 32 4.06 3.92 50 3.85 50 3.85 50 4.92 8.03
2.94 2.94 6.85 3.75 3.75 3.75 3.75 3.75 3.75 6.85 3.75
25
5
30 30 40 30 40 39 36 36 36 30 96 30 32 30 36 36 36 30 25 30 30
8th
walls / supports
4:15 5:19 7.56 7.22 5.03 3.99 3.99 3.99 3.48 3.30 4.06 2.60 30 1.12 36 3.99 3.99 3.99 1.70 2.70 1.72 25 5.25 walls / supports
Axles total
In total
In Axles
dimension
opening
G f columns
walls/ dimension
axis dimension
opening
E dimension
overall
A B C
dimension
opening
supports
walls /
Intensive facade greening
Vegetation area with ground connection
nb . 00 . NC.0.1 3.00
4:17
(23)
Clear trunk, trunk circumference 18-20cm
T90
RS nb . 00 . BD.0.3 1.52
2.70
3.45
9
32.85m² 34.21m
5.00 4.99 2.94
4.86 VF-R 4 +0.00 4
Concert Hall II
UG
11 1.20
1.20
30 1.25
replacement tree 2 hours 17.5/29
Ventilation grille underground car park
nb . 00 . BE.0.2
ventilation
grille wood
UZ
50 T30 RS 34 50 courtyard 3
J-2 Vegetation area with ground connection J-2
5
1.80 corridor Ventilation grille underground car park
+0.00 75
25
68
nb . 00 . BE.0.4 Entrance
ground
floor
1st floor parapet as support beam
11
hours 17.5/29
9.65m² 20.48m 34 J
VF-R
H 30 H Workshop I
NUF-R
4.05 2.94
3.55 2.94
3.55
1 3.88 4.05
14.62m 13.28m² .
02 . NE.4.4 NUF-R
4 1.80 M, Fl, Pa
Bicycle stand tea kitchen
Wall
16.69 19.28m 22.68m² . 2.94
11 (14) 02 . NE.4.4
16.75 Lawn tea kitchen
hours 17.5/29 office
50 50 nb . 00 . BA.0.8 office
I-4 25 I-4 nb . 00 . BA.0.6
52.52m² 30.43m
36.35m² 24.23m
9.05
NUF-R
7.35
NUF-R
+0.00 lift Vegetation area with ground connection
7.01
4.42m² 2.50m²
8.10
+0.76
VF-R tf Flooring: cobblestones
yard 6 TH4
1.70
25
cobblestones
Flooring:
4.80 2.94
4.30 . 01 . NE.0.2 4.80 2.94
4.30
2.94
52.84m² 42.22m
VF-R
2.40 Bicycle stand
M, Pu, Pa (26)
Entry
connection
Vegetation
ground
area
with
I-2
2.69
4
50
2.94 1.96
ventilation grille 5
T30 RS
Entrance
ground
floor
40 50 I-2
Technology
nb . 00 . BD.0.6
office
electric
nb . 00 . ND.0.6
4.38m² 8.60m
tf
4.20m²
tf
Parking space for minibus
7.5 x 3.5m
15.40
office
nb . 00 . BA.0.7
50.21m² 36.00m
NUF-R
19/27
hours
4
17/27
175/255
hours
9
hours
11
WC-H
2:12 0.89
nb . 00 . BA.0.3
9.16m² 13.81m
WC-D
nb . 00 . BA.0.4
9.26m² 12.62m
NUF-R
2:12 0.89
34
I
7.81 40 7.37 9.16m² 12.58m nb . 00 . BD.0.5 NUF-R
UG
tf
4.69 5.09 2.94
4.59
142.58m² 57.15m
H-3 UZ wood
NUF-R +0.76
passage WC-H TH9
Bicycle stand nb . 00 . BD.0.9 +0.03
3.85 nb . 00 . ND.0.5 nb . 00 . BA.0.06 6.75 2.94
7.59
Own 2.22
advance deduction
3
4:15 30 4.05 30 8.81 40 7.37 34 50 G
1.90
+0.00
+0.76
1.50
2.94
40 ground floor:
F-2 UZ wood F-2
Movement area fire brigade 12x7 m
lift
ventilation grille 4.10m² T30
RS
3.71 2.94
3.55 4.05
UG
TH5 1
h=20
Stg. 15 hours
VF-R
2.79
6 nb . 00 . NC.0.8 18/27
passage 13.35m² 16.10m
OK KG -3.00 support
parapet
beam
floor
1st
as
passage garage
Movement area fire brigade 12x7 m office OL 0.93
17.37m² 22.87m D
nb . 00 . BD.0.10
Covered space 3 1 1 4 6 nb . 00 . ND.0.2 extension VF-R
50 4.85 3.35 50 3.85 50 3.85 8.71 4:23 34 3.71 2.62 1.04 1.20 2.60 1:12 2.23 33.64m² 24.44m TH 10 11 hours 0.00=48.40m
OKFF
a.s.l.
NN
opening dimension M, Pu, Pa 167.62m² 90.26m
2.94
ullra
um
M hedge 2.94 2.94 2.94 37 50 NUF-R 40 17/27
E-2 NUF-R
3 28
4.55 3.85 Playground 50 m2 9:31
In total 30 7:12 40 28 21:22 92 30 40 28 18.50 7:12 30
4.05 5.21 7.00 19:33 3.71 2.94
3.55
50.13 4.05
EGN:
Use
the
in
slide
6 +0.03
+0.00
playhouse +0.00
11:13
Wall delimitation courtyard 3.71 4.05 2.94
3.55
firewall
garage ventilation
grille
E garage 34 50 E
M, Pu, Pa M, Pu, Pa
hedge courtyard 1 garbage room
Business nb . 00 . NA.0.9
nb . 00 . NC.0.1 34 50 2.22
D-2 43.91m² 28.08m
Root bridges / L-stones in the courtyard 5 79.94m² 40.75m courtyard 4 NUF-R
65
underground
parking
for
4.05 sandbox root area of the existing tree NUF-R TH6 ventilation
Hood
for +0.00 3.71 2.94
3.55 4.05
nb . 00 . NC.0.7
6 D system without
WCA
Use: window losed
all
w
opening,C
cobblestones
Flooring:
12.30m² 14.89m
2.50 1.20
1.70 VF-R
39.89 stock tree 3.71 4.05 2.94
3.55 12 hours
18/24
0.90/12.0 Intensive
greening
facade
GFA=100m2
ventilation
grille
D 34 50 D
Vegetation area with ground connection
connection
Vegetation
ground
area
with
34
C-3
airspace Bicycle stand index date signed changes
2.Input Business
3.02m2 _
toilet 1 . 00 . NA.0.10 (6) nb . 00 . NA.0.6 3.65
46.48m² 34.17m
4.07 2.94
3.57 4.07
passage 27.05m² 22.08m
3.21m2 _
WC1 - anteroom - WC2 Covered space VF-R
anteroom NUF-R
1.96m2 _ RN: 0-2-06 Project: Component: Planner: LP: plan type: plan content: plan number: Index:
toilet 2 U=14.27m +0.31
4:19 4.52
2.94 4.61
1.89m²
17.5/29
hours
11
VF-R Walls: FB corridor
5.21m2 _ 1.73m2 _ nb . 00 . NB.0.2 28.98m² 29.15m Window to TH: F30
17.5/29
hours
11
tf nb . 00 . NA.0.8
warehouse
RN: 0-2-04 13.23 m2 WC
7.20m² 12.60m lift VF-R 11 1.20
1.20
30
Ground floor passage
NO NC BD
4.64
rest room RN: 0-1-04 11.68m² 17.02m 4.64
8.56 25 2.08 2.08 25 3.99 25 17.17 30 4.06 30 8.48 25 3.99 25 4:16 25 7.28 25 5.25 30
TGA STATIC
specialist planner
3.00
TGAX Ltd Knippers Helbig GmbH
-0.47 Kurfürstenstrasse 195 Zehdenicker Str. 21
1.50
A -0.14 A 10707 Berlin 10119 Berlin
28
40
51
-0.64
28
40 1 48
49
67
ventilation grille 90
for technology ventilation grille
Old building C, residential building 1.00 architects Architect design in cooperation
+0.17 +0.10 for underground parking Entrance to the underground car park
REALACE Ltd
1.37 Entry ventilation grille Thomas Hillig Architects GmbH
5.42 4.20 Waldemarstrasse 37A
Entry Entry Entry Entry Entry Entry Tempelhofer Ufer 32
10963 Berlin 10999 Berlin
dimension
opening total
In Axles
7 9 3 4 1
Axles total
In dimension
opening
2.68 2.00 8.06 G f 3.20 2.26 28 4:15 36 3.99 36 3.99 36
E 3.99 36 3.99 A 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 B 36 3.99 36 3.99 36 3.99 C 36 2.87 25 5.25 30
walls / supports
50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.92 36 2.87 25 5.25 30
2.85 2.90 2.90 6.82 3.00 3.10 3:15 3:15 3.25 3.30 3.35 7:21 3.40 3.50 3.50 3.50
18:32 70.02
CAD file name:
Planning level:
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
4
4.35 4.35 4.35 4.99 8.70 4.35 8.85 13.30 7.47 5.18 4.35 4.35 4.35 4.35 4.35 25
5
9.66
8th
5
50 3.85 50 3.85 8 96 16.44 4.98 50 3.85 50 3.85 50 3.85 50 3.41 1.56 3.30 32 4.06 4.75 3.85 50 3.85 50 3.85 13.45
2.94 2.94 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40
25
5
30 30 40 30 40 39 36 36 36 30 96 30 32 30 36 36 36 30 25 30 30
8th
walls / supports
4:15 5:19 7.56 7.22 5.03 3.99 3.99 3.99 3.48 3.30 4.06 2.60 30 1.12 36 3.99 3.99 3.99 1.70 2.70 1.72 25 5.25 walls / supports
Axles total
In total
In Axles
G f E A B C
dimension
opening dimension
opening
Intensive facade greening
supports
walls /
12 hours 11 hours
3.00 3.00 18/26 18/26 TH7
. 01 . BD.1.1
12.26m² 15.16m 3.00
10 hours VF-R
Intensive facade greening 18/26
+3.85 1.52
+4.00
I-4 50 50 I-4
office office
+3.85 tea kitchen . 01 . BA.1.8 . 01 . BA.1.9
tea kitchen
lift 1.70
25
. 02 . NE.4.4
. 02 . NE.4.4 54.77m² 31.27m 37.94m² 24.69m
4.42m² 2.50m² 24.10m² 20.88m NUF-R NUF-R
7.73 7.73 8.10
19.23m² 17.87m 3.61
T30
RS
VF-R tf NUF-R
NUF-R
4.80 2.94
4.30
yard 6 25
4.80 2.40
4.30
composite
steel
UZ
BRH=1.10m electric
toilet b nb . 00 . NE.1.3
. 02 . NE.1.7
9.64m² 12.80m 2.40
7.70m² 11.40m 15.5/29
hours
2
tf
openable
window
sashes
front
of
in
2.69
4
4
50
0.91 1.96
. 01 . NE.1.1
369.96m² 132.68m
NUF-R
WC-D
. 02 . NE.1.6
9.88m² 13.20m
NUF-R
40
40 I-2
electric
. 01 . ND.1.5
4.38m² 8.60m
tf
4.20m²
tf
UZ steel composite
15.40
office
. 01 . BA.1.7
33.68m² 23.97m
12.79m² 15.30m
17/27
VF-R
hours
9
17/27
hours
10
lobby
. 01 . BA.0.5
19.80m² 27.88m
VF-R
WC-H
. 01 . BA.1.3
9.24m² 13.75m
WC-D
. 01 . BA.1.4
9.26m² 12.62m
3 37
I
7.82 3.40 3.97 17/27
hours
11 NUF-R NUF-R
NUF-R
tea kitchen 4.69 5.09 2.40
5.09 +4.16
H-3
. 02 . NE.1.4 WC-H
WC-H . 01 . ND.1.2
20.27m² 18.15m
. 02 . NE.1.5
9 11.51m² 14.61m
NUF-R 6.71 5.94 6.74 6.34
6.95m² 10.97m Unit 1.6. NUF-R
7
NUF-R11.93
GFA=331m2
28
38.25
UZ wood
40 50 lift
H-2
4.95m² WC-D
. 01 . ND.1.3
VF-R
office +3.85 2 hours +4.16
11.26m² 14.51m
. 01 . ND.1.4 15.5/29
NUF-R
219.03m² 77.91m
airspace NUF-R
40 H
TH5
22 hours T30
RS . 01 . BD.1.8
+4.00
9.47 9.57 9.47
wood
UZ wood
UZ
BRH=1.00m 17.5/29 4.78 2.40
4.68 14.07m² 16.36m T30
RS 1st floor parapet as support beam
Terrace of
VF-R
office unit 0.7.
7.49 7.08
2.40
3.62 4.07
16/26
hours
11
corridor
. 01 . BA.1.10 office
terrace . 01 . BA.1.2
T30 RS
firewall office 48.45m² 55.69m
. 01 . NC.1.9 16/25 . 01 . ND.1.4 38.32m² 29.24m
hours
13
VF-R
70.13m² 34.01m 363.11m² 165.15m NUF-R
advance deduction
3 9
8.48 34 8.79 40 7.37 NUF-S NUF-R 50 G
2:14 1.60
30
+4.16
40 1.45
2.40
40
50
F-2 F-2
27
lift
in front of window sashes that can be opened 4.10m² 2.40
3.55 4.05
T30
RS
BRH=1.10m 1.80 5.32 4028 4:23 34 3.71 34 1.10 VF-R
2.79
6
E 15.5/29
hours
2
50 E
T30 RS
courtyard 1 WC-D WC-H
office T30 RS . 01 . NA.1.7 . 01 . NA.1.5
. 01 . NC.1.5 34 50 2.13m² 5.86m 2.13m² 5.86m
134.41m² 53.33m D-2
courtyard 5 courtyard 4 NUF-R NUF-R
NUF-R
11 hours
TH6
4.05 2.40
3.55 4.05
16/26 wall
fire
6 D . 01 . BD.1.7
12.72m² 15.23m
VF-R 12 hours 18/26 11 hours
+3.85
39.89 3.71 4.05 2.40
3.55
18/26
D 10 50 D
Intensive
greening
facade
34 50
C-3 index date signed changes
F30
3.77 3.34
4.07 4.07
F90
+3.85
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
4:19
2.40 3.83
T30 RS Intensive facade greening
40
28
PTC-BT0-ARC-3-GR-01-001-V00
C-2 8.07m2 _ C-2
bath Site map:
RN: 1-2-04 5.92m2 _ TH2 2.91m² WC-D G f E A B C
U=14m bath . 02 . NB.1.9
RS
. 01 . NA.1.2 1.20 30 1.20
1.70
tf 1.70
RN: 1-1-05 Intensive facade greening 20.57m² 19.03m 2.50m² 6.42m
U=11.74m T30 RS VF-R courtyard 3
30 NUF-R
C-1 C-1 yard 2
lift 1.70
1.12
30
30
H H
2.97m² 11
4.42m²
tf hours 17.5/29
VF-R 17.5/29
hours
11
yard 6 ND B.A
37.61 m2 14.78m2 _ 5.99
lobby
2.71 30 17.5/29
hours
11
living room TH3 1.91m²
17.5/29
hours
11
U=16.82m . 02 . NA.1.1
RN: 1-2-03 10.66 m2 10.71 m2 corridor
tf
17.5/29
hours
11
18:33 2.75m²
1.74
25
Walls: FB 2.00m² Walls: FB 30.94m² 22.68m
22.66m² 25.46m
VF-R
B tf Window to TH: F30 tf
77
30 Window to TH: F30 NUF-R 40 B
UZ wood UZ wood
T30 RS
B-WB NB N/A
T30 RS WC-H WC-D office
4.66m2 _ . 01 . NB.1.5 . 01 . NB.1.4 . 01 . NA.1.4
+3,994
15.40 15:41
corridor
2.67m² 6.54m 2.67m² 6.54m 60.97m² 40.60m
RN: 1-2-01 corridor office Unit 0.1.
T90
RS T30
RS
dimension
opening total
In Axles
7 9 3
28 36 36 36 36 36 36 36 36 36 36 B36 36 36 36 36 36
Axles total
In dimension
opening
2.68 2.00 8.06 G f 3.20 2.26 4:15 3.99 3.99 E 3.99 3.99A 3.99 3.99 3.99 3.99 3.99 3.99 3.99 3.99 3.99 C 3.99 3.99 walls / supports
50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50
2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40
18:32 70.11
CAD file name:
4
Planning level:
design planning 0263_3_LP_GR_AN_SN.vwxp
4.35 4.35 4.35 4.99 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
PTC-BT0-ARC-3-GR-01-001-V00
Machine Translated by Google
4
4.35 4.35 4.35 4.99 8.70 4.35 8.85 13.30 7.47 5.18 4.35 4.35 4.35 4.35 4.35 25
5
9.66
8th
5
50 3.85 50 3.85 8 96 16.44 4.98 50 3.85 50 3.85 50 3.85 50 3.41 1.56 3.30 32 4.06 4.75 3.85 50 3.85 50 3.85 13.45
2.94 2.94 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40
25
5
30 4:15 30 5:19
8th
40 7.56 30 7.22 40 5.03 39 3.99 36 3.99 36 3.99 36 3.48 30 96 30 3.30 32 4.06 30 2.60 30 1.12 36 3.99 36 3.99 36 3.99 36 30 1.70 25 2.70 30 1.72 25 5.25 30
walls / supports walls / supports
Axles total
In total
In Axles
G f E A B C
dimension
opening dimension
opening
Intensive facade greening
supports
walls /
12 hours 11 hours
3.00 3.00 18/26 18/26 TH7
. 01 . BD.1.1
12.26m² 15.16m 3.00
10 hours VF-R
Intensive facade greening 18/26
+3.85 1.52
+4.00
I-4 50 50 I-4
office office
+3.85 tea kitchen . 01 . BA.1.8 . 01 . BA.1.9
tea kitchen
lift 1.70
25
. 02 . NE.4.4
. 02 . NE.4.4 54.77m² 31.27m 37.94m² 24.69m
4.42m² 2.50m² 24.10m² 20.88m NUF-R NUF-R
7.73 7.73 8.10
19.23m² 17.87m 3.61
T30
RS
VF-R tf NUF-R
NUF-R
4.80 2.94
4.30
yard 6 25
4.80 2.40
4.30
composite
steel
UZ
BRH=1.10m electric
toilet b nb . 00 . NE.1.3
. 02 . NE.1.7
9.64m² 12.80m 2.40
7.70m² 11.40m 15.5/29
hours
2
tf
openable
window
sashes
front
of
in
2.69
4
4
50
0.91 1.96
. 01 . NE.1.1
369.96m² 132.68m
NUF-R
WC-D
. 02 . NE.1.6
9.88m² 13.20m
NUF-R
40
40 I-2
electric
. 01 . ND.1.5
4.38m² 8.60m
tf
4.20m²
tf
UZ steel composite
15.40
office
. 01 . BA.1.7
33.68m² 23.97m
12.79m² 15.30m
17/27
VF-R
hours
9
17/27
hours
10
lobby
. 01 . BA.0.5
19.80m² 27.88m
VF-R
WC-H
. 01 . BA.1.3
9.24m² 13.75m
WC-D
. 01 . BA.1.4
9.26m² 12.62m
3 37
I
7.82 3.40 3.97 17/27
hours
11 NUF-R NUF-R
NUF-R
tea kitchen 4.69 5.09 2.40
5.09 +4.16
H-3
. 02 . NE.1.4 WC-H
WC-H . 01 . ND.1.2
20.27m² 18.15m
. 02 . NE.1.5
9 11.51m² 14.61m
NUF-R 6.71 5.94 6.74 6.34
6.95m² 10.97m Unit 1.6. NUF-R
7
NUF-R11.93
GFA=331m2
28
38.25
UZ wood
40 50 lift
H-2
4.95m² WC-D
. 01 . ND.1.3
VF-R
office +3.85 2 hours +4.16
11.26m² 14.51m
. 01 . ND.1.4 15.5/29
NUF-R
219.03m² 77.91m
airspace NUF-R
40 H
TH5
22 hours T30
RS . 01 . BD.1.8
+4.00
9.47 9.57 9.47
wood
UZ wood
UZ
BRH=1.00m 17.5/29 4.78 2.40
4.68 14.07m² 16.36m T30
RS 1st floor parapet as support beam
Terrace of
VF-R
office unit 0.7.
7.49 7.08
2.40
3.62 4.07
16/26
hours
11
corridor
. 01 . BA.1.10 office
terrace . 01 . BA.1.2
T30 RS
firewall office 48.45m² 55.69m
. 01 . NC.1.9 16/25 . 01 . ND.1.4 38.32m² 29.24m
hours
13
VF-R
70.13m² 34.01m 363.11m² 165.15m NUF-R
advance deduction
3 9
8.48 34 8.79 40 7.37 NUF-S NUF-R 50 G
2:14 1.60
30
+4.16
40 1.45
2.40
40
50
F-2 F-2
27
lift
in front of window sashes that can be opened 4.10m² 2.40
3.55 4.05
T30
RS
BRH=1.10m 1.80 5.32 4028 4:23 34 3.71 34 1.10 VF-R
2.79
6
E 15.5/29
hours
2
50 E
T30 RS
courtyard 1 WC-D WC-H
office T30 RS . 01 . NA.1.7 . 01 . NA.1.5
. 01 . NC.1.5 34 50 2.13m² 5.86m 2.13m² 5.86m
134.41m² 53.33m D-2
courtyard 5 courtyard 4 NUF-R NUF-R
NUF-R
11 hours
TH6
4.05 2.40
3.55 4.05
16/26 wall
fire
6 D . 01 . BD.1.7
12.72m² 15.23m
VF-R 12 hours 18/26 11 hours
+3.85
39.89 3.71 4.05 2.40
3.55
18/26
D 10 50 D
Intensive
greening
facade
34 50
C-3 index date signed changes
F30
3.77 3.34
4.07 4.07
F90
+3.85
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
4:19
2.40 3.83
T30 RS Intensive facade greening
40
28
PTC-BT0-ARC-3-GR-01-001-V00
C-2 8.07m2 _ C-2
bath Site map:
RN: 1-2-04 5.92m2 _ TH2 2.91m² WC-D G f E A B C
U=14m bath . 02 . NB.1.9
RS
. 01 . NA.1.2 1.20 30 1.20
1.70
tf 1.70
RN: 1-1-05 Intensive facade greening 20.57m² 19.03m 2.50m² 6.42m
U=11.74m T30 RS VF-R courtyard 3
30 NUF-R
C-1 C-1 yard 2
lift 1.70
1.12
30
30
H H
2.97m² 11
4.42m²
tf hours 17.5/29
VF-R 17.5/29
hours
11
yard 6 ND B.A
37.61 m2 14.78m2 _ 5.99
lobby
2.71 30 17.5/29
hours
11
living room TH3 1.91m²
17.5/29
hours
11
U=16.82m . 02 . NA.1.1
RN: 1-2-03 10.66 m2 10.71 m2 corridor
tf
17.5/29
hours
11
U=14.87m
clearance min 122.84m² 54.48m VF-R
2.50m² 6.42m clearance min TH1 courtyard 5
NUF-R tea kitchen
WxH=3.50x3.50 m 1.20 30 1.20
NUF-R WxH=3.50x3.50 m . 02 . NE.4.4
. 01 . NA.1.6 courtyard 4
18:33 2.75m²
1.74
25
Walls: FB 2.00m² Walls: FB 30.94m² 22.68m
22.66m² 25.46m
VF-R
B tf Window to TH: F30 tf
77
30 Window to TH: F30 NUF-R 40 B
UZ wood UZ wood
T30 RS
B-WB NB N/A
T30 RS WC-H WC-D office
4.66m2 _ . 01 . NB.1.5 . 01 . NB.1.4 . 01 . NA.1.4
+3,994
15.40 15:41
corridor
2.67m² 6.54m 2.67m² 6.54m 60.97m² 40.60m
RN: 1-2-01 corridor office Unit 0.1.
T90
RS T30
RS
dimension
opening total
In Axles
7 9 3
28 36 36 36 36 36 36 36 36 36 36
Axles total
In dimension
opening
2.68 2.00 8.06
G f 3.20 2.26 4:15 3.99 3.99 E 3.99 3.99A 3.99 3.99 3.99 3.99 3.99 3.99 B36 3.99 36 3.99 36 3.99 C 36 3.99 36 3.99 36
walls / supports
50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50
2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40
18:32 70.11
CAD file name:
4
Planning level:
design planning 0263_3_LP_GR_AN_SN.vwxp
4.35 4.35 4.35 4.99 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
PTC-BT0-ARC-3-GR-01-001-V00
Machine Translated by Google
4
4.35 4.35 4.35 4.99 8.70 4.35 8.85 13.30 7.47 5.18 4.35 4.35 4.35 4.35 4.35 25
5
9.66
8th
5
50 3.85 50 3.85 8 96 16.44 2.72 1.43 83 50 3.85 50 3.85 50 3.85 50 3.41 1.56 3.30 32 4.06 4.25 50 3.85 50 3.85 50 3.85 50 2.43 1.43 99 7.80 30
2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94
25
5
30 4:15 30 5:19
8th
40 7.56 30 7.22 40 5.03 39 3.99 36 3.99 36 3.99 36 3.48 30 96 30 3.30 32 4.06 30 2.60 30 1.12 36 3.99 36 3.99 36 3.99 36 30 1.70 25 2.70 30 7.22 30
walls / supports walls / supports
Axles total
In total
In Axles
dimension
opening
G f columns
walls/ dimension
axis dimension
opening
E dimension
overall
A B C
dimension
opening
supports
walls /
11 hours 11 hours
3.00 3.00 18/26 18/26 TH7
. 03 . BD.3.1
13.00m² 15.56m
11 hours VF-R
18/26
6 25
6
T30 RS
1.57 1.56 30
WC-H
1.82
5.00
wood
UZ
4.99 2.94
5.36 WC-D
. 03 . BD.3.2 +11.55 11
hours 17.5/29 5.84 5.84
9.89m² 12.64m
4.05 2.94
3.55 4.05
NUF-R
25 yard 2 6.49
T30 RS
corridor 4.80
5 BRH=1.10m
7.81 7.77 . 03 . BD.3.4
16.79m² 27.71m 2.95
T30 RS 2.94
50 34 VF-R openable
window
sashes
front
of
in
J-2 J-2
courtyard 3
1.80 in front of window sashes that can be opened
BRH=1.10m
11
hours 17.5/29
5.36 J
H 30 H
4.05 2.94
3.55 4.05 2.94
1 3.88
+11.55
16.69
4
7
1.80
11
16.75
7:12 hours 17.5/29
TH4
I-4 50 . 01 . NE.3.2 I-4
35.67m² 28.39m office office
VF-R . 03 . BA.3.8 . 03 . BA.3.9
lift 1.70
25 56.90m² 31.79m 39.26m² 25.12m
4.42m² 2.50m² tea kitchen tea kitchen 3.61 +10.88
NUF-R NUF-R
7.73 8.10
T30
RS
VF-R tf . 02 . NE.4.4 . 02 . NE.4.4
yard 6 25 24.90m² 21.00m 19.23m² 17.87m
NUF-R
composite
steel
UZ
4.80 4.80 NUF-R
BRH=1.10m
electric
4.80
2.94 BRH=1.10m 13.94
2.94
toilet b
. 02 . NE.3.7 nb . 00 . NE.3.3 16.7/28
hours
4
openable
window
sashes
front
of
in 7.70m² 11.40m 9.64m² 12.80m openable
window
sashes
front
of
in 2.40
NUF-R tf
TH9 Unit 3.3.
1.80 T30
RS . 03 . BA.3.6 T30
RS GFA=305m2 14:41
I-2
2.69
4
4
2.94 1.96
5
WC-D
. 02 . NE.3.6
9.98m² 12.70m
NUF-R
2
40 I-2
electric
. 03 . ND.3.5
4.38m² 8.60m
tf
4.20m²
tf
UZ steel composite
15.40
office
13.14m² 15.58m
hours
5/27
17
9
VF-R
17/27
hours
9
1.96 0.70
WC-H
. 03 . BA.3.3
9.94m² 14.27m
NUF-R
WC-D
. 03 . BA.3.4
9.94m² 13.08m
NUF-R
I
7.81 40 3.40 4:12 . 03 . BA.3.7 5/2710
17 hours
lobby
4.69 5.09 2.94 34.49m² 24.16m . 03 . BA.3.5
H-3 tea kitchen WC-H NUF-R 20.03m² 28.16m
. 02 . NE.3.4 . 03 . ND.3.4
Terrace of VF-R
WC-H 9 49.06m² 31.74m
office unit 3.6. 11.60m² 14.81m
. 02 . NE.3.5 NUF-R +11.65 NUF-R
6.71 6.73 6.34
6.95m² 10.97m
11.93
NUF-R
UZ wood UZ wood
40 50
UZ wood
lift WC-D
H-2 Unit 3.5.
4.95m² . 03 . ND.3.3
GFA=331m2
VF-R
office 12.89m² 15.31m +11.55 4 hours +10.88
. 03 . BD.3.5 NUF-R 16.7/28
wood
UZ wood
UZ 228.19m² 76.80m
NUF-R
39 H
TH5
9.47 10:43 9.57 9.47
T30
RS . 03 . BD.3.8
4.78 2.94
4.68 14.90m² 16.94m T30
RS in front of window sashes that can be opened corridor
VF-R BRH=1.10m . 03 . BA.3.10
48.49m² 55.67m
7.08 VF-R
3.71 2.94
3.63 4.07
16/26
hours
11
office
. 03 . BA.3.2
T30 RS firewall 16/26
hours
11 40.14m² 29.74m
16/26 NUF-R
airspace
hours
11
advance deduction
3 9
8.48 34 8.79 40 1.59 30 5.48 34 50 G
2:14 1.60
30
+10.88
40 1.40
2.94
50
50 office
F-2 F-2 . 03 . ND.3.2
363.07m² 165.12m lift
in front of window sashes that can be opened NUF-R 4.10m² T30
RS
3.71 2.94
3.55 4.05
D
50 f
3
50 3.85 50 3.85 50 3.85 50 3.85 1.01 1.49 13.16m² 16.04m
9 hours 9 hours
opening dimension VF-R
2.94 2.94 2.94 2.94 34 50 19 5 /27 17 5/27 _
E-2
T30 RS
3
17.97
4.05 In total 19:33
16.7/28
hours
4 3.71 2.94
3.55 4.05
50.13
30 28
6 1.80 50 5.23 40 21:49 57 4.81 6412 1.68 5.32 40 18.50 30 1.34 25 5.87 29
3.71 4.05 2.94
3.55
11:13
+11.65
16.7/28
hours
4
E 34 50 E
T30 RS
courtyard 1
T30 RS
34 50
courtyard 5 courtyard 4
D-2
11 hours
4.05
18/26
TH6 3.71 2.94
3.55 4.05
. 03 . BD.3.7
6 D office
13.38m² 15.74m . 03 . NA.3.9
firewall
VF-R 51.81m² 35.03m
39.89 3.71 4.05 2.94
3.55 11 hours 11 hours
Intensive
greening
facade
18/26 18/26 NUF-R
D +11.55 10 34 50 D
maintenance
accessible
Roof
area
only
for
+11.55
greening.
greening
Intensive
facade
and
roof
34 50
C-3 index date signed changes
3.77
3.70
8.74 m2
4.07 2.94
3.57 4.07
bath +11.05 F90 +11.55 F30
RN: 3-2-04 Project: Component: Planner: LP: plan type: plan content: plan number: Index:
U=14.22m
in front of window sashes that can be opened
4:19
2.94 3.83
T30 RS BRH=1.10m
F30
PTC-BT0-ARC-3-GR-03-001-V00
BRH 10.86
C-2 C-2
WC-H Site map:
G f E A B C
door for TH2 RS 2.97m² . 03 . NA.3.8
1.70 in front of window sashes that can be opened
. 03 . NB.3.7
1.20 30 1.20 1.70
maintenance purposes tf lift 12.37m² 15.11m
BRH=1.10m
T90 RS T30 RS 20.57m² 19.03m NUF-R
F30 4.42m² courtyard 3
30
VF-R
VF-R
C-1 C-1
yard 2
2.97m² lift 1.70
1.12
30
30 tea kitchen H H
tf
11 lobby 4.42m² . 02 . NE.4.4
hours 17.5/29 . 04 . NA.4.1
TH3 33.52m² 24.63m
VF-R 17.5/29
hours
11 31.67m² 22.82m WC-D 6.34 yard 6 ND B.A
15.03 m2 . 03 . NB.3.1 2.71 30 17.5/29
hours
11
NUF-R . 03 . NA.3.7
VF-R
17.5/29
hours
11
office New construction and extension of commercial building (office) and loft conversion of an existing building
8.10 7.70
. 03 . NB.3.6
7.70 7.70
ThePettCo residential purposes
292.97m² 94.84m
8.10
TGA STATIC
specialist planner
TGAX Ltd Knippers Helbig GmbH
Kurfürstenstrasse 195 Zehdenicker Str. 21
A 40 A 10707 Berlin 10119 Berlin
43
25 28
40 48
in front of window sashes that can be opened in front of window sashes that can be opened in front of window sashes that can be opened in front of window sashes that can be opened
1.50 1.50
BRH=1.10m BRH=1.10m BRH=1.10m BRH=1.10m architects Architect design in cooperation
7 9 3
28 36 36 36 36 36 36 36 36 36 36
Axles total
In dimension
opening
2.68 2.00 8.06
G f 3.20 2.26 4:15 3.99 3.99 E 3.99 3.99A 3.99 3.99 3.99 3.99 3.99 3.99 B36 3.99 36 3.99 36 3.99 C 36 3.99 36 3.99 36
walls / supports
50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50
2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94
18:32 70.11
CAD file name:
4
Planning level:
design planning 0263_3_LP_GR_AN_SN.vwxp
4.35 4.35 4.35 4.99 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
PTC-BT0-ARC-3-GR-03-001-V00
Machine Translated by Google
4
4.35 4.35 4.35 4.99 8.70 4.35 8.85 13.30 7.47 5.18 4.35 4.35 4.35 4.35 4.35 25
5
12
8th
5
50 3.85 50 3.85 8 96 16.44 2.72 1.43 83 50 3.85 50 3.85 50 3.85 50 3.41 1.56 3.30 32 4.06 4.25 50 3.85 50 3.85 50 3.85 50 2.43 1.43 99 7.80 30
2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94
25
5
30 30 40 30 40 39 36 36 36 30 96 30 32 30 36 36 36 30 25 30 30
8th
walls / supports
4:15 5:19 7.56 7.22 5.03 3.99 3.99 3.99 3.48 3.30 4.06 2.60 30 1.12 36 3.99 3.99 3.99 1.70 2.70 7.22 walls / supports
Axles total
In total
In Axles
G f columns
walls/ dimension
axis dimension
opening
E dimension
overall
A B C
dimension
opening dimension
opening
supports
walls /
11 hours 10 hours
3.00 3.00 18/26 18/26 TH7
. 04 . BD.4.1
13.00m² 15.56m 3.00
10 hours VF-R
18/26
25 50
6 6
T30 RS 50
30
20
WC-H
1.57 1.56 30
1.82
. 04 . BD.4.3
TH8 1.52
yard 2
4.05 2.94
3.55 4.05
wood
UZ . 04 . BD.4.2 7.59m² 13.64m 25 25 50
50
T30 RS 34 50
2.70
2.94
2.58
openable
window
sashes
front
of
in
J-2 J-2
courtyard 3 in front of window sashes that can be opened
1.80 BRH=1.10m
11
hours 17.5/29
5.36
34 34 J
H 30 H
4.05 2.94
3.55 4.05 2.94
3.55
1 +15.4
3.88
16.69
4
7
1.80
11
16.75
7:12 hours 17.5/29
50 50
I-4 TH4 I-4
. 01 . NE.4.2 office office
35.67m² 28.39m . 04 . BA.4.8 . 04 . BA.4.9
VF-R
lift 1.70
25
composite
steel
UZ
+15.40 56.86m² 31.79m 38.97m² 25.02m
4.42m² 2.50m² tea kitchen NUF-R NUF-R
7.73 7.73 8.10
VF-R office
3.61
T30
RS tf . 02 . NE.4.4
. 04 . ND.4.2
yard 6 25 19.23m² 17.87m
NUF-R 363.45m² 165.32m
4.80 2.94
4.30
BRH=1.10m
electric BRH=1.10m
4.80 2.94
4.30
NUF-R
nb . 00 . NE.4.3
17.0/28
hours
7
2.69
4
4
50
2.94 1.96
. 01 . NE.4.1
323.13m² 109.87m
NUF-R
5
WC-D
. 02 . NE.4.6
9.98m² 12.70m
NUF-R
3
40 50 I-2
electric
. 04 . ND.4.5
4.38m² 8.60m
tf
4.20m²
tf
UZ steel composite
15.40
15.40
office
13.14m² 15.58m
5/2710
17
VF-R
hours
18/27
hours
9
hours
5/27
17
9
WC-H
2:12 0.89
. 04 . BA.4.3
9.32m² 13.61m
NUF-R
WC-D
2:12 0.89
. 04 . BA.4.4
9.78m² 12.88m
NUF-R
I
7.86 40 3.40 3.97 . 04 . BA.4.7
5.09 2.94
4.59 34.57m² 24.22m lobby
airspace . 04 . BA.4.5
H-3
tea kitchen WC-H NUF-R
20.03m² 28.16m
WC-H . 02 . NE.4.4 . 04 . ND.4.4
VF-R
. 02 . NE.4.5 75.45m² 41.06m 11.60m² 14.81m 6.71
6.34
6.73 6.34
6.95m² 10.97m NUF-R NUF-R
NUF-R
8th
UZ wood
50 lift WC-D
UZ wood UZ wood H-2
14.08
4.95m² . 04 . ND.4.3
VF-R Unit 4.5.
1 GFA=331m2
12.89m² 15.31m +15.40 7 hours +14.21
1 1 NUF-R 17.0/28
office
11.77
wood
UZ
8.89
8.61
8.03
. 04 . BD.4.5 39 H
230.88sqm 77.92m
TH5 NUF-R
+15.36
9.47 wood
UZ 9.47 wood
UZ
T30
RS
. 04 . BD.4.8
corridor
Terrace of 2.94
4.68
15.50m² 17.14m T30
RS in front of window sashes that can be opened
. 04 . BA.4.10
office
office unit 4.6. BRH=1.10m . 04 . BA.4.2
VF-R
48.49m² 55.67m
40.85m² 30.04m
7.08 VF-R
NUF-R 3.71 2.94
3.63
wood
UZ 4.07
16/26
3
8.48 34 8.79 40 7.37 16/26
hours
10 +14.21
Unit 4.6. terrace
50
F30 F30
16/26
hours
10
hours
11
GFA=195m2 . 04 . NC.4.9
advance deduction
9 69.73m² 38.45m
34 50 G
9 NUF-S
terrace
9 2.94
1.55
1:13 2.94
. 05 . NE.4.8 1.28
43
1.53
2.79
6
T30 RS
56.51
in front of window sashes that can be opened
openable
window
sashes
front
of
in
BRH=1.10m 4.05
Unit 4.4.
f Inside
30 4:13 34 4.01 34 4.01 34 4.01 34 1734 2.75 34 4.01 4028 GFA=425m2
16.00 +15.79
10 hours
17 5/27 _ TH10
. 04 . BA.4.1
34
D
50 f
3
13.16m² 16.04m
50 3.85 50 3.85 50 3.85 50 3.85 1.01 2.59 50 3.93 68 9 hours 9 hours VF-R
opening dimension
2.94 2.94 2.94 2.94 17 5/27 _ 17/27
E-2 1
30 7:12 68 21.20 74 5.29 30 26.98 17.0/28
hours
7 7:12 30
3
8.70 9:27
4.05 In total 3.71 2.94
3.55 4.05
19.33
19.33
30 28
50.13
T30 RS
6 1.80 6.41 21:21 46 5.08 4812 1.68 5.32 40 18.50 30 1.34 25 5.91 30
3 hours
E 34 50 E
T30 RS
courtyard 1 +15.40
T30 RS
Intensive green roof D-2
courtyard 5 16.30
16.03
courtyard 4
10 hours
4.05
18/26 TH6 firewall
3.71 2.94
3.55 4.05
D . 04 . BD.4.7
13.38m² 15.74m
4.05 11 hours 10 hours VF-R office
18/26 18/26 . 04 . NA.4.9
Intensive
greening
facade
D 10 67.96m² 33.94m 34 50 D
NUF-R
3.77 F30
8.97m2 _
4.07 3.70 2.94
3.57 4.07
bath F90 +15.43
RN: 4-2-04 Component: Planner: LP: plan type: plan content: plan number: Index:
Project:
U=14.43
in front of window sashes that can be opened
6 BRH=1.10m
F30
35
PTC-BT0-ARC-3-GR-04-001-V00
30:14
C-2 C-2
Roof area only Site map:
accessible to TH2 2.91m²
WC-H G f E A B C
1.70 in front of window sashes that can be opened 5.92m² 1.20 30 1.20 . 04 . NA.4.8
. 04 . NB.4.2
1.70
Intensive facade greening maintenance purposes BRH=1.10m tf tf
20.57m² 19.03m lift 14.61m 11.51m²
F30 F30 4.42m² NUF-R courtyard 3
VF-R
C-1
lift VF-R
C-1 yard 2
H H
2.97m² 11 4.42m² 1.70
1.12
30
30
office New construction and extension of commercial building (office) and loft conversion of an existing building
8.10
Old building C, residential building
7.70
. 03 . NB.4.6 7.70 7.70 8.10
ThePettCo residential purposes
292.96m² 94.84m office Pettenkoferstrasse 16-19, 10247 Berlin
Unit 4.1. Unit 4.2.
NUF-R . 04 . NA.4.3
24.64m2 _ 14.46 m2 19.87 m2 20 .16 m2 GFA=400m2 firewall
GFA=512m2 builder
bedroom children's room 2 children's room 3 bedroom 21.84m2 _
living room 331.55m² 98.50m
RN: 4-2-05 RN: 4-2-06 RN: 4-2-07 RN: 4-1-02 Trockland XXV Pettenkoferstrasse 16-19 GmbH
RN: 4-1-03 NUF-R
U=20.29m U=16.82m U=18.6m U=18.6m Hauptstraße 27, staircase E
U=19.24m 10827 Berlin
TGA STATIC
specialist planner
TGAX Ltd Knippers Helbig GmbH
Kurfürstenstrasse 195 Zehdenicker Str. 21
A 40 40 A 10707 Berlin 10119 Berlin
43
25 28 48
in front of window sashes that can be opened in front of window sashes that can be opened in front of window sashes that can be opened in front of window sashes that can be opened
BRH=1.10m BRH=1.10m BRH=1.10m BRH=1.10m architects Architect design in cooperation
1.50 1.50
REALACE Ltd Thomas Hillig Architects GmbH
Tempelhofer Ufer 32 Waldemarstrasse 37A
10963 Berlin 10999 Berlin
dimension
opening total
In Axles
7 9 3
28 36 36 36 36 36 36 36 36 36 36
Axles total
In dimension
opening
2.68 2.00 8.06
G f 3.20 2.26 4:15 3.99 3.99 E 3.99 3.99A 3.99 3.99 3.99 3.99 3.99 3.99 B36 3.99 36 3.99 36 3.99 C 36 3.99 36 3.99 36
walls / supports
50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50
2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94
18:32 70.11
CAD file name:
Planning level:
4.35 4.35 4.35 4.99
4
4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35 4.35
design planning 0263_3_LP_GR_AN_SN.vwxp
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
PTC-BT0-ARC-3-GR-04-001-V00
Machine Translated by Google
4
4.35 4.35 4.35 4.99 8.70 4.35 8.85 13.30 7.47 5.18 4.35 4.35 4.35 4.35 4.35 25
5
9.66
8th
5
50 3.85 50 3.85 8 96 16.44 2.72 1.43 83 50 3.85 50 3.85 50 3.85 50 3.41 1.56 3.30 32 4.06 4.25 50 3.85 50 3.85 50 3.85 50 2.43 1.43 99 7.80 30
2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94
5
25
30 4:15 30 5:19
8th
40 7.56 30 1.90 15 5:17 40 39 36 36 36 30 96 30 32 30 36 36 36 30 25 30 30
walls / supports 5.03 3.99 3.99 3.99 3.48 3.30 4.06 2.60 30 1.12 36 3.99 3.99 3.99 1.70 2.70 7.22 walls / supports
Axles total
In total
In Axles
columns
walls/ dimension
axis dimension
opening dimension
overall
dimension
opening dimension
opening
supports
walls /
TH7
10 hours . 05 . BD.5.1
3.00 3.00 18/26
13.00m² 15.56m
VF-R
LK
3.00
10 hours
18/26
25 50
6 6
1.56
T30 RS 30
1.57
1.82
TH8
1.52
11
. 05 . ND.5.1
hours 17.5/29
+19.25 20.02m² 20.03m
VF-R 2.72 2.70 2.94
9
TGA cooling
nb . 00 . NE.5.9
5.00 4.99 2.94
4.86
+19.25 11
27.15m² 20.86m
tf Open technical area hours 17.5/29 5.84 5.84
4.05 2.94
3.55
wood
UZ
4.05
25 yard 2 25 6.57
T30 RS
Technology BRH=1.10m
4.80
5
. 05 . BD.5.2
7.81 7.77 49.23m² 29.20m
T30 RS 2.94
50 34 50 tf openable
window
sashes
front
of
in
courtyard 3 protection
weather
grille
1.80 +19.25
11
hours 17.5/29
30 6.99
4.05 2.94
3.55 4.05 2.94
3.55
3.88
+19.25
4
7
1.80 2.97
17.52
7
TH4 11
7:12 . 01 . NE.2.2 hours 17.5/29
10.34
34.29m² 26.94m
17.58
50 50
VF-R
WC-D
lift 1.70
25
. 05 . BD.5.3 1.05
openable
window
sashes
front
of
in
office . 02 . NE.5.7 9.62m² 12.79m openable
window
sashes
front
of
in
2.40 VF-R . 02 . NE.4.4
. 01 . NE.5.1 20.47m² 18.49m
7.70m² 11.40m TF
303.20m² 123.20m NUF-R
NUF-R Glazed railing WC-H terrace
NUF-R BRH=1.10m . 05 . BA.5.4
15.40
50 50 . 05 . BD.5.4 +17.41
6.99m² 10.82m 328.24m² 130.57m 80
WC-D NUF-R NUF-S
. 02 . NE.5.6
3.44
5 9.98m² 12.70m electric
2.94
NUF-R . 05 . ND.5.5 4.20m² +19.25 18/27 9
hours
tf Unit 5.3.
7.82 40 3.40 3.96 tea kitchen
5.09
community
tea kitchen 5.09 2.94
4.59 . 02 . NE.4.4 GFA=105m2
. 02 . NE.5.4 9.62m² 12.58m
+19.25 +19.25
21.3/25
hours
18
UZ wood
40 50
lift
4.95m²
. 05 . ND.5.3 lounge
11.51m² 14.61m . 05 . BA.5.2
VF-R
2.00m
line
21.3/25
hours
18
NUF-R maintenance
purposes
Staircase
only
for
91.12m² 46.85m
6.52 5.66 NUF-R
Terrace of
TH5
8th
2.94
39
terrace . 05 . BD.5.8 office unit 5.5.
7.09 . 05 . NC.5.8
15.83m² 17.42m
maintenance
purposes
Staircase
only
for
T30
RS
9.47
wood
UZ wood
UZ
92.75m² 68.28m
4.83
2.94 VF-R T30
RS
3
5:15 NUF-S
8.82 16.56
Terrace of
office unit 5.6. 7.08
Unit 5.5.
Unit 5.6. 3.71 2.94
3.63
4.07
GFA=195m2
9
9
9 1:13 2.94
terrace +19.25
. 05 . NE.5.8 16/26
hours
10
+19.25
1.28
43
1.53
40 94 16/26
hours
10
10.89m² 19.48m office
advance deduction
34 50
NUF-S . 05 . BD.5.5 18.4/23
hours
10
2.94
89.69m² 45.61m
Railing BRH=1.10m
9
+19.25
1.81 NUF-R
1.53
25 1.34 0.76
53.58
(BRH 0.43) lift
4.10m²
Glazed railing 3.71
Railing BRH=1.10m +17.41
2.94
3.55 4.05
VF-R
T30
RS
1.80 6.41 21.20 28 5.04 2815 1.68 5.32 40 18.50 30 1.34 25 5.91 30
12.52 13.96
4.05
34 50
courtyard 5
courtyard 1 +19.25
17.24
firewall
3
7 6.66 11.55
In total courtyard 4
greeningintense
facade
10 hours
4.05
18/26
TH6 3.71 2.94
3.55 4.05
33 2.40 34 2 88 5 2.06
8th
dimension
opening total
In
Technology
5 8th
. 05 . NA.5.9
75
1.05
57.87m² 32.29m
2 tf index date signed changes
7
4.07 roof stock 2.37 2.37 2.37 3.77 F30
3.70 2.94
3.57 4.07
F90
1.27
49 1.45
+19.25
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
28 28
in front of window sashes that can be opened
+16,084 VF-R
17.5/29
hours
11
NUF-R 11.51m² 14.61m
15.18m2 _ +17.35
inside
3.10
m
electric lift 11 NUF-R NO NC BD
4.64
clear height 1.50 m clear height 1.50 m 3.91
. 05 . NB.5.3 TH3 lift
4.64
WC-H WC-D D D
height
clear
roof
flat
hours 17.5/29
4.71
4:11
4.71
4.13m² . 05 . NB.5.1 tea kitchen +19.25
4.79m² 9.38m . 05 . NB.5.5 . 05 . NB.5.4 4.42m²
VF-R 21.49m² 20.68m +19.25 . 02 . NE.4.4 +19.25 corridor courtyard 1
clear height flat roof tf 9.58m² 12.40m 9.57m² 12.39m VF-R
2.53
1 5
1:19
6
12 5 3.60
3
50 2.50 50 inside
3:143.10 m 12 5 1.30 5
2.03
5
6.07
VF-R 21.69m² 20.22m TH1 electric . 05 . NA.5.5 courtyard 5
NUF-R NUF-R . 05 . NA.5.4 courtyard 4
12
11 NUF-R 5.92m² . 05 . NA.5.6 4.42m² 12.16m² 17.16m
5
1.50 1.20 30 1.20
5 hours 17.5/29 tf 2.00m² 12:47 23.13m² 21.68m 4.59m² 8.76m tf VF-R
12 2.75m²
tf VF-R tf
17.72 12
5
tf 1.39
1.20
30
30
30 77
30 40
5 UZ wood UZ wood
5 60
Old building
5 B-WB NB N/A
12 12 T30 RS T30 RS
15.96
15:29
2.79
5 DGC,OKF +17.52
residential building
+17,834
1.23 1.37
. 05 . NA.5.3
5 5 G G f E A B C
12 40 1.37
12
313.34m² 103.20m
5
5 5
12.45
NUF-R +/- 0.00 = m.ü.NHN
1.50 3.20 2.67 4.88 5.31 12:18 4.88 30 4.06 30 2.90 14:17 61 5.25 1.79 5.40 33
5.1 1.07
12
62 12 Pettenkofferstrasse
12
5
172.03 m2 New construction and extension of commercial building (office) and loft conversion of an existing building
6
roof space
Old building C, residential building office ThePettCo residential purposes
8.10
110m2
G 77m2 6
7.70
. 05 . NB.5.6
7.70
Unit 5.2.
7.70 8.10
3.71
5
2.85
2
12 5 3.40
8th
40 3.55 3.51 terrace terrace terrace
. 05 . NB.5.7 . 05 . NB.5.8 terrace . 05 . NC.5.11
. 05 . NC.5.10 TGA STATIC
9.38m² 12.68m specialist planner
4 4 9.38m² 12.68m 9.45m² 12.74m
2.78
NUF-S
2.78
9.58m² 12.78m TGAX Ltd Knippers Helbig GmbH
NUF-S NUF-S
Light height 1.50 1.31
20 Light height 1.50 clear height 1.50 m
Light height 1.50 1.31
20
NUF-S Kurfürstenstrasse 195 Zehdenicker Str. 21
40 40 10707 Berlin 10119 Berlin
BRH 1.12 from OKFF BRH 1.12 from OKFF BRH 1.12 from FF BRH 1.12 from FF BRH 1.12 from OKFF 43
25 48
40 40 40 40 40 28
in front of window sashes that can be opened Glazed railing in front of window sashes that can be opened Glazed railing in front of window sashes that can be opened Glazed railing in front of window sashes that can be opened Glazed railing
4 room appartment 3 room apartment BRH=1.10m BRH=1.10m BRH=1.10m BRH=1.10m BRH=1.10m BRH=1.10m BRH=1.10m BRH=1.10m architects Architect design in cooperation
119 sqm 17.56 79 sqm
Second escape route
REALACE Ltd Thomas Hillig Architects GmbH
Second escape route
Tempelhofer Ufer 32 Waldemarstrasse 37A
18:22 10963 Berlin 10999 Berlin
dimension
opening total
In Axles
28 4:15 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36 3.99 36
Axles total
In dimension
opening
walls / supports
9 3 4 9
5 3354 2.96 7 91 1.88 1.33 1.88 1.14 1.88 1.70 2.54 1 76 33 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50 3.85 50
1.34 1.34 2.63 1.34 1.34 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94
18:22 70.11
Project: Component: Planner: LP: plan type: plan content: plan number: Index:
PTC-BT0-ARC-3-GR-05-001-V00
Machine Translated by Google
G f E A B C
VI
V
K-2 VI K-2
K
VI
yard 2
Open technical area
I-4 I-4
VI
yard 6 +22.89
71.14
Attica
NHN
3.5
0
2
+ /
V
Attica +23.50 = 71.14
+19.25
I
+23.50
71.14
Attica
=
New
Attica +19.25
H-3
21.3/25
hours
18
V roof extension
Attica +23.50
firewall
VI +22.99
Extensive roof greening H
roof extension Attica +19.65 = 67.29
maintenance
purposes
Staircase
only
for
roof terrace New
V VI
roof terrace
Intense island of green +19.25
VI V
V G
advance deduction
Railing +20.35 V Attica +23.50 / 71.14 NHN VI
Attica +19.25 Attica +23.50 = 71.14
F-2 IV V V
F-2
Railing +16.50 IV Railing +20.35
Attica +15.40 Attica +19.25
Façade 4 - 5th floor
IV
+23.50
71.14
Attica
=
f D
f
E-2
+11.06
58.70
Attica
= +15.55
63.19
Attica
= +15.55
63.19
Attica
=
E E
courtyard 1
D-2
courtyard 5 courtyard 4
VI +23.50
71.14
Attica
= +19.65
67.29
Attica
=
V Component: Planner: LP: plan type: plan content: plan number: Index:
Project:
C-2 C-2
PTC -BT0 -ARC -3 -GR -DA -001 -V00
Site map:
Attica +23.50 = 71.14 G f E A B C
III IV
Facade 4th floor
C-1 C-1 courtyard 3
Attica +18.91 / 66.55 NHN Attica +19.65 = 67.29
yard 2
H H
Façade 5th floor V
yard 6 ND B.A
Attica +23.50 = 71.14
VI NO NC BD
D D
courtyard 1
courtyard 5
courtyard 4
RWA
B B
B-WB NB N/A
V ++roof
V roofnew
new
Roof +22.18 / 69.82 NHN
G f E A B C
Extensive roof greening Extensive roof greening
+/- 0.00 = m.ü.NHN
+22.89 +22.89
Pettenkofferstrasse
VI
New construction and extension of commercial building (office) and loft conversion of an existing building
ThePettCo residential purposes
TGA STATIC
specialist planner
TGAX Ltd Knippers Helbig GmbH
VI VI Kurfürstenstrasse 195 Zehdenicker Str. 21
A VI V VI V VI V Attica +23.50 = 71.14 VI V A 10707 Berlin 10119 Berlin
V V
Railing +19.03 Railing +19.03 Attica +19.65 = 67.29 Attica +19.65 = 67.29 Attica +19.65 = 67.29 Attica +19.65 = 67.29
Parapet front +23.10 = 70.74
Attica +18.72 Attica +18.72 / 66.36 NHN Attica +18.72 architects Architect design in cooperation
REALACE Ltd Thomas Hillig Architects GmbH
Pettenkoferstrasse 19 Tempelhofer Ufer 32 Waldemarstrasse 37A
10963 Berlin 10999 Berlin
G f E A B C
Pettenkoferstrasse 16-18
CAD file name:
Planning level:
design planning 0263_3_LP_GR_AN_SN.vwxp
DEDUCTION
Floor plan roof supervision
1 2 3 4 5 6 7 8th 9 10 11 12 13 14 15 16 17 18
gez / gep: plan size: scale First hire date:
Project: Component: Planner: LP: plan type: plan content: plan number: Index: